Launch Date
Completion Date
RERA ID
25.50161227078065
78.56459196231926
As per approved plans
As per approved plans
As per approved plans
As per approved plans
Deep Borewell water supply will be distributed in the colony through proper filtration by pumping.
Sewerage network of the colony will be terminated to sewage treatment plant.
Surface drainage has been designedin the colony and will be terminated to respective rain water harvesting area, which has been divide into circuit.
As per approved plans
Tree planation along road side will be done as per standard specification
As per approval from authority.
N/A
All sewage and sillage water will be treated in sewage treatment plant. the treated water will be used for flushing and horticulture.
Solid waste will collected from individual plots and disposed through govt. approved agency.
Adequate nos. of rainwater harvesting pits will be provided to conserve the rainwater.
LED lights being used for street lighting.
Yard hydrants will be provided.
Club, indoor and outdoor sports facilites.
As per standard practice and norms.
As per approved plans
Showing 1 blocks with 5 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
330933.09 m²