Total Units
0
0 unit types
Carpet Area
0 ft²
0.00 m² · carpet only, excludes balcony
Blocks & Floors
0
0 floors across all blocks
Parking
0
0 garages, 0 open
Average carpet area 0 ft² (0.00 m²)Balconies 0Parking per unit 0.006 of 6 rows list no units (1 floor is empty), so they add nothing to these totals
Showing 6 of 6 rows · 3 of 12 columns
| Block | Floor | Type |
|---|---|---|
| — | — | — |
| — | — | — |
| — | — | — |
| — | — | — |
| — | — | — |
| — | — | — |
Total Plot Area
120.26 acres
4,86,676.19 m² · plot area
Residential Plots of different sizes for public and semi public plots as approved by the authorities and demarcated on approved map and accordingly the demarcation will be done on the site.
as per sanction.
Roads are proposed for the township Phase 3 are of 7 mtr, 9 mtr, 12 mtr, 18 mtr, 36 mtr & 45 mtr. Design is based of Flexible Pavement.
A pedestrian walkway is proposed as an integral component of the township development, aimed at promoting walkability and ensuring safe, accessible movement for residents. Footpaths are made with Paver Block having a thickness 80mm. Pedestrian walkway of about 2.0 mtr width at each side of 36 mtr & 45 mtr roads. Pedestrian walkway of about 2.75 mtr width at each side of 18 mtr Road. Pedestrian walkway of about 2.50 mtr width at each side of 12 mtr Road. Pedestrian walkway of about 1.5 mtr width at each side of 9 mtr Road.
For Water Supply - HDPE PE-100 PN-10 90mm-200mm diameter and DI, K9 pipes pipe 250mm-600mm is used to supply water from 6.41ML Under ground Water Tank after treatment at 7.5MLD Water Treatment Plant. The recycled water shall be supplied to each plot by pumping from Semi Underground Tank. The Water Quality Standards after treatment of the raw water from the existing source shall be as per the Bureau of Indian Standards IS: 10500-1991. The proposed pipe materials are HDPE PE-100 PN-10 upto 200mm and DI, K9 pipes above 200mm.
Sewer appurtenances such as manholes, drop manholes will be provided at appropriate locations along the sewerage network in accordance with the CPHEEO guidelines and design considerations. Size of Manholes to be used: 0.9 m to 1.80 m dia for depth from 1.65 m to 9 mtr
Drainage system made by RCC M-20 grade of size 300mmx300mm to 2800mmx1400mm and drain wall thickness 175mm-200mm.
Park and all green areas have been demarcated. Actual horticulture work shall be started after completion of civil work.
Trees of different species will be planted on the green belt, along roads, and junctions Big leaf trees will also be provided on the periphery.
Electrification plan consists of under ground cabels from Transformer to Feeder Pillars, and Distribution box of cabel size -300sqmm,250sqmm,150sqmm. Street light pole of height 9m placed at every 30meter
Note Applicable
Sewer appurtenances such as manholes, drop manholes will be provided at appropriate locations along the sewerage network in accordance with the CPHEEO guidelines and design considerations. Size of Manholes to be used: 0.9 m to 1.80 m dia for depth from 1.65 m to 9 mtr
Places has been demarked and created for GCC (Garbage Collection Centre)
Recharge wells with desilt chamber has been made in theparks of size 160mm dia and 100 meter deep, built by ISI markrigid PVC Oclass-500s/s pipe. Praposed in Phase-1
N.A.
N.A.
Public & Semi Public Facilities is being demarcated as Nursery School, Health Centre, Junior High School Integrated, Marriage Community Centre & Club.
N.A.
N.A.
Atalpuram Phase 3 is located in Agra.
Yes. Atalpuram Phase 3 is registered under UPRERAPRJ466726/09/2025 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Atalpuram Phase 3 is 25 June 2030.
Atalpuram Phase 3 is developed by AGRA DEVELOPMENT AUTHORITY.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.