Have queries on this Project?
27.668889
77.409022
Showing 1 blocks with 3 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
101130.00 m²
1088553.21 ft²
PROPER DEMARCATION OF PLOTS WILL BE DONE,WITH ALL FIXED FOUR POINTS SHOWING ROAD, PLOT AREA AND OTHER SERVICES ALSO
BRICK MASONRY WALL WILL BE CONSTRUCTED WITH ISOLATED FOOTINGS . COLOUMS AND PLINTH BEAM ALONG WITH PLASTER ON BOTH SIDE AND GRILL ON THE TOP
CEMENT CONCRETE ROAD WILL BE CONSTRUCTED ALL ALONG THE DEFINED LOCATIONS IN THE APPROVED DRAWINGS WITH STANDARD SPECIFICATIONS
FOOTPATHS WILL BE CONSTRUCTED ALL ALONG THE ROAD/GREEN AREA AS DESIGNED WITH SPECEFIC PAVERS/STONES ON TOP
WATER SUPPLY WILL BE GIVEN TO ALL INDIVIDUAL UNITS THROUGH UNDERGROUND WATER TANK WITH PROPER FILTERIZATION PLANT
POPER SEWER SYSTEM WILL BE CONSTRUCTED EMBEDDED WITH SEWER TREATMENT PLANT
STORM WATER DRAIN WILL BE CONSTRUCTED AS PER THE APPROVED DRAWINGS AND GRADIENTS
COMPLETE GREENERY WILL BE DEVELOPED AS PER APPROVED LANDSCAPING DRAWINGS
ALL TREES/SHRUBS/HEDGING WILL BE PLANTED AS REQUIRED IN APPROVED DRAWINGS
ELECTRICAL SUPPLY WILL BE GIVEN TO ALL INDIVIDUAL AT SINGLE POINT FROM DEVELOPED SUBSTATION AS PER NORMS. PROPER STREET LIGHT WILL BE DONE AS PER REQUIREMENT AND APPROVED DRAWING
NOT APPLICABLE
COMPLETE STP PLANT WILL BE INSTALLED AS PER APPROVED DRAWING. CAPACITY OF STP WILL BE PROVIDED AS PER STATUTORY REGULATIONS
SOLID WASTE MANGEMENT SYSTEM WILL BE INSTALLED IN A SEPERATE DEDICATED SPACE TO FULLFILL ALL THE REQUIRED CRITERIA
RAIN WATER HARVESTING PIT IS GIVEN IN OPEN AREA FOR TERRACE WATER AND SITE WATER FOR WATER CONSERVATION
AS PER DESIGN AND REQUIREMNENT OF THE PROJECT
WE WILL PROVIDE FIRE FIGHTING FACILITY IN COMMON AREA WHILE INDIVIDUAL OWNER CAN INSTALL THEIR OWN SYSTEM AS PER THEIR AND LOCAL AUTHORITIES REQUIRMENT
CLUB BUILDING AND TEMPLE
NA
AS PER REQUIRMENT ON PERIOD OF TIME