NEWActive

ANANT RAJ ESTATE

GURUGRAM, GURGAON
28-08-2025
Launch Date
NEW
Type
2030-12-31
Completion Date

Overview

Launch Date

28-08-2025

Completion Date

2030-12-31

RERA ID

RERA-GRG-2043-2025

Basic Details

Project NameANANT RAJ ESTATE
Project IDRERA-GRG-2043-2025
Project TypeNEW
Applicant TypeCompany
Submission Date28-08-2025 01:26:47 PM
Builder NameANANT RAJ LIMITED
CINL45400HR1985PLC021622
PANXXXX972B
Emailsonu.kumar@anantrajlimited.com
Websitehttp://anantrajlimited.com
Phone (Mobile)9871147124
Phone (Landline)01143034400
Registered AddressCP-01, SECTOR 8, IMT MANESAR HARYANA -122051
Project AddressSECTOR 63A, GURUGRAM
DistrictGURUGRAM
TehsilGURGAON

Bank Details

Bank NameSTATE BANK OF INDIA
Account Number44545817118
IFSC CodeSBIN0006199
MICR Code110002192
Branch Code006199

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.Yes
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Mr Amit Sarin, Mr. Aman Sarin, H-65, Connaught Circus, New Delhi -110001
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)CA certificate submitted

Development Details

Land Area6.075 (Acre)
Proposed FAR1
Permissible FAR1
Total Licensed Land121.06825 (Acre)

Land Usage

PLOTS TO BE SOLD3.182
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0
CONSTRUCTION OF ROADS1.7549
PAVEMENTS0
PARKS AND PLAYGROUNDS0.424
GREEN BELTS0
VEHICLE PARKINGS0
ELECTRICITY SUB-STATION0
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER0
COMMERCIAL0.4671
NURSING0.247
Total6.075

Cost Details

Land Cost6820.55 Lakhs
Other Cost2986.40 Lakhs
Estimated Project Cost11425.79 Lakhs
Estimated Infrastructure Cost1618.84 Lakhs
Estimated Apartment Construction Cost0.00 Lakhs

Documents

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 28-08-2025

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 20-08-2025

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 28-08-2025

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 20-08-2025

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 25-08-2025

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 20-08-2025

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 20-08-2025

ZONING PLAN

Uploaded on: 20-08-2025

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 20-08-2025

DEMARCATION PLAN

Uploaded on: 28-08-2025

PROJECT REPORT

Uploaded on: 17-10-2025

COLLABORATION AGREEMENTS

Uploaded on: 17-10-2025

BROCHURE AND ADVERTISEMENT DOCUMENTS

Uploaded on: 17-10-2025

ESCROW AGREEMENT WITH BANK

Uploaded on: 17-10-2025

CA CERTIFICATE FOR NON DEFAULT

Uploaded on: 17-10-2025

NEC

Uploaded on: 17-10-2025

APPLICATION FORM

Uploaded on: 17-10-2025

COPY OF AADHAAR CARD OF THE PERSON OPERATING THE ACCOUNT

Uploaded on: 17-10-2025

ANNUAL REPORT

Uploaded on: 17-10-2025

LC IV

Uploaded on: 17-10-2025

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 17-10-2025

TREE CUTTING PERMISSION

Uploaded on: 17-10-2025

MUTATION

Uploaded on: 17-10-2025

ELECTRICAL LOAD AVAILABILITY CONNECTION

Uploaded on: 17-10-2025

LOI

Uploaded on: 17-10-2025

INFORMATION TO REVENUE DEPARTMENT

Uploaded on: 17-10-2025

COPY OF ADDRESS PROOF OF THE PERSON OPERATING THE ACCOUNT

Uploaded on: 17-10-2025

COLLAB SHARE

Uploaded on: 17-10-2025

FOREST

Uploaded on: 17-10-2025

AKS SHAJRA

Uploaded on: 17-10-2025

MUTATION

Uploaded on: 17-10-2025

ALLOTMENT LETTER

Uploaded on: 17-10-2025

CONVEYANCE DEED

Uploaded on: 17-10-2025

CA CERTIFICATE FOR NON DEFAULT

Uploaded on: 17-10-2025

CA CERTIFICATE FOR FINANCIAL & INVENTORY DETAILS

Uploaded on: 17-10-2025

COPY OF DEMAND DRAFTBANKERS CHEQUE SUBMITTED EARLIER AND COPY OF DEMAND DRAFTBANKERS CHEQUE FOR DEFICIT FEE

Uploaded on: 17-10-2025

JAMABANDI

Uploaded on: 17-10-2025

CA CERTIFICATE FOR COST INCURRED UP TO THE DATE OF EXTENTION OF REGISTRATION AS PER BOOKS OF AC

Uploaded on: 17-10-2025

COPY OF AADHAAR CARD OF THE PERSON OPERATING THE ACCOUNT

Uploaded on: 17-10-2025

COPY OF PAN CARD OF THE ACCOUNT HOLDER

Uploaded on: 17-10-2025

SALE DEED

Uploaded on: 17-10-2025

SEARCH REPORT DTD 15.10.2025

Uploaded on: 17-10-2025

COLLABORATION AGREEMENTS

Uploaded on: 17-10-2025

BUILDER BUYER AGREEMENT

Uploaded on: 17-10-2025

ENVIRONMENT CLEARANCE APPLICATION

Uploaded on: 17-10-2025

ANNUAL REPORT

Uploaded on: 17-10-2025

LAYOUT PLAN

Uploaded on: 17-10-2025

PERT CHART

Uploaded on: 17-10-2025

PROJECT REPORT

Uploaded on: 17-10-2025

PRESCRIBED FORM ROC

Uploaded on: 17-10-2025

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 17-10-2025

LC IV

Uploaded on: 17-10-2025

ENVIRONMENT CLEARANCE APPLICATION

Uploaded on: 17-10-2025

NATURAL CONSERVATION ZONE NOC

Uploaded on: 17-10-2025

AFFIDAVIT NATURAL CONSERVATION ZONE NOC

Uploaded on: 17-10-2025

ROC STATEMENT SHOWING DETAIL OF CHARGE ON THE PROJECT

Uploaded on: 17-10-2025

AFFIDAVIT OF PROMOTER REGARDING ARRANGEMENT WITH THE BANK OF MASTER ACCOUNT

Uploaded on: 17-10-2025

OCCUPATION CERTIFICATE OF COMPLETE PHASES IN CASE OF ONGOING PROJECT

Uploaded on: 17-10-2025

PAYMENT RECEIPT

Uploaded on: 17-10-2025

Statutory Approvals

ASSURANCE OF STORM WATER DRAINAGE BY GMDADate: 24-03-2025Status: ALREADY BEEN OBTAINED
ASSURANCE OF SEWERAGE BY GMDADate: 10-03-2025Status: ALREADY BEEN OBTAINED
DEMARCATION PLANDate: NAStatus: ALREADY BEEN OBTAINED
LICENSE NO 211 OF 2023Date: 18-10-2023Status: ALREADY BEEN OBTAINED
ZONING PLANDate: 04-04-2025Status: ALREADY BEEN OBTAINED
LICENSE NO 119 OF 2011Date: 28-12-2011Status: ALREADY BEEN OBTAINED
LICENSE NO 71 OF 2014Date: 29-07-2014Status: ALREADY BEEN OBTAINED
ASSURANCE OF ELECTRICITY BY DHBVNDate: 07-06-2017Status: ALREADY BEEN OBTAINED
PHASING APPROVAL BY DTCPDate: 25-08-2025Status: ALREADY BEEN OBTAINED
ENVIRONMENT CLERANCEDate: 21-01-2025Status: APPLIED FOR BUT YET TO RECEIVE
SERVICE PLAN ESTIMATEDate: NAStatus: APPLIED FOR BUT YET TO RECEIVE
LICENSE NO 104 OF 2019Date: 07-09-2019Status: APPLIED FOR BUT YET TO RECEIVE
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: No
Site PlanApproved: Yes
Floor PlanApproved: No
Apartment PlansApproved: No
Elevation SectionApproved: No
Detail of Permissible FARApproved: No
Detail of covered area achieved FARApproved: No

Facilities

INTERNAL ROADS AND PAVEMENTSAS PER PROJECT REPORT
WATER SUPPLY SYSTEMAS PER PROJECT REPORT
STORM WATER DRAINAGEAS PER PROJECT REPORT
ELECTRICITY SUPPLY SYSTEMAS PER PROJECT REPORT
SEWAGE TREATMENT & GARBAGE DISPOSALAS PER PROJECT REPORT
STREET LIGHTINGAS PER PROJECT REPORT
SECURITY AND FIRE FIGHTINGAS PER PROJECT REPORT
PLAYGROUNDS AND PARKSAS PER PROJECT REPORT
CLUB HOUSE/COMMUNITY CENTREAS PER PROJECT REPORT
SHOPPING AREAAS PER PROJECT REPORT
RENEWABLE ENERGY SYSTEMAS PER PROJECT REPORT
SCHOOLYET TO BE PREPARED
HOSPITAL/DISPENSARYYET TO BE PREPARED
ANY OTHERYET TO BE PREPARED
NURSING HOME SITEAS PER PROJECT REPORT
ELECTRIC SUB STATIONAS PER PROJECT REPORT
RAIN WATER HARVESTINGAS PER PROJECT REPORT
UNDERGROUND WATER TANKAS PER PROJECT REPORT

NOC

ROADSProvider: GMDAApproval Status: Pending
WATER SUPPLYProvider: GMDAApproval Status: Pending
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: GMDAApproval Status: Approved
STORM WATER DRAINAGEProvider: GMDAApproval Status: Approved

Project Team

Authorized Representative

AKHIL KUMAR
Name
AKHIL KUMAR
PAN
XXXX883J
Email
akhil.kumar@anantrajlimited.com
Mobile
8527333662
Landline
01143034463
Address
965 HEWO Apartment-II GH-41 Sector -56 Gurgaon Haryana -122001

Managing Director/CEO

AMIT SARIN
Name
AMIT SARIN
PAN
XXXX322K
Email
ravinder@anantrajlimited.com
Mobile
8527333662
Landline
01143034400
Address
28 Sri Ram Road Civil Line Delhi -110054

Directors

AMAN SARIN
Name
AMAN SARIN
PAN
XXXX323J
Email
ravinder@anantrajlimited.com
Mobile
8130120066
Landline
01143034400
Address
28 Sri Ram Road Civil Line Delhi -110054

Contact Details

Project ContactEmail: info@anantrajlimited.comMobile: 8527333662Landline: 01143034463
Project Contact PersonName: AKHIL KUMAREmail: akhil.kumar@anantrajlimited.comMobile: 8527333662Landline: 01143034463

Land Details

Land Area6.075 (Acre)
Proposed FAR1
Permissible FAR1
Total Licensed Land121.06825 (Acre)

Land Usage

Land Cost6820.55 Lakhs
Other Cost2986.40 Lakhs
Estimated Project Cost11425.79 Lakhs
Estimated Infrastructure Cost1618.84 Lakhs
Estimated Apartment Construction Cost0.00 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other0
Shopping area0
Roads & Pavements0
Water Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Electricity Supply System0
Clubhouse/community centres0
Sewerage treatment & garbage disposal0

Quarterly Infrastructure Expenditure

2025 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres---0
Commercial site services on plot level----
Electric Sub Station----
Electric Sub station----
Electric Substation----
Electricity Supply System---0
External Boundary Wall and Railing---24.17
External Boundary wall and railing----
External BoundaryWall and Railing----
Nursing home site services on plot level----
Other---0
Parks and Playgrounds---0
Rain Water harvesting----
Rain water harvesting----
Renewable energy system----
Renewable energy systems----
Roads & Pavements---0
Security and fire fighting----
Sewerage System---0
Sewerage treatment & garbage disposal---0
Shopping area---0
Storm Water Drainage---0
Street Lighting----
Street lighting----
Underground water tank----
Water Supply System---0
2026 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Commercial site services on plot level----
Electric Sub Station----
Electric Sub station----
Electric Substation----
Electricity Supply System0000
External Boundary Wall and Railing----
External Boundary wall and railing24.17---
External BoundaryWall and Railing-24.17--
Nursing home site services on plot level----
Other0000
Parks and Playgrounds0018.1218.12
Rain Water harvesting----
Rain water harvesting----
Renewable energy system----
Renewable energy systems----
Roads & Pavements00019.9
Security and fire fighting----
Sewerage System17.7717.7717.77-
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage025.8225.8225.82
Street Lighting----
Street lighting----
Underground water tank----
Water Supply System0023.0823.08
2027 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Commercial site services on plot level----
Electric Sub Station--100.88-
Electric Sub station----
Electric Substation---100.88
Electricity Supply System0108.24108.24108.24
External Boundary Wall and Railing----
External Boundary wall and railing----
External BoundaryWall and Railing----
Nursing home site services on plot level----
Other0000
Parks and Playgrounds0000
Rain Water harvesting11.42---
Rain water harvesting-11.4211.42-
Renewable energy system----
Renewable energy systems----
Roads & Pavements19.919.900
Security and fire fighting---11.28
Sewerage System----
Sewerage treatment & garbage disposal0056.1256.12
Shopping area0000
Storm Water Drainage0000
Street Lighting19.5---
Street lighting-19.519.49-
Underground water tank---11.85
Water Supply System23.08000
2028 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Commercial site services on plot level-17.7517.7517.75
Electric Sub Station----
Electric Sub station100.88100.88--
Electric Substation----
Electricity Supply System0000
External Boundary Wall and Railing----
External Boundary wall and railing----
External BoundaryWall and Railing----
Nursing home site services on plot level--13.1413.14
Other0000
Parks and Playgrounds0000
Rain Water harvesting----
Rain water harvesting----
Renewable energy system-0.55--
Renewable energy systems--0.550.55
Roads & Pavements0000
Security and fire fighting11.2811.28--
Sewerage System----
Sewerage treatment & garbage disposal56.12000
Shopping area0000
Storm Water Drainage0000
Street Lighting----
Street lighting----
Underground water tank11.8511.84--
Water Supply System0000
2029 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Commercial site services on plot level17.7517.7517.7517.75
Electric Sub Station----
Electric Sub station----
Electric Substation----
Electricity Supply System0000
External Boundary Wall and Railing----
External Boundary wall and railing----
External BoundaryWall and Railing----
Nursing home site services on plot level13.1413.1413.1413.14
Other0000
Parks and Playgrounds0000
Rain Water harvesting----
Rain water harvesting----
Renewable energy system----
Renewable energy systems----
Roads & Pavements0000
Security and fire fighting----
Sewerage System----
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Street Lighting----
Street lighting----
Underground water tank----
Water Supply System0000

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSENOT APPLICABLE
WALL FINISHING DETAILSNOT APPLICABLE
KITCHEN DETAILSNOT APPLICABLE
BATHROOM FITTINGSNOT APPLICABLE
WOOD WORK ETCNOT APPLICABLE
DOORS AND WINDOS FRAMESNOT APPLICABLE
GLASS WORKNOT APPLICABLE
ELECTRIC FITTINGSNOT APPLICABLE
CONDUCTING AND WIRING DETAILSNOT APPLICABLE
CUPBOARD DETAILSNOT APPLICABLE
WATER STORAGENOT APPLICABLE
LIFT DETAILSNOT APPLICABLE
EXTERNAL GLAZINGSNOT APPLICABLE
WINDOWS/GLAZINGSNOT APPLICABLE
DOORSNOT APPLICABLE
MAIN DOORSNOT APPLICABLE
INTERNAL DOORSNOT APPLICABLE
AIR CONDITIONINGNOT APPLICABLE
ELECTRICAL FITTINGSNOT APPLICABLE
CNG PIPE LINENOT APPLICABLE
PROVISION OF WIFI AND BROADBAND FACILITYNOT APPLICABLE
EXTERNAL FINISHING/COLOUR SCHEMENOT APPLICABLE
INTERNAL FINISHINGNOT APPLICABLE

Unit-wise Specifications

TOILET
FLOORNOT APPLICABLE
WALLSNOT APPLICABLE
CEILINGNOT APPLICABLE
COUNTERSNOT APPLICABLE
SANITARY WARE/CP FITTINGSNOT APPLICABLE
FIXTURESNOT APPLICABLE
KITCHEN
FLOORNOT APPLICABLE
WALLSNOT APPLICABLE
CEILINGNOT APPLICABLE
COUNTERSNOT APPLICABLE
FIXTURESNOT APPLICABLE
KITCHEN APPLIANCESNOT APPLICABLE
SIT-OUTS
FLOORNOT APPLICABLE
WALLS & CEILINGNOT APPLICABLE
RAILINGSNOT APPLICABLE
FIXTURESNOT APPLICABLE
BED ROOMS
FLOORNOT APPLICABLE
WALLSNOT APPLICABLE
CEILINGNOT APPLICABLE
WARDROBESNOT APPLICABLE
MASTER TOILET
FLOORNOT APPLICABLE
WALLSNOT APPLICABLE
CEILINGNOT APPLICABLE
COUNTERSNOT APPLICABLE
SANITARY WARE/CP FITTINGSNOT APPLICABLE
FITTING/FIXTURESNOT APPLICABLE
MASTER BEDROOM/DRESSROOM
FLOORNOT APPLICABLE
WALLSNOT APPLICABLE
CEILINGNOT APPLICABLE
MODULAR WARDROBESNOT APPLICABLE
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORNOT APPLICABLE
WALLSNOT APPLICABLE
CEILINGNOT APPLICABLE
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORNOT APPLICABLE
WALLS & CEILINGNOT APPLICABLE
TOILETNOT APPLICABLE
BALCONYNOT APPLICABLE

Fee Details

Payment 1
amount:245847
cheque no:698978
draft date:27-08-2025
payable to:HRERA Gurugram
payee bank:STATE BANK OF INDIA
Payment 2
amount:264746
cheque no:698784
draft date:11-04-2025
payable to:HRERA Gurugram
payee bank:RS.264746/- ADJUSTED FROM RERA-GRG-PROJ-1921-2025
Payment 3
amount:532253
cheque no:698469
draft date:07-09-2024
payable to:HRERA Gurugram
payee bank:STATE BANK OF INDIA ADJUSTED FROM RS. 1011300/- AS PER ORDER DATED 17.02.2025 IS TEMID RERA-GRG-1475-2025
ANANT RAJ ESTATE by ANANT RAJ LIMITED | ReraTracker