NEWActive

ASHIANA AMARAH PHASE 3 & 3A

GURUGRAM, HARSARU ST
31-01-2024
Launch Date
NEW
Type
2028-10-16
Completion Date

Overview

Launch Date

31-01-2024

Completion Date

2028-10-16

Total Floors

14

RERA ID

RERA-GRG-1440-2023

Basic Details

Project NameASHIANA AMARAH PHASE 3 & 3A
Project IDRERA-GRG-1440-2023
Project TypeNEW
Applicant TypeCompany
Submission Date31-01-2024 05:15:17 PM
Builder NameASHIANA HOUSING LIMITED
CINL70109WB1986PLC040864
PANXXXX093P
EmailJatin.kumar@ashianahousing.com
Websitehttps://www.ashianahousing.com/
Phone (Mobile)8826464161
Phone (Landline)01142654265
Registered Address304, SOUTHERN PARK SAKET DISTRICT CENTRE, SAKET, NEW DELHI 110017
Project AddressREVENUE ESTATE OF VILLAGE- WAZIRPUR, SECTOR 93, DISTT. GURUGRAM, HARYANA
DistrictGURUGRAM
TehsilHARSARU ST

Location

Brochures

Loading

Walkthrough

Loading

Bank Details

Bank NameICICI BANK LIMITED AND PREET VIHAR, DELHI
Account Number777705227095
IFSC CodeICIC0000037
MICR Code110229006
Branch Code000037

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Varun Gupta (Whole Time Director) N-5, Second Floor, Panchsheel Park, New Delhi.
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Yes

Development Details

Land Area4.5143 (Acre)
Proposed FAR182.976
Permissible FAR184
Total Licensed Land22.344 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS2953.684
CONSTRUCTION OF ROADS4475
PAVEMENTS0
PARKS AND PLAYGROUNDS6598.394
GREEN BELTS0
VEHICLE PARKINGS4102.84
ELECTRICITY SUB-STATION0
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER0
STREETLIGHTING3.51
STROMWATERDRAINAGE135.30
Total18268.728

Cost Details

Land Cost1439 Lakhs
Other Cost12006.50 Lakhs
Estimated Project Cost22851.36 Lakhs
Estimated Infrastructure Cost2454 Lakhs
Estimated Apartment Construction Cost6951.86 Lakhs

Documents

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 18-12-2023

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 18-12-2023

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 18-12-2023

RENEWAL OF LICENSE 41 OF 2010

Uploaded on: 18-12-2023

LC-IV

Uploaded on: 18-12-2023

ZONING PLAN

Uploaded on: 18-12-2023

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 18-12-2023

ENVIRONMENT CLEARANCE

Uploaded on: 18-12-2023

DEMARCATION PLAN

Uploaded on: 18-12-2023

SITE PLAN

Uploaded on: 18-12-2023

LAST THREE YEARS BALANCE SHEET

Uploaded on: 27-12-2023

ELECTRICITY SUPPLY PLAN

Uploaded on: 26-12-2023

STREET LIGHT PLAN

Uploaded on: 26-12-2023

SOLID WASTE MANAGEMENT PLAN

Uploaded on: 26-12-2023

LANDSCAPE PLAN

Uploaded on: 26-12-2023

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 27-12-2023

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 28-12-2023

SITE PLAN - SERVICES

Uploaded on: 31-01-2024

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 27-01-2024

ELEVATION PLAN

Uploaded on: 29-01-2024

BASEMENT 2 PLAN AND AREA CALCULATIONS

Uploaded on: 31-01-2024

FLOOR PLAN

Uploaded on: 29-01-2024

4 + 4T TYPE STILT & FIRST FLOOR PLAN & AREA CALCULATIONS (TOWER - 4)

Uploaded on: 31-01-2024

3 + 3T TYPE MUMTY & MACHINE RM. PLAN & AREA CALCULATIONS (TOWER - 2, 5, 7, 9, 10, 13, 15, 16 & 20)

Uploaded on: 31-01-2024

3+2T TYPE TYPICAL & TERRACE PLAN & AREA CALCULATIONS (TOWER-1,3,6,8,11,12,14,17,19, & 21)

Uploaded on: 31-01-2024

3+2T TYPE ELEVATIONSS A & B (TOWER -1,8,11,12,14,19 & 21

Uploaded on: 31-01-2024

BASEMENT 1 PLAN AND AREA CALCULATIONS

Uploaded on: 31-01-2024

WATER SUPPLY PLAN

Uploaded on: 29-01-2024

SITE PLAN - ARCH. & FIRE

Uploaded on: 31-01-2024

3 + 3T TYPE TYPICAL & TERRACE PLAN & AREA CALCULATIONS (TOWER - 2, 5, 7, 9, 10, 13, 15, 16 & 20)"

Uploaded on: 31-01-2024

EXTERNAL ELECTRIFICATION PLAN

Uploaded on: 29-01-2024

3+3T TYPE STILT & FIRST FLOOR PLAN & AREA CALCULATIONS (TOWER - 5,7,9,10,15 & 16

Uploaded on: 31-01-2024

COMMUNITY BUILDING GROUND FLOOR PLAN & AREA CALCULATIONS

Uploaded on: 31-01-2024

SECTIONS AND ELEVATIONS (PRIMARY SCHOOL)

Uploaded on: 31-01-2024

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 27-01-2024

DRAINAGE PLAN

Uploaded on: 29-01-2024

SITE PLAN - GREEN

Uploaded on: 31-01-2024

PODIUM PLAN AND AREA CALCULATIONS

Uploaded on: 31-01-2024

SITE PLAN - PARKING

Uploaded on: 31-01-2024

EWS & CONV. SHOPPING ELEVATIONS

Uploaded on: 31-01-2024

SERVICE PLAN APPROVAL LETTER

Uploaded on: 31-01-2024

APPROVAL OF ELECTRIFICATION PLAN

Uploaded on: 31-01-2024

ROADS AND PAVEMENT PLAN

Uploaded on: 29-01-2024

FIRE FIGHTING AND WATER SUPPLY PLAN

Uploaded on: 31-01-2024

APARTMENT PLAN

Uploaded on: 29-01-2024

PARKING PLAN

Uploaded on: 29-01-2024

3+2T TYPE MUMTY & MACHINE RM. PLAN & AREA CALCULATIONS (TOWER-1,3,6,8,11,12,14,17,19 & 21)

Uploaded on: 31-01-2024

SEWER LINE PLAN

Uploaded on: 29-01-2024

FIRE SCHEME

Uploaded on: 31-01-2024

BASEMENT - 1 & 2 STILT & PODIUM

Uploaded on: 31-01-2024

3+2T TYPE STILT & FIRST FLOOR PLAN & AREA CALCULATIONS (TOWER-1,8,11,12,14,19 & 21)

Uploaded on: 31-01-2024

3 + 3T TYPE SECTIONS 1 & 2 (TOWER - 2, 5, 7, 9,10, 13 & 20)

Uploaded on: 31-01-2024

LEARNING HUB LEVEL 1 & 2 PLAN & AREA CALCULATIONS

Uploaded on: 31-01-2024

GUARD ROOM, HT/METER ROOM AND AREA CALCULATIONS

Uploaded on: 31-01-2024

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 06-03-2024

BANK UNDERTAKING

Uploaded on: 06-03-2024

BOARD RESOLUTION FOR AUTHORIZING BANK ACCOUNT OPERATION

Uploaded on: 02-05-2024

BUILDING PLAN APPROVAL LETTER (BR-III)

Uploaded on: 02-05-2024

CA CERTIFICATE FOR FINANCIAL & INVENTORY DETAILS

Uploaded on: 02-05-2024

Statutory Approvals

ENVIRONMENTAL CLEARANCEDate: 26-11-2021Status: ALREADY BEEN OBTAINED
FOREST NOCDate: 29-12-2021Status: ALREADY BEEN OBTAINED
PORTABLE WATER ASSURANCEDate: 04-08-2021Status: ALREADY BEEN OBTAINED
AIRPORT AUTHORITY OF INDIA NOCDate: 16-08-2021Status: ALREADY BEEN OBTAINED
CONSTRUCTION WATER NOCDate: 23-07-2021Status: ALREADY BEEN OBTAINED
LICENSE OF 41 OF 2010Date: 07-06-2010Status: ALREADY BEEN OBTAINED
ELECTRIFICATION PLANDate: 11-12-2023Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSYET TO BE PREPARED
WATER SUPPLY SYSTEMYET TO BE PREPARED
STORM WATER DRAINAGEYET TO BE PREPARED
ELECTRICITY SUPPLY SYSTEMYET TO BE PREPARED
SEWAGE TREATMENT & GARBAGE DISPOSALYET TO BE PREPARED
STREET LIGHTINGYET TO BE PREPARED
SECURITY AND FIRE FIGHTINGYET TO BE PREPARED
PLAYGROUNDS AND PARKSYET TO BE PREPARED
CLUB HOUSE/COMMUNITY CENTREYET TO BE PREPARED
SHOPPING AREAYET TO BE PREPARED
RENEWABLE ENERGY SYSTEMYET TO BE PREPARED
SCHOOLYET TO BE PREPARED
HOSPITAL/DISPENSARYYET TO BE PREPARED
ANY OTHERYET TO BE PREPARED
CONSTRUCTION AND ROAD CIRCULATIONYET TO BE PREPARED
ELECTRICITY SUBSTATIONYET TO BE PREPARED
PARKINGYET TO BE PREPARED
RAIN WATER HARVESTINGYET TO BE PREPARED

NOC

ROADSProvider: HSVPApproval Status: Approved
WATER SUPPLYProvider: GMDAApproval Status: Approved
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: GMDAApproval Status: Approved
STORM WATER DRAINAGEProvider: GMDAApproval Status: Approved

Project Team

Authorized Representative

ABHIJIT JOSHI
Name
ABHIJIT JOSHI
PAN
XXXX475R
Email
abhijit.joshi@ashianahousing.com
Mobile
9829068251
Landline
01142654265
Address
PMC062 DLF PRIMUS SECTOR 82 GURUGRAM

Managing Director/CEO

VARUN GUPTA
Name
VARUN GUPTA
PAN
XXXX994P
Email
varun.gupta@ashianahousing.com
Mobile
9958562999
Landline
01142654265
Address
N52 PANSHIL PARK DELHI

Directors

NARAYAN ANAND
Name
NARAYAN ANAND
PAN
XXXX195M
Email
investorrelations@ashianahousing.com
Mobile
7015366588
Landline
01142654265
Address
D-03 Palacio No.216408 TTK Road Alwarpet Chennai 600018
PIYUL MUKHARJEE
Name
PIYUL MUKHARJEE
PAN
XXXX950H
Email
investorrelations@ashianahousing.com
Mobile
7217715399
Landline
01142654265
Address
2702 Glen Heights Hiranandani Gardens Powai Mumbai- 400076
ANKUR GUPTA
Name
ANKUR GUPTA
PAN
XXXX378E
Email
ankur@ashianahousing.com
Mobile
9810789884
Landline
01142654265
Address
3rdFloor C-8 Maharani Bagh New Delhi-110065
SONAL MATTOO
Name
SONAL MATTOO
PAN
XXXX504C
Email
investorrelations@ashianahousing.com
Mobile
7678614294
Landline
01142654265
Address
1487 Block- K Palam Vihar Gurgaon-122001 Haryana
ABHISHEK DALMIA
Name
ABHISHEK DALMIA
PAN
XXXX742K
Email
investorrelations@ashianahousing.com
Mobile
8287923078
Landline
01142654265
Address
Radha Vihar 35-B Prithviraj Road New Delhi-110011
SURAJ KRISHNA MORAJE
Name
SURAJ KRISHNA MORAJE
PAN
XXXX460L
Email
investorrelations@ashianahousing.com
Mobile
9780871178
Landline
01142654265
Address
H NO 102 Van Gogh S Garden Apartment 30 Kasturba Road Banglore Karnatka 560001

Contact Details

Project ContactEmail: jatin.kumar@ashianahousing.comMobile: 8826464161Landline: 01142654265
Project Contact PersonName: JATIN KUMAREmail: jatin.kumar@ashianahousing.comMobile: 8826464161Landline: 01142654265

Land Details

Land Area4.5143 (Acre)
Proposed FAR182.976
Permissible FAR184
Total Licensed Land22.344 (Acre)

Land Usage

Land Cost1439 Lakhs
Other Cost12006.50 Lakhs
Estimated Project Cost22851.36 Lakhs
Estimated Infrastructure Cost2454 Lakhs
Estimated Apartment Construction Cost6951.86 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other0
Shopping area0
Roads & Pavements0
Water Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Electricity Supply System0
Clubhouse/community centres0
Sewerage treatment & garbage disposal0

Quarterly Infrastructure Expenditure

2024 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres-0--
Construction of Circulation Road----
Electrical Sub Station----
Electricity Supply System-0--
Other-0--
Parking----
Parks and Playgrounds-0--
Rain Water Harvesting----
Renewable Energy----
Roads & Pavements-0--
Security and Firefighting Services----
Sewerage treatment & garbage disposal-0--
Shopping area-0--
Storm Water Drainage-0--
Street Light----
Water Supply System-0--
2025 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Construction of Circulation Road----
Electrical Sub Station----
Electricity Supply System0000
Other0000
Parking----
Parks and Playgrounds0000
Rain Water Harvesting----
Renewable Energy----
Roads & Pavements0000
Security and Firefighting Services----
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Street Light----
Water Supply System0000
2026 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Construction of Circulation Road----
Electrical Sub Station00022
Electricity Supply System00310
Other0000
Parking----
Parks and Playgrounds0000
Rain Water Harvesting00012
Renewable Energy----
Roads & Pavements0000
Security and Firefighting Services00014
Sewerage treatment & garbage disposal007071
Shopping area0000
Storm Water Drainage00056
Street Light00310
Water Supply System0000
2027 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Construction of Circulation Road036600
Electrical Sub Station6666470
Electricity Supply System004294
Other0000
Parking574000
Parks and Playgrounds0133
Rain Water Harvesting12000
Renewable Energy0008
Roads & Pavements03841230
Security and Firefighting Services045045
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage56000
Street Light----
Water Supply System164000
2028 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0---
Construction of Circulation Road----
Electrical Sub Station----
Electricity Supply System44---
Other0---
Parking----
Parks and Playgrounds1---
Rain Water Harvesting----
Renewable Energy3---
Roads & Pavements0---
Security and Firefighting Services----
Sewerage treatment & garbage disposal0---
Shopping area0---
Storm Water Drainage0---
Street Light----
Water Supply System0---

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSELIVING/DINING, ENTRANCE FOYER, CORRIDOR LEADING TO BEDROOMS: VITRIFIED TILES (600X600) OR (800X800) OR (600X1200) OR (800X1600), BEDROOMS AND STUDY ROOM: VITRIFIED TILES OR WOODEN TEXTURE TILE,(145 X 600) (600X600) OR (800X800) OR (600X1200),OPEN TERRACE: KOTA STONE/OTHER LOCAL STONE/CERAMIC TILES OF APPROPRIATE QUALITY/STONE MOSAIC FLOOR, STAIRCASE :CERAMIC TILES OR KOTA STONE OR COMBINATION LOCAL STONE OF APPROPRIATE SIZE.
WALL FINISHING DETAILSDRAWING/DINING/BEDROOMS: SAND-CEMENT PLASTER AND A COAT OF POP WITH COATING OF EMULSION PAINT.
KITCHEN DETAILS1 STAINLESS STEEL SINK WITH ONE BOWL AND A DRAIN BOARD, 1 SWIVEL TYPE SINK MIXER, 2 CP ANGLE VALVE FOR IN AND OUT OF HOT WATER GEYSER, 1 CP ANGLE VALVE FOR WATER PURIFIER UNIT/RO, NO TAP IS PROVIDED BELOW SINK, PROVISION FOR PIPED LPG GAS WITH LPG METER WILL BE PROVIDED,KITCHEN CABINETS WITH HOB, CHIMNEY, DISHWASHER. GEYSER & EXHAUST FAN.
BATHROOM FITTINGSSANITARY WARES: HINDWARE/ROCA/KOHLER/JAQUAR/AMERICAN STANDARD RAK/VITRA OR EQUIVALENT BATH FITTINGS: BASIN MIXER, WALL MIXER AND SHOWER OF JAQUAR/ROCA/AMERICAN STANDARD/ GROHE OR EQUIVALENT, OTHER ANGLE VALVE EITHER OF CP OR PTMT OF STANDARD MAKE LIKE JAL/CONTINENTAL/PRAYAG OR EQUIVALENT.
WOOD WORK ETCNOT APPLICABLE.
DOORS AND WINDOS FRAMESMAIN DOOR FRAME IN MS ARE EITHER ENAMEL PAINTED/POWDER COATED. AND OTHER MS DOOR FRAMES ARE ENAMEL PAINTED OR POWDER COATED .
GLASS WORKNOT APPLICABLE.
ELECTRIC FITTINGSALL ELECTRICAL WIRING IN CONCEALED CONDUITS WITH COPPER WIRES. CONVENIENT POSITION & DISTRIBUTION OF LIGHT AND POWER PLUGS AND PROVISION FOR ELECTRICAL CHIMNEY ABOVE PLATFORM AND WATER PURIFIER POINT IN KITCHEN. MODULAR ELECTRICAL SWITCHES WITH SOCKETS AND FAN REGULATORS OF SSK/ANCHOR/PANASONIC/NORTH WEST/LEGRAND OR EQUIVALENT,
CONDUCTING AND WIRING DETAILSNOT APPLICABLE.
CUPBOARD DETAILSNOT APPLICABLE.
WATER STORAGENOT APPLICABLE.
LIFT DETAILSNOT APPLICABLE.
EXTERNAL GLAZINGSCEMENT SAND PLASTER WITH SPRAY TEXTURE/COATING AND/OR EMULSION PAINT FINISH.
WINDOWS/GLAZINGSBEDROOMS, DRAWING/DINING AND KITCHEN: 2 TO 3 TRACK ALUMINUM/UPVC FRAMED WINDOW, WITH 2 TO 3 SLIDING PANELS DEPENDING UPON SIZE WITH 6MM TOUGHENED GLASS AND PROVISION FOR FLY MESH SHUTTER. ALL BATHROOMS/POWDER ROOM: TOP HUNG/LOUVERED WITH FROSTED GLASS/PIN HEAD NO FLY MESH SHUTTER IS BEING PROVIDED.
DOORSMAIN ENTRANCE: 1 HOUR FIRE RATED MS/ WOODEN / MS IN WOODEN FINISH SHUTTER WITH HANDLE AND LOCK SYSTEM BEDROOMS, STUDY ROOM, MASTER AND ALL OTHER TOILETS: PAINTED FLUSH DOOR OR FLUSH DOOR WITH LAMINATE OR MOULDED SKIN DOORS.
MAIN DOORSMAIN ENTRANCE: 1 HOUR FIRE RATED MS/ WOODEN / MS IN WOODEN FINISH SHUTTER WITH HANDLE AND LOCK SYSTEM
INTERNAL DOORSBEDROOMS, STUDY ROOM, MASTER AND ALL OTHER TOILETS: PAINTED FLUSH DOOR OR FLUSH DOOR WITH LAMINATE OR MOULDED SKIN DOORS.
AIR CONDITIONINGNOT APPLICABLE.
ELECTRICAL FITTINGSALL ELECTRICAL WIRING IN CONCEALED CONDUITS WITH COPPER WIRES. CONVENIENT POSITION & DISTRIBUTION OF LIGHT AND POWER PLUGS AND PROVISION FOR ELECTRICAL CHIMNEY ABOVE PLATFORM AND WATER PURIFIER POINT IN KITCHEN. MODULAR ELECTRICAL SWITCHES WITH SOCKETS AND FAN REGULATORS OF SSK/ANCHOR/PANASONIC/NORTH WEST/LEGRAND OR EQUIVALENT.
CNG PIPE LINENOT APPLICABLE.
PROVISION OF WIFI AND BROADBAND FACILITYNOT APPLICABLE.
EXTERNAL FINISHING/COLOUR SCHEMECEMENT SAND PLASTER WITH SPRAY TEXTURE/COATING AND/OR EMULSION PAINT FINISH.
INTERNAL FINISHINGGRANITE AND/OR MARBLE AND/OR QUARTZ STONE AND /VITRIFIED TILES AND/OR CERAMIC TILES AND/OR CEMENT SAND PLASTER AND/OR OTHER LOCAL STONE AND/OR COMBINATION OF ANY TWO OR MORE ITEMS WITH EMULSION PAINT FINISH (WHEREVER APPLICABLE).

Unit-wise Specifications

TOILET
FLOORCERAMIC TILES (300X300) OR (300X600) OTHER SIZES UP TO 600X600) AND/OR COMBINATION, OR WOODEN TEXTURE TILE .(196 X 1200),(200 X 1000)
WALLSCERAMIC TILES UP TO 2.0 TO 2.1 M HEIGHT FROM FLOOR LEVEL. ABOVE THE TILES - SAND-CEMENT PLASTER AND A COAT OF POP WITH COATING OF EMULSION PAINT.
CEILINGPLASTERED WITH EITHER- SAND-CEMENT MORTAR AND A COAT OF PLASTER OF PARIS OR GYPSUM PLEASING SHADE EMULSION PAINT (PLASTIC/ACRYLIC AS PER ARCHITECT'S RECOMMENDATION) FINISH OF APPROPRIATE QUALITY. COVA PATTA IN FALSE CELLING IN FOYER, LIVING-DINING AND MASTER BEDROOM & TOILETS OF EACH APARTMENT.
COUNTERSNOT APPLICABLE.
SANITARY WARE/CP FITTINGSNOT APPLICABLE.
FIXTURES1 WASH BASIN FITTED UNDER/OVER /ABOVE ON MARBLE/GRANITE /QUARTZ/ VITRIFIED TILE SLAB COUNTER OR 1 SEMI RECESSED WASH BASIN FACTORY MOULDED WITH SAME COUNTER LEDGES MENTIONED. 1 FLOOR MOUNTED EWC/ WALL HUNG EWC ALSO WITH 6 LITER CAPACITY DUAL FLUSH TYPE VITRIFIED /CONCEALED CISTERN WITH SEAT AND SEAT COVER. A GLASS PARTITION AS PER DESIGN OF THE ARCHITECT IN MASTER BATHROOM & GUEST BATHROOM ONLY. FACILITY OF VANITY BELOW WASHBASIN COUNTER IN MASTER TOILET ONLY, ETC.
KITCHEN
FLOORVITRIFIED TILES (600X600) OR (800X800) OR (600X1200) OR (800 X 1600).
WALLSCERAMIC TILES 0.60 METER FROM COUNTERTOP. ABOVE THE TILES - SAND-CEMENT PLASTER AND A COAT OF POP WITH COATING OF EMULSION PAINT.
CEILINGPLASTERED WITH EITHER- SAND-CEMENT MORTAR AND A COAT OF PLASTER OF PARIS OR GYPSUM PLEASING SHADE EMULSION PAINT (PLASTIC/ACRYLIC AS PER ARCHITECT'S RECOMMENDATION) FINISH OF APPROPRIATE QUALITY. COVA PATTA IN FALSE CELLING IN FOYER, LIVING-DINING AND MASTER BEDROOM & TOILETS OF EACH APARTMENT.
COUNTERSNOT APPLICABLE.
FIXTURES1 STAINLESS STEEL SINK WITH ONE BOWL AND A DRAIN BOARD, 1 SWIVEL TYPE SINK MIXER, 2 CP ANGLE VALVE FOR IN AND OUT OF HOT WATER GEYSER, 1 CP ANGLE VALVE FOR WATER PURIFIER UNIT/RO, NO TAP IS PROVIDED BELOW SINK, PROVISION FOR PIPED LPG GAS WITH LPG METER WILL BE PROVIDED,KITCHEN CABINETS WITH HOB, CHIMNEY, DISHWASHER. GEYSER & EXHAUST FAN.
KITCHEN APPLIANCESNOT APPLICABLE.
SIT-OUTS
FLOORNOT APPLICABLE.
WALLS & CEILINGNOT APPLICABLE.
RAILINGSNOT APPLICABLE.
FIXTURESNOT APPLICABLE.
BED ROOMS
FLOORVITRIFIED TILES OR WOODEN TEXTURE TILE,(145 X 600) (600X600) OR (800X800) OR (600X1200).
WALLSWALLS OF CLAY BRICKS/FLY ASH BRICKS/AAC BLOCKS/SOLID CONCRETE BLOCKS/HOLLOW CONCRETE BLOCKS. SAND-CEMENT PLASTER AND A COAT OF POP WITH COATING OF EMULSION PAINT.
CEILINGPLASTERED WITH EITHER- SAND-CEMENT MORTAR AND A COAT OF PLASTER OF PARIS OR GYPSUM PLEASING SHADE EMULSION PAINT (PLASTIC/ACRYLIC AS PER ARCHITECT'S RECOMMENDATION) FINISH OF APPROPRIATE QUALITY. COVA PATTA IN FALSE CELLING IN FOYER, LIVING-DINING AND MASTER BEDROOM & TOILETS OF EACH APARTMENT.
WARDROBESNOT APPLICABLE.
MASTER TOILET
FLOORCERAMIC TILES (300X300) OR (300X600) OTHER SIZES UP TO 600X600) AND/OR COMBINATION, OR WOODEN TEXTURE TILE .(196 X 1200),(200 X 1000)
WALLSCERAMIC TILES UP TO 2.0 TO 2.1 M HEIGHT FROM FLOOR LEVEL. ABOVE THE TILES - SAND-CEMENT PLASTER AND A COAT OF POP WITH COATING OF EMULSION PAINT.
CEILINGPLASTERED WITH EITHER- SAND-CEMENT MORTAR AND A COAT OF PLASTER OF PARIS OR GYPSUM PLEASING SHADE EMULSION PAINT (PLASTIC/ACRYLIC AS PER ARCHITECT'S RECOMMENDATION) FINISH OF APPROPRIATE QUALITY. COVA PATTA IN FALSE CELLING IN FOYER, LIVING-DINING AND MASTER BEDROOM & TOILETS OF EACH APARTMENT.
COUNTERSNOT APPLICABLE
SANITARY WARE/CP FITTINGSNOT APPLICABLE
FITTING/FIXTURES1 WASH BASIN FITTED UNDER/OVER /ABOVE ON MARBLE/GRANITE /QUARTZ/ VITRIFIED TILE SLAB COUNTER OR 1 SEMI RECESSED WASH BASIN FACTORY MOULDED WITH SAME COUNTER LEDGES MENTIONED. 1 FLOOR MOUNTED EWC/ WALL HUNG EWC ALSO WITH 6 LITER CAPACITY DUAL FLUSH TYPE VITRIFIED /CONCEALED CISTERN WITH SEAT AND SEAT COVER. A GLASS PARTITION AS PER DESIGN OF THE ARCHITECT IN MASTER BATHROOM & GUEST BATHROOM ONLY. FACILITY OF VANITY BELOW WASHBASIN COUNTER IN MASTER TOILET ONLY, ETC.
MASTER BEDROOM/DRESSROOM
FLOORWOODEN TEXTURE VITRIFIED TILES.(196 X 1200) OR (200 X 1000).
WALLSWALLS OF CLAY BRICKS/FLY ASH BRICKS/AAC BLOCKS/SOLID CONCRETE BLOCKS/HOLLOW CONCRETE BLOCKS. SAND-CEMENT PLASTER AND A COAT OF POP WITH COATING OF EMULSION PAINT.
CEILINGPLASTERED WITH EITHER- SAND-CEMENT MORTAR AND A COAT OF PLASTER OF PARIS OR GYPSUM PLEASING SHADE EMULSION PAINT (PLASTIC/ACRYLIC AS PER ARCHITECT'S RECOMMENDATION) FINISH OF APPROPRIATE QUALITY. COVA PATTA IN FALSE CELLING IN FOYER, LIVING-DINING AND MASTER BEDROOM & TOILETS OF EACH APARTMENT.
MODULAR WARDROBESNOT APPLICABLE
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORVITRIFIED TILES (600X600) OR (800X800) OR (600X1200) OR (800X1600).
WALLSSAND-CEMENT PLASTER AND A COAT OF POP WITH COATING OF EMULSION PAINT.
CEILINGPLASTERED WITH EITHER- SAND-CEMENT MORTAR AND A COAT OF PLASTER OF PARIS OR GYPSUM. PLEASING SHADE EMULSION PAINT (PLASTIC/ACRYLIC AS PER ARCHITECT'S RECOMMENDATION) FINISH OF APPROPRIATE QUALITY. COVA PATTA IN FALSE CELLING IN FOYER, LIVING-DINING AND MASTER BEDROOM & TOILETS OF EACH APARTMENT.
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORNOT APPLICABLE.
WALLS & CEILINGNOT APPLICABLE.
TOILETNOT APPLICABLE.
BALCONYNOT APPLICABLE.

Fee Details

Payment 1
amount:883685
cheque no:500051
draft date:19-12-2023
payable to:HRERA Gurugram
payee bank:ICICI BANK
Payment 2
amount:3200000
cheque no:526665
draft date:19-02-2024
payable to:HRERA Gurugram
payee bank:ICICI BANK