Launch Date
Completion Date
RERA ID
26.484673
81.133489
THE PLOTS WILL BE DEMARCATED BY CONCRETE/BRICK PILLARS TO ALL FOUR SIDES OF THE PLOT BOUNDARY, TO THE EXACT SHAPE, SIZE AND ORIENTATION AS PER SANCTION MAP BY LUCKNOW DEVELOPMENT AUTHORITY.
A 2.4 METER HIGH PRE-FIBRICATED BOUNDARY WALL WILL BE CONSTRUCTED WITHDEEP FOUNDATION ALONG WITH BARBED WIRE BOUNDARY FENCING AT THE TOP.
ALL ROADS WILL BE COMBINATION OF BITUMEN/ RCC ROAD OF DIFFERENT COLOURS, SHAPE, AND THICKNESS ROAD WILL BE APPLICABLE AS PER APPROVED LAYOUT.
ALL FOOTHPATH IN THE PROJECT WILL BE COMBINATION OF GREEN/ PAVER OF DIFFRENT COLOURS, SHAPE AND THICKNESS BLOCKS.
PORTABLE WATER SUPPLY FROM UNDERGROUND WATER TANK, SUPPLY SHALL BE COLLECTED IN UGT . THE SUPPLY OF WATER TO INDIVIDUAL PLOTS .
SEWAGE WILL BE COLLECTED THROUGH A RCC HUME PIPE ARRANGEMNET , LEADING TO SEWERAGE TREATMENT PLANT(STP)
SURFACE DRAIN WATER WILL BE COLLECTED THROUGH RCC PIPE AND WILL BE RELEASED TO STORM WATER LINE FOR DISCHARGE.
THE GREEN AREA WILL BE LANDSCAPE WITH HARD AND SOFT LANDSCAPING AS PER DESIGN. THE PARKSWILL HAVE FOOTHPATH , SITTING AREA AND PLAY AREA FOR CHILDREN.
THE TREES WILLBE PLANTED AT ALL SUITABLE LOCATIONS OF THE PROJECT AND ALONG THE BPUNDARY WALL
ELECTRICAL PAYOUT AND CAPACITY WILL BE INSTALLED TO SUFFICE THE DOMESTIC USE. ALL ELECTRICAL CABLING WILL BE UNDERGROUND AND STREE LIGHTS WILL BE AS PER WORKING DRAWINGS.
NA
SEWAGE SHALL BE TREATED IN SEWAGE TREATMENTS PLANT (STP) AND THEREAFTER TREATED WATER TO BE USED FORFLUSHING AND IRRIGATION
SOLID WASTE TO BE COLLECTED FROM INDIVIDUAL PLOTS AND STORED IN GARBAGE ROOM, RECYCLABLE SHALL BEPROCESSED IN THE COMPOST MACHINE TO MAKE.
RAIN WATER HARVESTING PITS SHALL BE PROVIDED FOR GROUND WATER RECHARGING AND OVER FLOW TO BE DISCHARGEDIN THE MUNICIPLE DRAINS, TREATED SEWAGE.
NA
NA
NA
NA
NA
Showing 1 blocks with 5 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
34883.00 m²
375477.12 ft²