Have queries on this Project?
26.523852
81.32848
Total Area
35263.60 m²
379573.86 ft²
We have one plot of size 17872.56 sq. mtr.having 1 main entrance gate from the 12 m wide front road.
1.5 m high and 0.23 m thick Brick work and rcc work in column and beam. At the center face of boundary wall there would be a Logo of the project which give a beautiful iconic design to boundary wall.
From the main entrance gate we have thick interlocking brick /RCC road through out the project whose wideness varies from 7.5 m, 9 m and 12 m.
We would provide footpath of 1.5m width and 100 mm thickness.
We will provide Two nos. of UGT with 150 KL capacity for the requirement of blocks through underground pipelines.
Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.when come into force. Capacity of STP is 230 KLD.
Storm water shall be Provided. Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain line.
We will provide green area with the different activities and the green area will have gaming facilities for kids.
We will provide many type of trees all along the boundary wall & green area
We will design & implement the system as per local electricity Board and will consider centralized Transformer, HT panel, LT Panel, Feeder Pillar and DG back for common service like External lighting, Fountain, STP, Pump room etc. Transformer capacity 2*600KVA and 1*100KVA
NA
Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.,when come into force. Capacity of STP is 230 KLD.
There are a proper garbage collection area provided for the solid waste management.
We will suggest to individual to use low flow fixtures as well dual flush cistern and raw water harvesting system to reduce the water consumption and improve the ground water level.
We will use LED lights fitting in external area as well as solar lights. In Pump room also all the equipment shall have energy efficient motor. And we will suggest to individual also to use.
NA
NA
NA
NA
Ambrosia Estates Phase 1 is located in Lucknow.
Yes. Ambrosia Estates Phase 1 is registered under UPRERAPRJ584925/08/2026 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Ambrosia Estates Phase 1 is 24 May 2029.
Ambrosia Estates Phase 1 is developed by VIRAJ CONSTRUCTIONS PVT. LTD.HIGHTECH PROTECTION INDIA PRIVATE LIMITEDVIDYA ERRECTORS AND ENGINEERING PRIVATE LIMITEDVIRAJ PRAKASHAN PRIVATE LIMITED.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.