RERA Received Date
Completion Date
RERA ID
26.865518
81.054009
Plots are very well demarcated at the site and land is under possession. Development work is underway with essential infrastructure in progress.
A 2 meter high boundary wall is designed to enhance security and privacy, creating a safe and well-defined perimeter for the site . it serves as a protective barrier, restricting unauthorized access while maintaining a clear property boundary.
A blacktop road is proposed with 9 meter and 12 meter widths, ensuring durability and smooth traffic flow. The construction will include subgrade prepration, base layers, and bituminous surfacing for strength and longevity.
A footpath will be constructed alongside the road for pedestrian saftey and convenience, ensuring smooth and accessible movement.
We will provide Separate borewells between every two plots as drinking water facilities to ensure a reliable drinking water supply for residents.
All Sewage water will be directed to the on site Sewage Treatment Plant(STP) for proper waste management.
All the Drainage Water will be directed to the on site Sewage Treatment Plant (STP) For proper waste Management.
We will develop a green Park areas Compirising 15.01 percent of the total township Area . This will Include Parks and green belts with lush landscaping .
We will Plant evergreen Trees and Plants Ranging from 1 meter to 4 meter in height .
We will design and implement the system as per local electricity Board . We will use LED light fitting in extrenal Areas.
N/A
All the Treatment and Disposal water will be directed to on site Sewage Treatment Plant (STP) for proper waste Disposal .
There is Provision of Garbage Collection center for Solid Waste Managemnt and disposal system
N/A
N/A
N/A
N/A
N/A
N/A
Showing 1 blocks with 2 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
36685.00 m²
394873.67 ft²