NewActive

Anjana Central

Agra, Uttar Pradesh
01-12-2022
Launch Date
New
Type
05-05-2027
Completion Date

Overview

Launch Date

01-12-2022

Completion Date

05-05-2027

RERA ID

UPRERAPRJ637908

Basic Details

Project TypeNew
Project CategoryCommercial
Total area in round figure (Sq.mt.)3691
Project NameAnjana Central
Registration Fee (in Rs.)47000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)54
DistrictAgra
Original Start Date-
TehsilAgra
Proposed Start Date01-12-2022
Sanctioning Competent AuthorityAgra Development Authority
Project Cost (in Lacs)6677
Proposed Completion Date05-05-2027

Location

Latitude

27.20545

Longitude

78.00467

Bank Details

Account Details
Name of the AccountPROMPT PLANNERS LLP COLLECTION ACCOUNT FOR ANJANA CENTRAL
Account Number5332634853
Bank NameCENTRAL BANK OF INDIA
Branch NameCIVIL LINES, AGRA
Branch AddressOPPOSITE MUNICIPAL CORPORATION BUILDING, CIVIL LINES, M G ROAD, AGRA
Branch StateUttar Pradesh
Branch DistrictAgra
IFSC CodeCBIN0280234
Separate Account Details
Name of the AccountPROMPT PLANNERS LLP SEPARATE BANK ACCOUNT FOR ANJANA CENTRAL
Account Number5362899576
Bank NameCENTRAL BANK OF INDIA
Branch NameCIVIL LINES, AGRA
Branch AddressOPPOSITE MUNICIPAL CORPORATION BUILDING, CIVIL LINES, M G ROAD, AGRA
Branch StateUttar Pradesh
Branch DistrictAgra
IFSC CodeCBIN0280234
Transaction Account Details
Name of the AccountPROMPT PLANNERS LLP RERA TRANSACTION ACCOUNT FOR ANJANA CENTRAL
Account Number5362900515
Bank NameCENTRAL BANK OF INDIA
Branch NameCIVIL LINES, AGRA
Branch AddressOPPOSITE MUNICIPAL CORPORATION BUILDING, CIVIL LINES, M G ROAD, AGRA
Branch StateUttar Pradesh
Branch DistrictAgra
IFSC CodeCBIN0280234

Development Works

Demarcation of Plots

Plot ghar no-3/2D khasra no-513 situated at ANJANA CINEMA MAUJA LASHKAR PUR M.G ROAD, ward haripur at district- AGRA, Approved by AGRA DEVELOPMENT AUTHORITY . Project includes commercial shops and multiplex with basement parking.

Boundary Wall

230mm wide and 4 feet high earthquake resistant boundary wall of RCC/MILD STEEL /BRICK FILLED around the construction

Road Work

Cement concrete road 8mt . wide to be constructedin internal area of the construction Internal road around the construction. All roads in project will be in combination of concrete pavers of different colours, shape , thickness. Roads will be laid over 225mm water bound macadam.

Footpaths

N/A

Water Supply Including Drinking Water Facilities

The site consists overhead and under ground water tank and water supply connection from Jal Sansthan Authority and borewell. Potable water supply from underground collection tank and pumped. the supply of water to individual shops shall be from the said UGT.

Sewer System

As per Agra Nagar Nigam Policy with sewage treatment and borewell .The sewer will be collected through a soil pipeline arrangement bends and inspection chambers leading the sewage water treatment plant agra nagar nigam and treated water will beused for irrigationand flushing purpose.

Drain

All internal drainage will be builtup by us which to be connected to main drainage provided by agra nagar nigam after getting treated from STP

Parks

N/A

Tree Planting

Plantation proposed around the building as per drawing. The trees will be planted at all suitable locations of the project and along the biundary walls.

Design For Electric Supply Including Street Lighting

As per drawing, will be routed through electric shafts, proper electric panels meters.Electric supply provided through 11/0.433KV transformers and by DG set supply for Backup.

Community Buildings

N/A

Treatment and Disposal System of Sewage and Sullage water

Sewage line will be connected to sewer line provided by NAGAR NIGAM after treated from STP Sewage shall be treated in sewage treatment plant (STP) and thereafter treated water to be used for flushing and irrigation

Solid Waste Management And Disposal System

As per Agra Nagar Nigam Policy after treated from STP. Solid waste to be collected from individual shops and stored in garbage room. Recyclable shall be processed in the compost machine .

Water Conservation System

Rainwater harvesting with chamber 4mt x 4mt and boring 300mm upto 300mt depth from ground level.

Energy Management System Including Use of Renewable Energy

Electricity supply will be taken from Torrent Power Limited and Solar Renewable Energy. Single point metering will be there for energy purchased from the grid/power supply company.

Fire Protection And Fire Safety System

As per fire drawing approved by Fire Department. Sprinker, fire doors, yardhydrants, smoke detecter and fir alarm system will be providedas applicable.

Social Infrastructure And Other Public Amenities Including Public Health Services

N/A

Emergency Evacuation Services

As per fire drawing approved by Fire Department. Fire staircase shall be provided as per the approved fire drawing for evacuation to open areas.

Other Miscellaneous Work

N/A

Documents

Registry Document

No: 694 | Date: 07-03-2018

Details of Encumbrances

Other Plan(If Any)

Proforma of Completion Certificate(Occupancy)

Other

Details of Encumbrances

Uploaded: 30-05-2023

Commencement Certificate

Uploaded: 27-04-2023

Proforma of Application Form

Uploaded: 19-05-2023

Proforma of Allotment Letter

Uploaded: 27-04-2023

Proforma of Conveyance Deed

Uploaded: 19-05-2023

Waste Disposal Plan

Uploaded: 27-04-2023

Water Supply Plan

Uploaded: 27-04-2023

Electricity Supply Plan

Uploaded: 27-04-2023

Development Work Plan

Uploaded: 27-04-2023

Affidavit

Uploaded: 29-05-2023

CA CERTIFICATE

Uploaded: 27-04-2023

ARCHITECT CERTIFICATE

Uploaded: 27-04-2023

ENGINEERS CERTIFICATE

Uploaded: 27-04-2023

Other

Uploaded: 30-05-2023

Permits

Orignal Permit NoMultiplex/01859/ADA/BP/21-22/0704/13102021
Orignal Permit Date06-05-2022
Valid Upto05-05-2027
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto05-05-2030
End Date05-05-2027
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Nehana
Contractor AddressUday Nagar, Tedi Bagiya, Agra
Architect NameVishal Agarwal
Architect AddressStudio - 7223, DLF Phase IV, Gurgaon, Haryana - 122002
Architect Licence NumberCA/90/12772
Structural Engineer NameAjay Shahani
Structural Engineer AddressS-13/25, Ground Floor, DLF Phase- III, Gurgaon, Haryana - 122002
Mobile number(Project Co-ordinator)9470411235

Land Details

AFS

Showing 1 blocks with 71 units

Property Summary

Total Carpet Area

5397.78

58101.16 ft²

Total Units

68

2 different types

Blocks & Floors

1

9 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:79.38
Balconies:0
Parking ratio:0.00 per unit

Block A(1)

71 units

Khasra Details

Total Area

3691.38

39733.65 ft²

1 plot
Plot
TypePlot
Khasra/Plot No3/2D
Area(In Sq. Mt.)3691.38

Other Details

Contractor Name (if any)Nehana
Contractor AddressUday Nagar, Tedi Bagiya, Agra
Architect NameVishal Agarwal
Architect AddressStudio - 7223, DLF Phase IV, Gurgaon, Haryana - 122002
Architect Licence NumberCA/90/12772
Structural Engineer NameAjay Shahani
Structural Engineer AddressS-13/25, Ground Floor, DLF Phase- III, Gurgaon, Haryana - 122002
Mobile number(Project Co-ordinator)9470411235
Anjana Central by PROMPT PLANNERS LLP | ReraTracker