Average carpet area 0 ft² (0.00 m²)Balconies 0Parking per unit 0.003 of 3 rows list no units (1 floor is empty), so they add nothing to these totals
Showing 3 of 3 rows · 3 of 12 columns
| Block | Floor | Type |
|---|---|---|
| — | — | — |
| — | — | — |
| — | — | — |
Total Plot Area
8.50 acres
34,414.25 m² · plot area
DEMARCATION OF THE PLOT IS COMPLETED BY APPOINTED SURVEY CONSULTANT
BOUNDARY WALL IS PROPOSED TO BE CONSTRUCTED AS PER SURVEY DRAWING. AND ARCHITECTURAL DRAWING 230 MM THICK BRICK WALL OF 1196 MTR LENGTH AND 3.2 MTR HEIGHT). TOTAL AREA-3828 SQ. MTR WITH RCC FOUNDATION, COLUMN, PLINTH BEAM AS PER DESIGN.
BITMEN ROAD WITH KERB STONE ON SIDES AND STONE PAVING IN FRONT OF PLOT OF 6937 SQ. MTR AREA. LENGTH-807 MTR WIDTH-8.6MTR
ALL FOOTPATHS WILL BE CONSTRUCTED AS PER THE ARCHITECTURAL SITE PLAN AND LANDSCAPE DRAWING OF 3370 SQ. MTR AREA. WITH CONCREATE PAVER ON TOP LENGTH-3370MTR WIDTH-1.0MTR
WATER SUPPLY FROM AUTHORITY /BOREWELL .FURTHER WATER TO BE COLLECTED IN UNDERGROUND WATER RESERVOIRS ,HYDRO PNEUMATIC PUMPS WITH GI RINGS AND RISERS TOTAL CAPACITY-300 KL(100+200) RCC UNDERGROUND WATER TANK WITH HYDRO PNEUMATIC PUMPS (I WORKING +1 STAND BY) TWO NUMBER OF BOREWELL -5HP PUMPS.
DWC PIPE WITH MANHOLE ,CHAMBERS AND COLLECTION CHAMBERS AND COLLECTION CHAMBER ,CONNECTION STP OVERFLOW TO CONNECTIONS WITH AUTHORITY SEWAR SYSTEM
DRAIN ARE PROVIDED IN THE OPEN AREA THAT CARRIES WATER TO RAIN WATER HARVESTING CHAMBERS PROVIDED ON THE SITE
PARKS IN THE FORM OF OPEN/GREEN AREA IS PROVIDED WHICH IS 15 PERCENT OF THE PLOT AREA I.E 4712.2 Sq.MTR BENCH OPEN GYM KIDS PLAY AREA WITH EQUIPMENT
AS PER MoEFCC NORMS ,NO OF TREES REQUIRED =1 HECTARE/50 trees =50 TREES 3.44 X 50=172 TREES
ELECTRIC SUPPLY AND STREET LIGHTING WILL BE DEVELOPED AS PER CLIENT REQUIREMENT , 2 TRANSFORMER EACH HAVING 800KVA AND LT DISTRIBUTION SYSTEM TO DESIGN AS PER NBC GUIDELINES
N/A
PROPOSED STP OF CAPACITY i.e. 250(100+150) KLD WILL BE INSTALLED FOR TREATMENT OF WASTE WATER AFTER THE TREATMENT WATER WILL BE GENERATED WHICH WILL BE ENTIRELY USE OF HORTICULTURE FOLLOWING ARRANGEMENT WILL BE MADE AT THE SITE IN ACCORDANCE TO SOLID WASTE MANAGEMENT RULE 2016, a) 60 PERCENT BIODEGRADABLE b) 30 PERCENT NON BIODEGRADABLE WASTE C) 10 PERCENT INERT WASTE, THE SOLID WASTE WILL BE SEGREGATED AT SOURCE AND COLLECTED THROUGH TRAINED EMPLOYED PERSONNELS. UNDER GROUND PREFABRICATED STP WITH INBUILT PUMPS 250KLD
DEDICATED COVERED AND ISOLATED SITE FOR STORAGE OF WASTAGE ADEQUATE NO OF COLOUR BINS GREEN, BLUE, DARK GREY SEPERATE FOR BIO DEGRADABLE AND NON BIODEGRADABLE ARE PROPOSED TO BE PROVIDED AT THE STRATEGIC LOCATION WITHIN SITE. STP SLUDGE IS PROPOSED TO BE USED FOR HORTICULTURE PURPOSE AS MANURE ORGANIC WASTE CONVERTED WILL BE INSTALLED TO CONVERT BIODEGRADABLE WASTE TO MANURE, MANURE WILL BE USED IN HORTICULTURE.500KG
ROOFTOP AREA = GROUND COVERAGE = 16887.3 SQMTR, GREEN AREA = 4712.22 SQMTR, PAVED AREA = TOTAL PLOT AREA - ROOFTOP AREA + GREEN AREA = 12815.27. RUNOFF LOAD = ROOFTOP AREA = 1203 m3 / Hr. GREEN AREA = 35.34 M3 / HR . PAVED AREA = 768.91m3/Hr TOTAL RUN OFF LOAD - 2007 m3/Hr CONSIDERING SIZE OF RECHARGE PIT SIZE WILL BE 3.5 M DIA AND 4.5M DEEP SO VOLUME OF SINGLE PIT = 43.27 M3. TOTAL RECHARGE WILL BE REQUIRED = TOTAL RUN OFF LOAD/ VOLUME OF SINGLE PIT = 12NOS Dia-3.5mtr. Depth-4.5mtr total Qty.-12
POWER REQUIREMENT FOR PROJECT IS 1595KVA. 2 NO TRANSFORMERS 800 KVA. SOURCE OF POWER FROM SEB 1595KVA MAXIMUM DEMAND. DG SETS OF TOTAL CAPACITY 250 KVA WILL BE PROVIDED FOR POWER BACK UP for COMMON AREA. SILENT DG SETS ARE PROPOSED TO REDUCE THE NOISE LEVEL AND CPCB IV NORMS WILL BE COMPILED TO CHECK THE POLLUTION. MONITORING OF THE DG SETS( STACK EMISSION) WILL BE DONE QUARTERLY HEIGHT OF THE STACKS WILL BE 30 MTR AS PER THE CPCB NORMS.
THE FIRE PROTECTION SYSTEM FOR THE PLOTS IS TO BE DESIGNED AS PER THE PROVISION OF NBC- 2016 AND THE DIRECTIONS OF LOCAL FIRE SERVICES AUTHORITY. IN ADDITION TO ABOVE, THE FIRE EXTINGUISHER SYSTEM IS TO BE DESIGNED IN ACCORDANCE WITH IS -2190.
APPLICABLE AS PER PREVAILING NORMS
N/A BECAUSE THIS RESIDENTIAL PLOTS DEVELOPMENT
DEDICATED SEPARATE ENTRY AND EXIT HAS BEEN PROPOSED TO ENTER THE PREMISES FOR BETTER SECURITY AND VEHICULAR MOVEMENT
Aspire City Phase-4 is located in Hapur.
Yes. Aspire City Phase-4 is registered under UPRERAPRJ641402/09/2026 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Aspire City Phase-4 is 7 June 2031.