NEWActive

ASHIANA MULBERRY PHASE IV

GURUGRAM, SOHNA
18-08-2025
Launch Date
NEW
Type
2030-08-31
Completion Date

Overview

Launch Date

18-08-2025

Completion Date

2030-08-31

RERA ID

RERA-GRG-2030-2025

Basic Details

Project NameASHIANA MULBERRY PHASE IV
Project IDRERA-GRG-2030-2025
Project TypeNEW
Applicant TypeCompany
Submission Date18-08-2025 04:34:19 PM
Builder NameASHIANA DWELLINGS PRIVATE LIMITED
CINU45400WB2014PTC201892
PANXXXX551D
Emailcontact@ashianamulberry.com
Websitehttp://ashianamulberry.com/
Phone (Mobile)8826738812
Phone (Landline)01140564056
Registered Address3H, PLAZA M6, DISTRICT CENTRE JASOLA, NEW DELHI - 110025
Project AddressSECTOR-2, OPP K.R MANGALAM UNIVERSITY
DistrictGURUGRAM
TehsilSOHNA

Bank Details

Bank NameHDFC BANK LIMITED, GK-II, NEW DELHI - 110048
Account Number50200110907420
IFSC CodeHDFC0000027
MICR Code110240005
Branch Code000027

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Rohit Raj Modi BB-16, GK Enclave-II, New Delhi - 110048
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Yes

Development Details

Land Area6758.25 (Sqr/mtrs)
Proposed FAR1.87
Permissible FAR1.87
Total Licensed Land41480.27 (Sqr/mtrs)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS1478.44
CONSTRUCTION OF ROADS1151.45
PAVEMENTS0
PARKS AND PLAYGROUNDS3908.36
GREEN BELTS0
VEHICLE PARKINGS187.5
ELECTRICITY SUB-STATION0
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER32.5
Total6758.25

Cost Details

Land Cost1817.82 Lakhs
Other Cost2995.6 Lakhs
Estimated Project Cost15098.42 Lakhs
Estimated Infrastructure Cost2940 Lakhs
Estimated Apartment Construction Cost7345 Lakhs

Documents

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 05-08-2025

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 18-08-2025

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 18-08-2025

GROUND FLOOR FAR & GROUND COVERAGE AREA DETAILS

Uploaded on: 20-11-2025

NURSERY SCHOOL_COMPRESSED

Uploaded on: 20-11-2025

PHASING DRAWING_APPROVED

Uploaded on: 20-11-2025

UNDERTAKING

Uploaded on: 20-11-2025

CA CERTIFICATE_LAND COST

Uploaded on: 20-11-2025

IDC PAYMENT RECEIPT_NOV 14

Uploaded on: 20-11-2025

2ND TO 18TH FLOOR PLAN & AREA DETAIL

Uploaded on: 20-11-2025

FIRE SCHEME ACK 16.09.2025

Uploaded on: 20-11-2025

SERVICE PLAN ESTIMATES ACK 15.09.2025

Uploaded on: 20-11-2025

19TH FLOOR PLAN & AREA DETAIL

Uploaded on: 20-11-2025

ROOM PLAN & AREA DETAILS

Uploaded on: 20-11-2025

AAI_HEIGHT NOC

Uploaded on: 20-11-2025

BANK UNDERTAKING_NEW

Uploaded on: 20-11-2025

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 20-11-2025

CA_CERTIFICATE UNSOLD INVENTORY

Uploaded on: 20-11-2025

MINING PERMISSION

Uploaded on: 20-11-2025

NCZ APPROVAL (NOC)

Uploaded on: 20-11-2025

APPROVED DRAWING 8

Uploaded on: 20-11-2025

21ST FLOOR PLAN & AREA DETAILS

Uploaded on: 20-11-2025

GROUND FLOOR PLAN

Uploaded on: 20-11-2025

APPROVED DRAWING 2

Uploaded on: 20-11-2025

ESCROW AGREEMENT PHASE IV

Uploaded on: 20-11-2025

LITIGATION DETAILS

Uploaded on: 20-11-2025

FIRST FLOOR

Uploaded on: 20-11-2025

TOWER 7 ELEVATION A& B

Uploaded on: 20-11-2025

AFFIDAVIT TREE CUTTING, FOREST PPWER LINE SHIFTING

Uploaded on: 20-11-2025

TERRACE PLAN & AREA DETAILS

Uploaded on: 20-11-2025

DEMAND DRAFTS_25 LAKHS EACH

Uploaded on: 20-11-2025

EC_ASHIANA MULBERRY

Uploaded on: 20-11-2025

APPROVED DRAWING 7

Uploaded on: 20-11-2025

APPROVED DRAWING 13

Uploaded on: 20-11-2025

APPROVED DRAWING 4

Uploaded on: 20-11-2025

APPROVED DRAWING 11

Uploaded on: 20-11-2025

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 20-11-2025

DEMARCATION PLAN

Uploaded on: 20-11-2025

APPROVED DRAWING 10

Uploaded on: 20-11-2025

BASEMENT FLOOR PLAN

Uploaded on: 20-11-2025

APPROVED DRAWING 1

Uploaded on: 20-11-2025

FINAL APPROVAL OF ELECTRIFICATION PLAN - AML_20.03.19

Uploaded on: 20-11-2025

PERT CHARTS

Uploaded on: 20-11-2025

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 20-11-2025

ZONING PLAN

Uploaded on: 20-11-2025

PHASING APPROVAL

Uploaded on: 20-11-2025

BASEMENT AREA DIAGRAM DETAILS

Uploaded on: 20-11-2025

CA_CERTIFICATE NO OUTSTANDING BANK LOAN

Uploaded on: 20-11-2025

TOWER 7 ELEVATION C & SECTION 1

Uploaded on: 20-11-2025

APPLICATION FORM NEW

Uploaded on: 20-11-2025

EDC IDC PAYMENTS_DEC 14

Uploaded on: 20-11-2025

FOREST NOC

Uploaded on: 20-11-2025

APPROVED DRAWING 3

Uploaded on: 20-11-2025

SPECIFICATION OF CONSTRUCTION

Uploaded on: 20-11-2025

22ND & 25TH FLOOR PLAN AREA DETAIL

Uploaded on: 20-11-2025

ALLOTMENT LETTER NEW

Uploaded on: 20-11-2025

CA_CERTIFICATE RE EXPENDITURE TILL 30-04-2025

Uploaded on: 20-11-2025

FINAL BUILDING PLAN APPROVAL LETTER

Uploaded on: 20-11-2025

NON ENCUMBRANCE CERTIFICATE

Uploaded on: 20-11-2025

20TH FLOOR PLAN & AREA DETAILS

Uploaded on: 20-11-2025

AFFIDAVIT RE BANK ACCOUNTS

Uploaded on: 20-11-2025

SITE PLAN_GREEN AREA

Uploaded on: 20-11-2025

APPROVED DRAWING 12

Uploaded on: 20-11-2025

SITE PLAN & AREA DETAILS

Uploaded on: 20-11-2025

APPROVED DRAWING 9

Uploaded on: 20-11-2025

CHANGES IN BUILDING PLAN

Uploaded on: 20-11-2025

SUPERIMPOSED DRAWING

Uploaded on: 20-11-2025

APPROVED DRAWING 5

Uploaded on: 20-11-2025

APPROVED DRAWING 6

Uploaded on: 20-11-2025

AFS NEW

Uploaded on: 20-11-2025

APPROVAL OF ELECTRIFICATION PLAN - AML

Uploaded on: 20-11-2025

CA CERTIFICATE_INVENTORY PHASE I & II

Uploaded on: 20-11-2025

APPROVED DRAWING 14

Uploaded on: 20-11-2025

CHANGES IN BUILDING PLAN_DRAWING

Uploaded on: 20-11-2025

ELECTRICAL LOAD CALCULATION

Uploaded on: 20-11-2025

IDC PAYMENT SCHEDULE_SEPT 25

Uploaded on: 20-11-2025

Statutory Approvals

LICENCEDate: 10-06-2014Status: ALREADY BEEN OBTAINED
ENVIRONMENT CLEARANCEDate: 18-02-2025Status: ALREADY BEEN OBTAINED
HEIGHT CLEARANCEDate: 31-08-2023Status: ALREADY BEEN OBTAINED
FOREST NOCDate: 07-02-2013Status: ALREADY BEEN OBTAINED
BUILDING PLANDate: 18-08-2025Status: ALREADY BEEN OBTAINED
ELECTRICITYDate: 20-03-2019Status: ALREADY BEEN OBTAINED
PHASINGDate: 22-05-2025Status: ALREADY BEEN OBTAINED
FIRE FIGHTING SCHEMEDate: NAStatus: YET TO FILE FOR APPROVAL
SERVICE PLAN ESTIMATESDate: NAStatus: YET TO FILE FOR APPROVAL
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSYET TO BE PREPARED
WATER SUPPLY SYSTEMYET TO BE PREPARED
STORM WATER DRAINAGEYET TO BE PREPARED
ELECTRICITY SUPPLY SYSTEMYET TO BE PREPARED
SEWAGE TREATMENT & GARBAGE DISPOSALYET TO BE PREPARED
STREET LIGHTINGYET TO BE PREPARED
SECURITY AND FIRE FIGHTINGYET TO BE PREPARED
PLAYGROUNDS AND PARKSYET TO BE PREPARED
CLUB HOUSE/COMMUNITY CENTREYET TO BE PREPARED
SHOPPING AREAYET TO BE PREPARED
RENEWABLE ENERGY SYSTEMYET TO BE PREPARED
SCHOOLYET TO BE PREPARED
HOSPITAL/DISPENSARYYET TO BE PREPARED
ANY OTHERYET TO BE PREPARED

NOC

ROADSProvider: NHAIApproval Status: Approved
WATER SUPPLYProvider: OWN ARRANGEMENTApproval Status: Pending
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: OWN ARRANGEMENTApproval Status: Pending
STORM WATER DRAINAGEProvider: OWN ARRANGEMENTApproval Status: Pending

Project Team

Authorized Representative

RAMPHAL YADAV
Name
RAMPHAL YADAV
PAN
XXXX835B
Email
contact@ashianamulberry.com
Mobile
8826738812
Landline
01140564056
Address
N-213 JALVAYU TOWERS SECTOR-56 GURUGRAM

Managing Director/CEO

ROHIT RAJ MODI
Name
ROHIT RAJ MODI
PAN
XXXX442B
Email
contact@ashianamulberry.com
Mobile
8826738812
Landline
01140564056
Address
BB-16 GK ENCLAVE-II NEW DELHI - 48

Directors

HITENDRA SANKALCHAND NAYEE
Name
HITENDRA SANKALCHAND NAYEE
PAN
XXXX193N
Email
contact@ashianamulberry.com
Mobile
8826738812
Landline
01140564056
Address
501-502 C - SAGAR ASHA NAGAR KANDIVALI EAST MUMBAI-400101
AKSHAY CHANDRA
Name
AKSHAY CHANDRA
PAN
XXXX513A
Email
contact@ashianamulberry.com
Mobile
8826738812
Landline
01140564056
Address
D-56 SECTOR-47 GAUTAM BUDH NAGAR - 201301 U.P

Contact Details

Project ContactEmail: contact@ashianamulberry.comMobile: 8826738812Landline: N/A
Project Contact PersonName: RAMPHAL YADAVEmail: contact@ashianamulberry.comMobile: 8826738812Landline: N/A

Land Details

Land Area6758.25 (Sqr/mtrs)
Proposed FAR1.87
Permissible FAR1.87
Total Licensed Land41480.27 (Sqr/mtrs)

Land Usage

Land Cost1817.82 Lakhs
Other Cost2995.6 Lakhs
Estimated Project Cost15098.42 Lakhs
Estimated Infrastructure Cost2940 Lakhs
Estimated Apartment Construction Cost7345 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other377.71
Shopping area0
Roads & Pavements155
Water Supply System51.5
Storm Water Drainage55.3
Parks and Playgrounds0
Electricity Supply System152
Clubhouse/community centres0
Sewerage treatment & garbage disposal72.5

Quarterly Infrastructure Expenditure

2026 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System0000
HVAC and Basement Electrical and Electrical Sub Station and Renewable Energy System and Electricity Supply System----
Internal Roads and Pavements and Boundary Wall----
Other0000
Parks and Playgrounds54.554.554.50
Roads & Pavements0000
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Street light and Security and Fire Fighting0010.5710.57
Water Supply System0000
Water supply and Sewarage System and Storm Water and STP and Rain Water Harvesting and Underground Water Tank----
2027 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System0000
HVAC and Basement Electrical and Electrical Sub Station and Renewable Energy System and Electricity Supply System42.342.363.4563.45
Internal Roads and Pavements and Boundary Wall25.5343417
Other0000
Parks and Playgrounds0081.7581.75
Roads & Pavements0000
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Street light and Security and Fire Fighting10.5710.5721.1321.13
Water Supply System0000
Water supply and Sewarage System and Storm Water and STP and Rain Water Harvesting and Underground Water Tank145.34145.34109109
2028 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System0000
HVAC and Basement Electrical and Electrical Sub Station and Renewable Energy System and Electricity Supply System63.4563.4542.321.15
Internal Roads and Pavements and Boundary Wall171700
Other0000
Parks and Playgrounds81.7581.7527.2527.25
Roads & Pavements0000
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Street light and Security and Fire Fighting31.731.721.1321.13
Water Supply System0000
Water supply and Sewarage System and Storm Water and STP and Rain Water Harvesting and Underground Water Tank72.6772.6772.670
2029 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0---
Electricity Supply System0---
HVAC and Basement Electrical and Electrical Sub Station and Renewable Energy System and Electricity Supply System21.15---
Internal Roads and Pavements and Boundary Wall----
Other0---
Parks and Playgrounds0---
Roads & Pavements0---
Sewerage treatment & garbage disposal0---
Shopping area0---
Storm Water Drainage0---
Street light and Security and Fire Fighting21.13---
Water Supply System0---
Water supply and Sewarage System and Storm Water and STP and Rain Water Harvesting and Underground Water Tank----

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEAS PER SPECIFICATION SHEET ATTACHED
WALL FINISHING DETAILSAS PER SPECIFICATION SHEET ATTACHED
KITCHEN DETAILSAS PER SPECIFICATION SHEET ATTACHED
BATHROOM FITTINGSAS PER SPECIFICATION SHEET ATTACHED
WOOD WORK ETCAS PER SPECIFICATION SHEET ATTACHED
DOORS AND WINDOS FRAMESAS PER SPECIFICATION SHEET ATTACHED
GLASS WORKAS PER SPECIFICATION SHEET ATTACHED
ELECTRIC FITTINGSAS PER SPECIFICATION SHEET ATTACHED
CONDUCTING AND WIRING DETAILSAS PER SPECIFICATION SHEET ATTACHED
CUPBOARD DETAILSAS PER SPECIFICATION SHEET ATTACHED
WATER STORAGEAS PER SPECIFICATION SHEET ATTACHED
LIFT DETAILSAS PER SPECIFICATION SHEET ATTACHED
EXTERNAL GLAZINGSAS PER SPECIFICATION SHEET ATTACHED
WINDOWS/GLAZINGSAS PER SPECIFICATION SHEET ATTACHED
DOORSAS PER SPECIFICATION SHEET ATTACHED
MAIN DOORSAS PER SPECIFICATION SHEET ATTACHED
INTERNAL DOORSAS PER SPECIFICATION SHEET ATTACHED
AIR CONDITIONINGAS PER SPECIFICATION SHEET ATTACHED
ELECTRICAL FITTINGSAS PER SPECIFICATION SHEET ATTACHED
CNG PIPE LINEAS PER SPECIFICATION SHEET ATTACHED
PROVISION OF WIFI AND BROADBAND FACILITYAS PER SPECIFICATION SHEET ATTACHED
EXTERNAL FINISHING/COLOUR SCHEMEAS PER SPECIFICATION SHEET ATTACHED
INTERNAL FINISHINGAS PER SPECIFICATION SHEET ATTACHED

Unit-wise Specifications

TOILET
FLOORAS PER SPECIFICATION SHEET ATTACHED
WALLSAS PER SPECIFICATION SHEET ATTACHED
CEILINGAS PER SPECIFICATION SHEET ATTACHED
COUNTERSAS PER SPECIFICATION SHEET ATTACHED
SANITARY WARE/CP FITTINGSAS PER SPECIFICATION SHEET ATTACHED
FIXTURESAS PER SPECIFICATION SHEET ATTACHED
KITCHEN
FLOORAS PER SPECIFICATION SHEET ATTACHED
WALLSAS PER SPECIFICATION SHEET ATTACHED
CEILINGAS PER SPECIFICATION SHEET ATTACHED
COUNTERSAS PER SPECIFICATION SHEET ATTACHED
FIXTURESAS PER SPECIFICATION SHEET ATTACHED
KITCHEN APPLIANCESAS PER SPECIFICATION SHEET ATTACHED
SIT-OUTS
FLOORAS PER SPECIFICATION SHEET ATTACHED
WALLS & CEILINGAS PER SPECIFICATION SHEET ATTACHED
RAILINGSAS PER SPECIFICATION SHEET ATTACHED
FIXTURESAS PER SPECIFICATION SHEET ATTACHED
BED ROOMS
FLOORAS PER SPECIFICATION SHEET ATTACHED
WALLSAS PER SPECIFICATION SHEET ATTACHED
CEILINGAS PER SPECIFICATION SHEET ATTACHED
WARDROBESAS PER SPECIFICATION SHEET ATTACHED
MASTER TOILET
FLOORAS PER SPECIFICATION SHEET ATTACHED
WALLSAS PER SPECIFICATION SHEET ATTACHED
CEILINGAS PER SPECIFICATION SHEET ATTACHED
COUNTERSAS PER SPECIFICATION SHEET ATTACHED
SANITARY WARE/CP FITTINGSAS PER SPECIFICATION SHEET ATTACHED
FITTING/FIXTURESAS PER SPECIFICATION SHEET ATTACHED
MASTER BEDROOM/DRESSROOM
FLOORAS PER SPECIFICATION SHEET ATTACHED
WALLSAS PER SPECIFICATION SHEET ATTACHED
CEILINGAS PER SPECIFICATION SHEET ATTACHED
MODULAR WARDROBESAS PER SPECIFICATION SHEET ATTACHED
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORAS PER SPECIFICATION SHEET ATTACHED
WALLSAS PER SPECIFICATION SHEET ATTACHED
CEILINGAS PER SPECIFICATION SHEET ATTACHED
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORAS PER SPECIFICATION SHEET ATTACHED
WALLS & CEILINGAS PER SPECIFICATION SHEET ATTACHED
TOILETAS PER SPECIFICATION SHEET ATTACHED
BALCONYAS PER SPECIFICATION SHEET ATTACHED

Fee Details

Payment 1
amount:200000
cheque no:25816
draft date:18-08-2025
payable to:HRERA Gurugram
payee bank:HDFC BANK
Payment 2
amount:2120563
cheque no:25948
draft date:29-09-2025
payable to:HRERA Gurugram
payee bank:HDFC BANK