THE PROJECT CONSISTS OF 47 PLOTS RANGING BETWEEN 90-300SQM, 43 ARE RESIDENTIAL PLOTS, AND 4 ARE COMMERCIAL/SHOPPING PLOTS.
PERIPHERAL COMPOUND WALL COMPRISING FOUNDATION AND MASONRY WALL INCLUDING PLASTERING AND PAINTING AS PER DESIGN, MEASURING 2 METERS HIGH AND 324 RUNNING METERS.
THE PROJECT CONSISTS OF A CC ROAD NETWORK VARYING FROM 7.5M TO 12M. ALL ROADS WILL BE LAID IN AN AREA MEASURING 3118.24 SQM.
PAVERED FOOTPATH IS PLANNED ALONG SIDE THE ROAD ADMEASURING 1488.9 SQM.
WATER TANKS WITH ADEQUATE DISTRIBUTION MECHANISM AND CONNECTION THROUGH UNDERGROUND PIPELINES. ONE UNDERGROUND TANK IS INCLUDED WITH 1800 CUBIC LITRES CAPACITY.
SEWAGE SYSTEM IS PROPOSED AND SHALL BE CONNECTED TO THE MUNICIPAL SEWAGE SYSTEM. 34 MANHOLES ARE ALSO PROPOSEDSPANNING OVER 489 RUNNING METERS .
A SEWER DRAIN WILL BE USED AND MEASURING 1131 SQM, AND STORM WATER FROM ROADS AND OTHER LANDSCAPE AREAS SHALL BE CONNECTED TO THE SEWER DRAINANGE CHANNEL AND OVERFLOW SHALL CONNECT WITH THE MUNICIPAL DRAIN LINE.
THE GREEN AREA WILL BE PROVIDED WITH FACILITIES AND AMENITIES FOR OTHER ACTIVITIES, THE GREEN AREA WILL BE SPREAD ACROSS TWO PARKS HAVING TREES AND OTHER PLANTATIONS.
DIFFERENT TYPES OF TREES WITH DIVERSE FAUNA AND VARIOUS SPECIES ALL THROUGH THE PROJECT.
2 TRANSFORMERS OF 250 KVA SHALL BE DEPLOYED, 7 M HEIGHT, 33, SINGLE ARM POLE WITH 60 W LED LIGHTS, 29 BOLLARD LIGHTS AND 26 TREE UPLIGHTERS SHALL BE DEPLOYED.
NA
A MODULAR SEWERAGE SYSTEM IS PLANNED WITH 20 KLD, WHICH SHALL BE CONNECTED WITH THE MUNICIPAL SEWERAGE SYSTEM.
ADEQUATE GARBAGE COLLECTION AREA WILL BE PROVIDED FOR THE SOLID WASTE MANAGEMENT AS PER NORMS.
A RAINWATER HARVESTING SYSTEM IS PLANNED FOR CONSERVATION AND TO IMPROVE THE GROUND WATER LEVEL CONSISTING OF 2 PITS FOR THE SAME.
NA
NA
NA
NA
NA
Showing 1 blocks with 5 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
14290.00 m²
153816.13 ft²