Total Units
0
0 unit types
Carpet Area
0 ft²
0.00 m² · carpet only, excludes balcony
Blocks & Floors
0
0 floors across all blocks
Parking
0
0 garages, 0 open
Average carpet area 0 ft² (0.00 m²)Balconies 0Parking per unit 0.003 of 3 rows list no units (1 floor is empty), so they add nothing to these totals
Showing 3 of 3 rows · 3 of 12 columns
| Block | Floor | Type |
|---|---|---|
| — | — | — |
| — | — | — |
| — | — | — |
Total Plot Area
1.24 acres
5,007.33 m² · plot area
DEMARCATION OF THE PLOT IS COMPLETED BY APPOINTED SURVEY CONSULTANT
BOUNDARY WALL IS PROPOSED TO BE CONSTRUCTED AS PER THE SURVEY DRAWING AND ARCHITECTURAL DRAWING (230 mm thick brick wall of 112 mtr length and 3.2 mtr height). Total area-357 Sq. mtr.
BITUMEN ROAD WITH KERB STONE ON SIDES AND STONE PAVING IN FRONT OF PLOTS. LENGTH-126 MTR., WIDTH-8.6 MTR., 1081 SQ. MTR AREA.
ALL FOOTPATHS WILL BE CONSTRUCTED AS PER THE ARCHITECTURAL SITE PLAN AND LANDSCAPE DRAWING WITH PAVERS ON TOP. LENGTH-418 MTR., WIDTH-1.0, TOTAL AREA- 418 SQ. MTR.
WATER SUPPLY FROM AUTHORITY/BOREWELL FURTHER WATER TO BE COLLECTED IN UNDER GROUND WATER RESERVOIRS ,HYDRO PNEUMATIC PUMPS WITH GI RINGS AND RISERS. LENGTH-6.0 MTR, WIDTH- 3.5 MTR., HEIGHT-4.0 MTR., TOTAL CAPACITY-80 KL. RCC UNDERGROUND WATER TANK WITH HYDROPNEUMATIC PUMPS(1 WORKING + 1 STANDBY), TWO NUMBER OF BOREWELL WITH 5 HP PUMPS.
DWC PIPE WITH MANHOLE, CHAMBER AND COLLECTION CHAMBER, CONNECTION AND STP OVERFLOW TO CONNECTION WITH AUTHORITY SEWER SYSTEM. DWC PIPE, SN-8 AS PERIS16098 PART 2
DRAINS ARE PROVIDED IN THE ENTIRE OPEN AREA THAT CARRIES WATER TO RAIN WATER HARVESTING CHAMBERS PROVIDED ON THE SITE.
PARKS IN THE FORM OF OPEN/GREEN AREA IS PROVIDED WHICH IS 15 PERCENT OF THE PLOT AREA I.E 751.1 SQMT. BENCH, OPEN GYM, KIDS PLAY AREA WITH EQUIPMENTS.
AS PER MOEFCC NORMS ,NO OF TREES REQUIRED = 1HECTARE/50 TREES=0.500X50=25 TREES
ELECTRIC SUPPLY AND STREET LIGHTING WILL BE DEVELOPED AS PER CLIENT REQUIREMENT ,TRANSFORMER AND LT DISTRIBUTION SYSTEM TO DESIGN AS PER NBC GUIDELINE.
N/A
PROPOSED STP OF CAPACITY FOR BOTH PHASE-2(36KLD) AND PHASE-3(14KLD) I.E 50 KLD WILL BE INSTALLED FOR TREATMENT OF WASTE WATER. AFTER THE TREATMENT WATER WILL BE GENERATED WHICH WILL BE ENTIRELY USED FOR HORTICULTURE. FOLLOWING ARRANGEMENTS WILL BE MADE AT THE SITE IN ACCORDANCE TO SOLID WASTE MANAGEMENT RULES,2016; A) 60 PERCENT BIO-DEGRADABLE WASTE B) 30 PERCENT NON -BIODEGRADABLE WASTE C) 10 PERCENT INERT WASTE THE SOLID WASTE WILL BE SEGREGATED AT SOURCE AND COLLECTED THROUGH TRAINED EMPLOYED PERSONNELS.
DEDICATED COVERED AND ISOLATED SITE STORAGE OF WASTE. ADEQUATE NUMBER OF COLOURED BIN(GREEN ,BLUE,DAR GREY) SEPARATE FOR BIO DEGRADABLE AND NON BIODEGRADABLE ARE PROPOSED TO BE PROVIDED AT THE STRATEGIC LOCATION WITH IN SITE. ORGANIC WASTE CONVERTER WILL BE INTAL;LED TO CONVERT BIO-DEGRADABLE WASTES INTO MANURE. THE MANURE WILL BE USED IN HORTICULTURE. Organic Waste Converter (OWC) Having Size of 300 Kg
ROOF TOP AREA= GROUND COVERAGE=2645.74SQM GREEN AREA=751.10 SQM PAVED AREA=TOTAL PLOT AREA-(ROOF TOP AREA+GREEN AREA)=1610.492 SQM RUNOFF LOAD ROOF-TOP AREA=188.5 M3/HR. GREEN AREA=13.22 M3/HR. PAVED AREA=204.07 M3/HR TOTAL ROUNDOFF LOAD-665.44M3/HR CONSIDERING SIZE OF RECHARGE PIT SIZE WILL BE 3.5M DIA AND 4.5m DEEP SO, THE VOLUME OF A SINGLE PIT WILL BE -43.27 m3 TOTAL RECHARGE WILL BE REQUIRED= TOTAL RUNOFF LOAD/VOLUME OF A SINGLE PIT=3 NOS. Did-3.5 Mtr., Depth-4.5 Mtr. Total Qty-3 Nos.
POWER REQUIREMENT FOR THE PROJECT IS 682 (PHASE-2) + 228(PHASE-3)= 910 KVA. SOURCE OF POWER FROM SEB 910 KVA MAXIMUM DEMAND. SILENT DG SETS ARE PROPOSED TO REDUCE THE NOICE LEVEL AND CPCB IV NORMS WILL BE COMPILED TO CHECK THE POLLUTION. MONITORING OF THE DG SETS(STACK EMISSION) WILL BE DONE QUARTERLY. HEIGHT OF THE STACKS WILL BE 30 MTR AS PER CPCB NORMS. 1 NO. TRANSFORMERS 1000 KVA. DG SET OF TOTAL CAPACITY 300 KVA WILL BE PROVIDED FOR POWER BACKUP FOR COMMON AREA. ( COMMON FOR BOTH PHASE-2 AND PHASE-3)
THE FIRE PROTECTION SYSTEM FOR THE PLOTS IS TO BE DESIGNED AS PER THE PROVISIONS OF NBC-2016 AND THE DIRECTIONS OF THE LOCAL FIRE SERVICE AUTHORITY. IN ADDITION TO ABOVE, THE FIRE EXTINGUISHER SYSTEM IS TO BE DESIGNED IN ACCORDANCE WITH IS-2190
APPLICABLE AS PER PREVAILING NORMS.
N/A BECAUSE THIS IS RESIDENTIAL PLOTS DEVELOPMENT
DEDICATED SEPERATE ENTRY AND EXIT HAS BEEN PROPOSED TO ENTER THE PREMISES FOR BETTER SECURITY AND VEHICULAR MOVEMENT.
Aspire City Phase-3 is located in Hapur.
Yes. Aspire City Phase-3 is registered under UPRERAPRJ556161/09/2026 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Aspire City Phase-3 is 7 June 2031.
Aspire City Phase-3 is developed by ASPIRE CITY LLPRAJENDRA KUMARYATENDRA BHADANA.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.