ONGOINGActive

ASHIANA ANMOL PHASE I

GURUGRAM, SOHNA
30-11-2019
Launch Date
ONGOING
Type
2020-10-31
Completion Date

Overview

Launch Date

30-11-2019

Completion Date

2020-10-31

RERA ID

RERA-GRG-372-2019

Basic Details

Project NameASHIANA ANMOL PHASE I
Project IDRERA-GRG-372-2019
Project TypeONGOING
Applicant TypeCompany
Submission Date30-11-2019 03:57:28 AM
Builder NameASHIANA HOUSING LIMITED
CINL70109WB1986PLC040864
PANXXXX093P
Emailayush.gupta@ashianahousing.com
Websitehttps://www.ashianahousing.com
Phone (Mobile)9650524421
Phone (Landline)01142654265
Registered Address11G, EVEREST, 46/C, CHOWRINGHEE ROAD, KOLKATA 70071 WEST BENGAL
Project AddressVILL. DHUNELA, SECTOR - 33, TESHIL SOHNA
DistrictGURUGRAM
TehsilSOHNA

Bank Details

Bank NameHDFC BANK LIMITED, BADSHAHPUR BRANCH, BLOCK 1, GROUND FLOOR, VATIKA BUSINESS PARK, SECTOR 49, SOHNA ROAD, GURUGRAM
Account Number50200025968331
IFSC CodeHDFC0001098
MICR Code110240138
Branch Code001098

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)1. Vishal gupta, Address: W-177 GK II NEW DELHI, 2. Ankur gupta, Address: W-177 G.K-11 NEW DELHI, 3. Varun gupta, Address: 2nd floor N-5 Panchsheel park New Delhi, 4. Shantanu Haldule, Address: 3D VICTORIA RAISINA RESIDENCY GOLF COURSE EXTN ROAD SECTOR 59 GURGAON
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Uploaded

Development Details

Land Area3.80 (Acre)
Proposed FAR0.59
Permissible FAR1.75
Total Licensed Land13.3375 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS2505.766
CONSTRUCTION OF ROADS2342.74
PAVEMENTS1484
PARKS AND PLAYGROUNDS2077.90
GREEN BELTS6208.46
VEHICLE PARKINGS762.50
ELECTRICITY SUB-STATION0
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER0
Total15381.366

Cost Details

Land Cost4786.25 Lakhs
Other Cost2522.90 Lakhs
Estimated Project Cost15089.03 Lakhs
Estimated Infrastructure Cost1913.60 Lakhs
Estimated Apartment Construction Cost5866.28 Lakhs

Documents

DEMARCATION PLAN

Uploaded on: 14-02-2020

AUTHORISED SIGNATORY

Uploaded on: 14-02-2020

TOWER A-C TYPICAL FLOOR

Uploaded on: 14-02-2020

SERVICE PLAN ESTIMATES SUBMITTED

Uploaded on: 14-02-2020

SITE PLAN FOR SERVICE

Uploaded on: 14-02-2020

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 14-02-2020

LC-IV

Uploaded on: 14-02-2020

LEARNING CENTER ELEVATION

Uploaded on: 14-02-2020

LOI

Uploaded on: 14-02-2020

TOWER-A AND C PLANS-ELEVATIONS- SECTIONS AREA DIAGRAM AND CALCULATION

Uploaded on: 14-02-2020

TOWER C-C TERRACE FLOOR

Uploaded on: 14-02-2020

FIRE NOC

Uploaded on: 14-02-2020

AC- NOTH ELEVATION

Uploaded on: 14-02-2020

BC- SOUTH ELEVATION

Uploaded on: 14-02-2020

NON-ENCUMBRANCE AND LEGAL TITLE REPORT

Uploaded on: 14-02-2020

SERVICE PLAN 3

Uploaded on: 14-02-2020

FIRE SCHEME APPROVAL

Uploaded on: 14-02-2020

CC - ELEVATION

Uploaded on: 14-02-2020

SERVICE PLAN 1

Uploaded on: 14-02-2020

TOWER-B AND C PLANS-ELEVATIONS- SECTIONS AREA DIAGRAM AND CALCULATION

Uploaded on: 14-02-2020

TOWER B-C TYPICAL FLOOR

Uploaded on: 14-02-2020

ENVIRONMENT CLEARANCE

Uploaded on: 14-02-2020

BUILDING PLAN APPROVAL

Uploaded on: 14-02-2020

FEE DEMAND DRAFT

Uploaded on: 14-02-2020

SERVICE PLAN 4

Uploaded on: 14-02-2020

SERVICE PLAN 2

Uploaded on: 14-02-2020

METER ROOM PLANS AND ELEVATION SECTION AREA DIAGRAM AND CALCULATION

Uploaded on: 14-02-2020

BC- SECTION

Uploaded on: 14-02-2020

TOWER A-C TERRACE PLAN

Uploaded on: 14-02-2020

TOWER C-C TYPICAL FLOOR

Uploaded on: 14-02-2020

TOWER B-C GROUND FLOOR

Uploaded on: 14-02-2020

TOWER C-C GROUND FLOOR

Uploaded on: 14-02-2020

OC TOWER AC

Uploaded on: 14-02-2020

BASEMENT PLAN

Uploaded on: 14-02-2020

AC - SECTION

Uploaded on: 14-02-2020

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 27-11-2019

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 27-11-2019

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 27-11-2019

SITE PLAN GREEN AREA CALCULATION AND SURFACE PARKING CALCULATION

Uploaded on: 14-02-2020

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 25-11-2019

OCCUPATION CERTIFICATE

Uploaded on: 14-02-2020

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 30-11-2019

AC- SOUTH AND EAST ELEVATION

Uploaded on: 14-02-2020

TOWER A-C GROUND FLOOR

Uploaded on: 14-02-2020

TOWER B-C TERRACE PLAN

Uploaded on: 14-02-2020

Statutory Approvals

FIRE FIGHTING SCHEME APPROVALDate: 22-11-2016Status: ALREADY BEEN OBTAINED
CONSENT TO ESTABLISHDate: 01-04-2016Status: ALREADY BEEN OBTAINED
ENVIRONMENT CLEARANCEDate: 28-12-2015Status: ALREADY BEEN OBTAINED
SERVICE PLAN ESTIMATE APPROVALDate: 29-11-2017Status: ALREADY BEEN OBTAINED
FOREST NOCDate: 12-08-2014Status: ALREADY BEEN OBTAINED
AAI HEIGHT NOCDate: 30-09-2014Status: ALREADY BEEN OBTAINED
BUILDING PLAN APPROVALDate: 30-01-2015Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes
ROADS AND PAVEMENT PLANApproved: Yes
ELECTRICITY SUPPLY PLANApproved: Yes
WATER SUPPLY PLANApproved: Yes
SEWERAGE AND GARBAGE DISPOSAL PLANApproved: Yes
STROM WATER DRAINAGEApproved: Yes
10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITYApproved: No
STREET LIGHTING PLANApproved: Yes
PARKING PLANApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSSUBMITTED TO HUDA
WATER SUPPLY SYSTEMSUBMITTED TO HUDA
STORM WATER DRAINAGESUBMITTED TO HUDA
ELECTRICITY SUPPLY SYSTEMSUBMITTED TO HUDA
SEWAGE TREATMENT & GARBAGE DISPOSALSUBMITTED TO HUDA
STREET LIGHTINGSUBMITTED TO HUDA
SECURITY AND FIRE FIGHTINGSUBMITTED TO HUDA
PLAYGROUNDS AND PARKSSUBMITTED TO HUDA
CLUB HOUSE/COMMUNITY CENTRESUBMITTED TO HUDA
SHOPPING AREASUBMITTED TO HUDA
RENEWABLE ENERGY SYSTEMSUBMITTED TO HUDA
SCHOOLSUBMITTED TO HUDA
HOSPITAL/DISPENSARYSUBMITTED TO HUDA
ANY OTHERSUBMITTED TO HUDA

NOC

ROADSProvider: NAApproval Status: Pending
WATER SUPPLYProvider: HUDAApproval Status: Approved
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: HUDAApproval Status: Approved
STORM WATER DRAINAGEProvider: HUDAApproval Status: Approved

Project Team

Managing Director/CEO

VISHAL GUPTA
Name
VISHAL GUPTA
PAN
XXXX377M
Email
VISHAL@ASHIANAHOUSING.COM
Mobile
9810047420
Landline
01142654265
Address
W-177 GK II NEW DELHI

Contact Details

Project ContactEmail: AYUSH.GUPTA@ASHIANAHOUSING.COMMobile: 9650524421Landline: 01244694265
Project Contact PersonName: MS CHAUHANEmail: ms.chauhan@ashianahousing.comMobile: 9599052793Landline: 01244694265

Land Details

Land Area3.80 (Acre)
Proposed FAR0.59
Permissible FAR1.75
Total Licensed Land13.3375 (Acre)

Land Usage

Land Cost4786.25 Lakhs
Other Cost2522.90 Lakhs
Estimated Project Cost15089.03 Lakhs
Estimated Infrastructure Cost1913.60 Lakhs
Estimated Apartment Construction Cost5866.28 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other0
School91.09
Shopping area0
Security System12.31
Roads & Pavements68.56
Water Supply System25.84
Storm Water Drainage23.88
Parks and Playgrounds230.73
Renewable Energy System1283.12
Electricity Supply System137.08
Clubhouse/community centres0
Sewerage treatment & garbage disposal40.99

Quarterly Infrastructure Expenditure

2019 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0-00
Electricity Supply System0-00
Other0-00
Parks and Playgrounds0-00
Roads & Pavements0-00
Sewerage treatment & garbage disposal0-00
Shopping area0-00
Storm Water Drainage0-00
Water Supply System0-00

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSELIVING/DINING, ENTRANCE FOYER, CORRIDOR LEADING TO BEDROOMS: VITRIFIED TILES (800X800) B) BEDROOMS AND STUDY ROOM: VITRIFIED TILES (800X800) MASTER AND ALL OTHER BATHROOMS: CERAMIC TILES (300X300 OR OTHER SIZES UP TO 600X600)AND/OR COMBINATION BALCONY: CERAMIC TILES (300X300 OR OTHER SIZES UP TO 450X450 AND/OR COMBINATION) SUITABLE QUALITY GLAZED/MATT FINISH
WALL FINISHING DETAILSINTERNAL: BRICK WALL OF CLAY BRICKS/FLY ASH BRICKS/AAC BLOCKS MASTER AND ALL OTHER BATHROOMS: CERAMIC TILES UP TO 2.0 TO 2.1 M HEIGHT FROM FLOOR LEVEL AND ABOVE THE TILES - SAND-CEMENT PLASTER AND A COAT OF POP WITH COATING OF EMULSION PAINT. KITCHEN: CERAMIC TILES 0.60 METER FROM COUNTER TOP AND ABOVE THE TILES - SAND-CEMENT PLASTER AND A COAT OF POP WITH COATING OF EMULSION PAINT.
KITCHEN DETAILSSTAINLESS STEEL SINK WITH ONE BOWL OF 160-200 MM DEPTH AND A DRAIN BOARD. 1 SWIVAL TYPE SINK MIXER CP ANGLE VALVE FOR IN AND OUT OF HOT WATER GEYSER. 1 CP ANGLE VALVE FOR WATER PURIFIER UNIT/RO NO TAP IS PROVIDED BELOW SINK. PIPED LPG GAS WITH LPG METER WILL BE PROVIDED
BATHROOM FITTINGS1 WASH BASIN FITTED UNDER/OVER MARBLE/GRANITE COUNTER OR 1 RECESSED WASH BASIN FACTORY MOULDED WITH SAME VITRIFIED COUNTER LEDGE AND A PTMT FRAMED 450 X 550 MIRROR 1 FLOOR MOUNTED EWC WITH 6 LITRE CAPACITY DUAL FLUSH TYPE VITRIFIED CISTERN WITH SEAT AND SEAT COVER A GLASS CURTAIN AS PER DESIGN OF THE ARCHITECT (500MM TO 700 MM) AS A PARTITION TO SEGREGATE SHOWER AREA FROM REST OF THE AREA SHALL BE PROVIDED IN MASTER BATHROOM ONLY.
WOOD WORK ETCNA
DOORS AND WINDOS FRAMESALL DOOR FRAMES ARE FOLDED STEEL SECTIONS MAIN ENTRANCE: LAMINATED FLUSH DOOR OR FLUSH DOOR WITH BEADING OR MOULDED SKIN DOOR SHUTTER. PROVISION TO FIX MESH DOOR (MESH DOOR IS NOT PROVIDED) BEDROOMS, STUDY ROOM, MASTER AND ALL OTHER TOILETS: FLUSH DOOR OR MOULDED SKIN DOORS. KITCHEN: NO DOOR IS PROVIDED BEDROOMS, DRAWING/DINING AND KITCHEN: 2 TO 3 TRACK ALUMINIUM/UPVC FRAMED WINDOW, WITH 2 TO 3 SLIDING PANELS DEPENDING UPON SIZE WITH CLEAR FLOAT GLASS AND PROVISION FOR FLY MESH SHUTTER.
GLASS WORKNA
ELECTRIC FITTINGSMODULAR ELECTRICAL SWITCHES WITH SOCKETS AND FAN REGULATORS OF SSK/ANCHOR/NORTH WEST/LEGRAND OR EQUIVALENT
CONDUCTING AND WIRING DETAILSALL ELECTRICAL WIRING IN CONCEALED CONDUITS WITH COPPER WIRES. CONVENIENT POSITION & DISTRIBUTION OF LIGHT AND POWER PLUGS AND PROVISION FOR ELECTRICAL CHIMNEY ABOVE PLATFORM AND WATER PURIFIER POINT IN KITCHEN.
CUPBOARD DETAILSNA
WATER STORAGENA
LIFT DETAILSTWO GEARLESS HIGH SPEED AUTOMATIC LIFTS IN EACH BLOCK WITH GENERATOR BACKUP
EXTERNAL GLAZINGSNA
WINDOWS/GLAZINGSNA
DOORS35MM LAMINATED FLUSH DOOR/SKIN DOORS
MAIN DOORS35MM LAMINATED FLUSH DOOR/SKIN DOORS WITH NIGHT LATCH, MAGICEYE AND HANDLE
INTERNAL DOORS35MM LAMINATED FLUSH DOOR/SKIN DOORS WITH HANDLE
AIR CONDITIONINGNA
ELECTRICAL FITTINGSALL ELECTRICAL WIRING IN CONCEALED CONDUITS WITH COPPER WIRES.
CNG PIPE LINENA
PROVISION OF WIFI AND BROADBAND FACILITYNA
EXTERNAL FINISHING/COLOUR SCHEMENA
INTERNAL FINISHINGPLASTIC EMULSION

Unit-wise Specifications

TOILET
FLOORCERAMIC TILES (300X300 OR OTHER SIZES UP TO 600X600)AND/OR COMBINATION
WALLSCERAMIC TILES UP TO 2.0 TO 2.1 M HEIGHT FROM FLOOR LEVEL AND ABOVE THE TILES - SAND-CEMENT PLASTER AND A COAT OF POP WITH COATING OF EMULSION PAINT.
CEILING1) PLASTERED WITH EITHER- A) SAND-CEMENT MORTAR AND A COAT OF PLASTER OF PARIS OR B) GYPSUM 2) PLEASING SHADE EMULSION PAINT (PLASTIC/ACRYLIC AS PER ARCHITECT'S RECOMMENDATION) FINISH OF APPROPRIATE QUALITY.
COUNTERSNA
SANITARY WARE/CP FITTINGSNA
FIXTURESNA
KITCHEN
FLOORVITRIFIED TILES (800X800)
WALLSCERAMIC TILES 0.60 METER FROM COUNTER TOP AND ABOVE THE TILES - SAND-CEMENT PLASTER AND A COAT OF POP WITH COATING OF EMULSION PAINT.
CEILING1) PLASTERED WITH EITHER- A) SAND-CEMENT MORTAR AND A COAT OF PLASTER OF PARIS OR B) GYPSUM 2) PLEASING SHADE EMULSION PAINT (PLASTIC/ACRYLIC AS PER ARCHITECT'S RECOMMENDATION) FINISH OF APPROPRIATE QUALITY.
COUNTERSNA
FIXTURES1 STAINLESS STEEL SINK WITH ONE BOWL OF 160-200 MM DEPTH AND A DRAIN BOARD. 1 SWIVAL TYPE SINK MIXER 2 CP ANGLE VALVE FOR IN AND OUT OF HOT WATER GEYSER. 1 CP ANGLE VALVE FOR WATER PURIFIER UNIT/RO NO TAP IS PROVIDED BELOW SINK. PIPED LPG GAS WITH LPG METER WILL BE PROVIDED
KITCHEN APPLIANCESNA
SIT-OUTS
FLOORNA
WALLS & CEILINGNA
RAILINGSNA
FIXTURESNA
BED ROOMS
FLOORVITRIFIED TILES (800X800)
WALLSBRICK WALL OF CLAY BRICKS/FLY ASH BRICKS/AAC BLOCKS
CEILING1) PLASTERED WITH EITHER- A) SAND-CEMENT MORTAR AND A COAT OF PLASTER OF PARIS OR B) GYPSUM 2) PLEASING SHADE EMULSION PAINT (PLASTIC/ACRYLIC AS PER ARCHITECT'S RECOMMENDATION) FINISH OF APPROPRIATE QUALITY.
WARDROBESNA
MASTER TOILET
FLOORCERAMIC TILES (300X300 OR OTHER SIZES UP TO 600X600)AND/OR COMBINATION
WALLSCERAMIC TILES UP TO 2.0 TO 2.1 M HEIGHT FROM FLOOR LEVEL AND ABOVE THE TILES - SAND-CEMENT PLASTER AND A COAT OF POP WITH COATING OF EMULSION PAINT.
CEILING1) PLASTERED WITH EITHER- A) SAND-CEMENT MORTAR AND A COAT OF PLASTER OF PARIS OR B) GYPSUM 2) PLEASING SHADE EMULSION PAINT (PLASTIC/ACRYLIC AS PER ARCHITECT'S RECOMMENDATION) FINISH OF APPROPRIATE QUALITY.
COUNTERSNA
SANITARY WARE/CP FITTINGSNA
FITTING/FIXTURESNA
MASTER BEDROOM/DRESSROOM
FLOORVITRIFIED TILES (800X800)
WALLSNA
CEILING1) PLASTERED WITH EITHER- A) SAND-CEMENT MORTAR AND A COAT OF PLASTER OF PARIS OR B) GYPSUM 2) PLEASING SHADE EMULSION PAINT (PLASTIC/ACRYLIC AS PER ARCHITECT'S RECOMMENDATION) FINISH OF APPROPRIATE QUALITY.
MODULAR WARDROBESNA
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORVITRIFIED TILES (800X800)
WALLSBRICK WALL OF CLAY BRICKS/FLY ASH BRICKS/AAC BLOCKS
CEILINGA) SAND-CEMENT MORTAR AND A COAT OF PLASTER OF PARIS OR B) GYPSUM 2) PLEASING SHADE EMULSION PAINT (PLASTIC/ACRYLIC AS PER ARCHITECT'S RECOMMENDATION) FINISH OF APPROPRIATE QUALITY.
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORVITRIFIED TILES
WALLS & CEILINGPLASTIC EMULSION
TOILETCERAMIC TILES
BALCONYCERAMIC TILES

Fee Details

Payment 1
amount:288416
cheque no:22394
draft date:17-07-2017
payable to:HRERA Gurugram
payee bank:HDFC
Payment 2
amount:384534
cheque no:985725
draft date:15-07-2017
payable to:HRERA Gurugram
payee bank:STATE BANK OF INDIA