Launch Date
Completion Date
RERA ID
27'08'32.74'
27'08'27.93'
NA
Stone Masonary Boundry wall.
Pavered road
Pavered footh path along the stilts.
piped water supply through Bore well.
under ground sewer system with stp.
under ground drainage with Rain water harvesting pits.
Green areas provided as per sanction.
tree plantation as per sanction along boundry wall.
under ground cabling for electricity supply.
community hall provided as per sanction.
STP being provided.
N/a
Rain Water harvesting pits being made as per sanction.
LED street lights and common area lights being used.
FIre protection norms being followed as per NBC.
na
Emergency evacuation plan being followed as per FIre Norms of NBC.
na.
Showing 3 blocks with 83 units
Total Carpet Area
22352.77 m²
240602.98 ft²
Total Units
261
3 different types
Blocks & Floors
3
10 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
13300.00 m²
143159.87 ft²