NEWActive

ALPHA CORP SKY1 (POCKET B)

GURUGRAM, GURGAON
20-02-2024
Launch Date
NEW
Type
2031-03-09
Completion Date

Overview

Launch Date

20-02-2024

Completion Date

2031-03-09

RERA ID

RERA-GRG-1567-2024

Basic Details

Project NameALPHA CORP SKY1 (POCKET B)
Project IDRERA-GRG-1567-2024
Project TypeNEW
Applicant TypeCompany
Submission Date20-02-2024 02:10:12 PM
Builder NameALPHA CORP DEVELOPMENT PRIVATE LIMITED
CINU45201PB2003PTC045680
PANXXXX259Q
EmailSECRETARIAL@ALPHACORP.IN
WebsiteHttp://alphacorp.in
Phone (Mobile)8130074912
Phone (Landline)01244831111
Registered Address6TH FLOOR, GOLF VIEWCORPORATE TOWER - A, GOLFCOURSE ROAD, SECTOR 42,GURGAON, HARYANA - 122002
Project AddressSECTOR - 15, GURUGRAM, HARYANA
DistrictGURUGRAM
TehsilGURGAON

Bank Details

Bank NameHDFC BANK LIMITED, C-5/32, SDA, NEW DELHI - 110016
Account Number50200092148022
IFSC CodeHDFC0000032
MICR Code110240004
Branch Code0032

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)SANTOSH AGARWAL 6TH FLOOR, GOLF VIEW CORPORATE TOWER - A, GOLF COURSE ROAD,SECTOR - 42, GURGAON, HARYANA - 122002 ASHISH SARIN 6TH FLOOR, GOLF VIEW CORPORATE TOWER - A, GOLF COURSE ROAD,SECTOR - 42, GURGAON, HARYANA - 122002
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)ATTACHED

Development Details

Land Area2.3640 (Acre)
Proposed FAR1.851
Permissible FAR1.87
Total Licensed Land2.3640 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS1630.038
CONSTRUCTION OF ROADS2092.63
PAVEMENTS0
PARKS AND PLAYGROUNDS3493.94
GREEN BELTS0
VEHICLE PARKINGS0
ELECTRICITY SUB-STATION21.45
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY50.18
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER0
WATERSUPPLYSYSTEM59.89
STORMWATERDRAINAGE390.12
STREETLIGHTING471.86
ELECTRICITYSUPPLYSYSTEM500.19
SECURITYANDFIREFIGHTING471.86
STP199.91
UNDERGROUNDWATERTANK161.87
RAINWATERHARVESTING23.07
Total9567.008

Cost Details

Land Cost4004.72 Lakhs
Other Cost7732.23 Lakhs
Estimated Project Cost19188.81 Lakhs
Estimated Infrastructure Cost2639.24 Lakhs
Estimated Apartment Construction Cost4812.62 Lakhs

Documents

ZONING PLAN

Uploaded on: 20-02-2024

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 20-02-2024

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 20-02-2024

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 20-02-2024

JDA-MR. RAVIJEET SINGH GROVER

Uploaded on: 19-06-2024

ROAD LAYOUT

Uploaded on: 19-06-2024

AIRPORT HEIGHT CLEARANCE

Uploaded on: 19-06-2024

AFFIDAVIT 4(2)(L)(D)

Uploaded on: 19-06-2024

BR III APPROVAL LETTER

Uploaded on: 19-06-2024

FIRE FIGHTING_POK 01_FIRE FIGHTING DWG_BASEMENT 01

Uploaded on: 19-06-2024

FIRE FIGHTING_POK 01_FIRE FIGHTING DWG_EWS_ALL FLOOR PLAN

Uploaded on: 19-06-2024

FIRE FIGHTING_POK 01_MECHANICAL VENTILATION_BASEMENT 02

Uploaded on: 19-06-2024

LC IV & BILATERAL AGREEMENT

Uploaded on: 19-06-2024

MUTATION

Uploaded on: 19-06-2024

STRUCTURE PLAN_G.A. PLAN AT FIRST FLOOR LEVEL-LAYOUT1

Uploaded on: 19-06-2024

AKS SHIJRA

Uploaded on: 19-06-2024

STRUCTURE PLAN_G.A. PLAN AT THIRD FLOOR LEVEL-LAYOUT1

Uploaded on: 19-06-2024

BANK UNDERTAKING

Uploaded on: 19-06-2024

BASEMENT-1 PARKING PLAN

Uploaded on: 19-06-2024

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 19-06-2024

BASEMENT-2 PARKING PLAN

Uploaded on: 19-06-2024

CA CERTIFICATE (EXPENDITURE)

Uploaded on: 19-06-2024

CONSTRUCTION WATER N.O.C

Uploaded on: 19-06-2024

DEMARCATION PLAN

Uploaded on: 19-06-2024

DOMESTIC WATER SUPPLY

Uploaded on: 19-06-2024

FIRE FIGHTING_POK 01_FIRE FIGHTING DWG_SCHEMATIC DIAGRAM

Uploaded on: 19-06-2024

FIRE FIGHTING_POK 01_FIRE FIGHTING DWG_SITE PLAN

Uploaded on: 19-06-2024

FIRE FIGHTING_POK 01_MECHANICAL VENTILATION_3 TO 26 FLOOR PLAN

Uploaded on: 19-06-2024

FIRE FIGHTING_POK 01_MECHANICAL VENTILATION_BASEMENT 01

Uploaded on: 19-06-2024

FIRE SCHEME_APPROVAL

Uploaded on: 19-06-2024

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 19-06-2024

EC APPROVAL

Uploaded on: 19-06-2024

ELECTRIC LOAD AVAILABILITY

Uploaded on: 19-06-2024

ELECTRICITY SUPPLY PLAN

Uploaded on: 19-06-2024

ELEVATIONS PLAN

Uploaded on: 19-06-2024

EWS

Uploaded on: 19-06-2024

FLOOR PLAN_1ST AND 2ND FLOOR PLAN

Uploaded on: 19-06-2024

LOI

Uploaded on: 19-06-2024

STRUCTURE PLAN_G.A. PLAN AT TERRACE LEVEL-LAYOUT1

Uploaded on: 19-06-2024

EXTERNAL LIGHTING LAYOUT

Uploaded on: 19-06-2024

FIRE FIGHTING_POK 01_MECHANICAL VENTILATION_1 & 2 FLOOR PLAN

Uploaded on: 19-06-2024

FIRE FIGHTING_POK 01_FIRE FIGHTING DWG_1 & 2 FLR PLAN

Uploaded on: 19-06-2024

FIRE FIGHTING_POK 01_FIRE FIGHTING DWG_3-12,14-17,19-26 FLR PLAN

Uploaded on: 19-06-2024

FIRE FIGHTING_POK 01_FIRE FIGHTING DWG_18 & 27 & TERRACE PLAN

Uploaded on: 19-06-2024

UNIT PLAN-4 PKT-1

Uploaded on: 19-06-2024

STRUCTURE PLAN_G.A. PLAN AT GROUND FLOOR LEVEL-LAYOUT1

Uploaded on: 19-06-2024

FIRE FIGHTING_POK 01_FIRE FIGHTING DWG_BASEMENT 02

Uploaded on: 19-06-2024

JDA-MR. PAWAN SAINI

Uploaded on: 19-06-2024

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 19-06-2024

FIRE FIGHTING_POK 01_FIRE FIGHTING DWG_GROUND FLR PLAN

Uploaded on: 19-06-2024

FIRE FIGHTING_POK 01_MECHANICAL VENTILATION_REFUGE FLR & TERRACE FLOOR PLAN

Uploaded on: 19-06-2024

RENEWAL OF LICENSE NO. 13 OF 2018 TILL 08.02.28

Uploaded on: 19-06-2024

STRUCTURE PLAN_G.A. PLAN AT SECOND FLOOR LEVEL-LAYOUT1

Uploaded on: 19-06-2024

FIRE FIGHTING_POK 01_MECHANICAL VENTILATION_SITE PLAN

Uploaded on: 19-06-2024

FLOOR PLAN_16TH TO 27TH FLOOR PLAN

Uploaded on: 19-06-2024

FOREST NOC

Uploaded on: 19-06-2024

JAMABANDI

Uploaded on: 19-06-2024

LANDSCAPE LAYOUT PLAN

Uploaded on: 19-06-2024

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 19-06-2024

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 19-06-2024

NON-ENCUMBRANCE CERTIFICATE

Uploaded on: 19-06-2024

STORM WATER DRAINAGE LAYOUT

Uploaded on: 19-06-2024

STRUCTURE PLAN_FOUNDATION PLAN & DETAIL-LAYOUT1

Uploaded on: 19-06-2024

REVALIDATED BR-III APPROVAL LETTER

Uploaded on: 19-06-2024

SECTION PLAN

Uploaded on: 19-06-2024

SERVICE PLAN & ESTIMATE REPORT

Uploaded on: 19-06-2024

SERVICE PLAN ESTIMATE APPROVAL LETTER

Uploaded on: 19-06-2024

SEWERAGE LAYOUT

Uploaded on: 19-06-2024

SOLID WASTE MANAGEMENT

Uploaded on: 19-06-2024

UNIT PLAN-1 PKT-1

Uploaded on: 19-06-2024

UNIT PLAN-2 PKT-1

Uploaded on: 19-06-2024

UNIT PLAN-3 PKT-1

Uploaded on: 19-06-2024

STRUCTURE PLAN_COLUMN LAYOUT PLAN-LAYOUT1

Uploaded on: 19-06-2024

STRUCTURE PLAN_G.A. PLAN AT 4TH TO 14TH FLOOR LEVEL-LAYOUT1

Uploaded on: 19-06-2024

STRUCTURE PLAN_G.A. PLAN AT 15TH TO 26TH FLOOR LEVEL-LAYOUT1

Uploaded on: 19-06-2024

Statutory Approvals

AIRPORT HEIGHT CLEARANCEDate: 27-04-2018Status: ALREADY BEEN OBTAINED
FIRE SCHEME APPROVALDate: 08-02-2019Status: ALREADY BEEN OBTAINED
SERVICE PLAN ESTIMATES APPROVALDate: 31-12-2021Status: ALREADY BEEN OBTAINED
FOREST NOCDate: 01-09-2017Status: ALREADY BEEN OBTAINED
NATURAL CONSERVATION ZONE NOCDate: 30-04-2019Status: ALREADY BEEN OBTAINED
TREE CUTTING PERMISSION/ NOCDate: 28-09-2018Status: APPLIED FOR BUT YET TO RECEIVE
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSAS PER PROJECT REPORT
WATER SUPPLY SYSTEMAS PER PROJECT REPORT
STORM WATER DRAINAGEAS PER PROJECT REPORT
ELECTRICITY SUPPLY SYSTEMAS PER PROJECT REPORT
SEWAGE TREATMENT & GARBAGE DISPOSALAS PER PROJECT REPORT
STREET LIGHTINGAS PER PROJECT REPORT
SECURITY AND FIRE FIGHTINGAS PER PROJECT REPORT
PLAYGROUNDS AND PARKSAS PER PROJECT REPORT
CLUB HOUSE/COMMUNITY CENTREAS PER PROJECT REPORT
SHOPPING AREAAS PER PROJECT REPORT
RENEWABLE ENERGY SYSTEMAS PER PROJECT REPORT
SCHOOLAS PER PROJECT REPORT
HOSPITAL/DISPENSARYAS PER PROJECT REPORT
ANY OTHERAS PER PROJECT REPORT
SEWERAGE SYSTEMAS PER PROJECT REPORT
PARKINGAS PER PROJECT REPORT
UNDERGROUND WATER TANKAS PER PROJECT REPORT
RAIN WATER HARVESTINGAS PER PROJECT REPORT
ELECTRICAL SUB STATIONAS PER PROJECT REPORT
CONSTRUCTION OF CIRCULAR ROADAS PER PROJECT REPORT
ELECTRIFICATION COST UPTO PROJECT SITEAS PER PROJECT REPORT

NOC

ROADSProvider: HSVPApproval Status: Approved
WATER SUPPLYProvider: HSVPApproval Status: Approved
ELECTRICITYProvider: DHBVNLApproval Status: Approved
SEWAGE DISPOSALProvider: HSVPApproval Status: Approved
STORM WATER DRAINAGEProvider: HSVPApproval Status: Approved

Project Team

Authorized Representative

SANTOSH SINGH MEHRA
Name
SANTOSH SINGH MEHRA
PAN
XXXX798E
Email
secretarial@alphacorp.in
Mobile
8130074912
Landline
01244831111
Address
308 NEW BHAGAT SINGH BUILDING OPP METRO PILLAR NO 60 SIKANDERPUR GURGAON HARYANA

Managing Director/CEO

ASHISH SARIN
Name
ASHISH SARIN
PAN
XXXX250A
Email
secretarial@alphacorp.in
Mobile
8130074912
Landline
01244831111
Address
GP-28B Gurgaon One ApartmentsOpposite Maruti Factory Sector 22 Gurgaon 122015

Directors

NEERAJ GOYAL
Name
NEERAJ GOYAL
PAN
XXXX034D
Email
secretarial@alphacorp.in
Mobile
8130074912
Landline
01244831111
Address
House No. 276 Near Mother Dairy Sector 30 Amarnagar Faridabad- 121003

Contact Details

Project ContactEmail: secretarial@alphacorp.inMobile: 8130074912Landline: 01244831111
Project Contact PersonName: SANTOSH SINGH MEHRAEmail: secretarial@alphacorp.inMobile: 8130074912Landline: 01244831111

Land Details

Land Area2.3640 (Acre)
Proposed FAR1.851
Permissible FAR1.87
Total Licensed Land2.3640 (Acre)

Land Usage

Land Cost4004.72 Lakhs
Other Cost7732.23 Lakhs
Estimated Project Cost19188.81 Lakhs
Estimated Infrastructure Cost2639.24 Lakhs
Estimated Apartment Construction Cost4812.62 Lakhs

Total Infrastructure Expenditure

Infrastructure Total Expenditure

No total expenditure data is currently available for this project.

Quarterly Infrastructure Expenditure

2027 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres40.2349.7455.8757.58
Construction of Circulation Road----
Electrical Sub Station----
Electricity Supply System01.462.925.09
Electrification cost upto Project site----
Electrification cost upto project site----
Other0000
Parking93.393.385.3371.37
Parks and Playgrounds0000
Rain Water Harvesting----
Renewable Energy System----
Roads & Pavements0000
STP----
Security and Fire Fighting----
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Street Lighting----
Underground Water Tank----
Water Supply System0000
2028 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres55.2450.0939.1632.7
Construction of Circulation Road----
Electrical Sub Station----
Electricity Supply System7.7310.211.7311.73
Electrification cost upto Project site----
Electrification cost upto project site----
Other0000
Parking54.5938.1924.4314.3
Parks and Playgrounds00047.61
Rain Water Harvesting-0.330.430.5
Renewable Energy System-2.944.465.89
Roads & Pavements0007.65
STP-7.139.4110.81
Security and Fire Fighting-23.6835.9347.44
Sewerage treatment & garbage disposal00.530.811.07
Shopping area0.311.522.072.2
Storm Water Drainage00.530.811.07
Street Lighting----
Underground Water Tank-4.285.656.49
Water Supply System00.721.091.44
2029 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres27.722.0511.590
Construction of Circulation Road---5
Electrical Sub Station-35.140.3340.33
Electricity Supply System10.27.735.092.92
Electrification cost upto Project site----
Electrification cost upto project site018.8621.6721.67
Other0000
Parking7.650--
Parks and Playgrounds62.8772.2472.2462.87
Rain Water Harvesting0.50.430.33-
Renewable Energy System6.776.775.894.46
Roads & Pavements10.1111.6111.6110.11
STP10.819.417.13-
Security and Fire Fighting54.5154.5147.4435.93
Sewerage treatment & garbage disposal1.231.231.070.81
Shopping area1.580.7900
Storm Water Drainage1.231.231.070.81
Street Lighting1.194.14.494.29
Underground Water Tank6.495.654.28-
Water Supply System1.661.661.441.09
2030 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0---
Construction of Circulation Road5---
Electrical Sub Station35.1---
Electricity Supply System1.46---
Electrification cost upto Project site18.86---
Electrification cost upto project site----
Other0---
Parking----
Parks and Playgrounds47.61---
Rain Water Harvesting----
Renewable Energy System2.94---
Roads & Pavements7.65---
STP----
Security and Fire Fighting23.68---
Sewerage treatment & garbage disposal0.53---
Shopping area0---
Storm Water Drainage0.53---
Street Lighting2.48---
Underground Water Tank----
Water Supply System0.72---

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILE/ MARBLE/ GRANITE /LAMINATED WOODEN FLOORING
WALL FINISHING DETAILSLOW VOC PAINT OF APPROVED MAKE OR ASSPECIFIED BY ARCHITECT / CONSULTANT
KITCHEN DETAILSVITRIFIED TILE/ LOW VOC PAINT OFAPPROVED MAKE OR AS SPECIFIED BYARCHITECT / CONSULTANT
BATHROOM FITTINGSAPPROVED MAKE OR AS SPECIFIED BYARCHITECT / CONSULTANT
WOOD WORK ETCNOT APPLICABLE
DOORS AND WINDOS FRAMESHARD WOOD/ ALUMINIUM/ UPVC
GLASS WORKPLAIN FLOAT GLASS/TOUGHENED
ELECTRIC FITTINGSAPPROVED MAKE OR AS SPECIFIED BYARCHITECT / CONSULTANT
CONDUCTING AND WIRING DETAILSAPPROVED MAKE OR AS SPECIFIED BYARCHITECT / CONSULTANT
CUPBOARD DETAILSNOT APPLICABLE
WATER STORAGECOMMON UNDERGROUND AND OVERHEADWATER TANK
LIFT DETAILSAPPROVED MAKE OR AS SPECIFIED BYARCHITECT / CONSULTANT
EXTERNAL GLAZINGSALUMINUM / UPVC
WINDOWS/GLAZINGSPLAIN FLOAT GLASS/TOUGHENED
DOORSFLUSH DOOR WITH HARD WOOD FRAMES /ALUMINIUM/ UPVC
MAIN DOORSFLUSH DOOR WITH HARD WOOD FRAMES
INTERNAL DOORSFLUSH DOOR WITH HARD WOOD FRAMES
AIR CONDITIONINGNOT APPLICABLE
ELECTRICAL FITTINGSAPPROVED MAKE OR AS SPECIFIED BYARCHITECT / CONSULTANT
CNG PIPE LINENOT APPLICABLE
PROVISION OF WIFI AND BROADBAND FACILITYNOT APPLICABLE
EXTERNAL FINISHING/COLOUR SCHEMEAS SPECIFIED BY ARCHITECT / CONSULTANT
INTERNAL FINISHINGAPPROVED MAKE OR AS SPECIFIED BYARCHITECT / CONSULTANT

Unit-wise Specifications

TOILET
FLOORVITRIFIED TILE
WALLSVITRIFIED TILE/ LOW VOC PAINT OF APPROVEDMAKE AS SPECIFIED BY ARCHITECT /CONSULTANT
CEILINGLOW VOC PAINT OF APPROVED
COUNTERSMARBLE/ GRANITE
SANITARY WARE/CP FITTINGSAS PER APPROVED MAKE RECOMMENDED BYARCHITECT/CONSULTANT
FIXTURESAS PER APPROVED MAKE RECOMMENDED BYARCHITECT/CONSULTANT
KITCHEN
FLOORVITRIFIED TILE
WALLSVITRIFIED TILE TILL 2 FEET ABOVE COUNTER/LOW VOC PAINT
CEILINGLOW VOC PAINT OF APPROVED MAKE ASSPECIFIED BY ARCHITECT / CONSULTANT
COUNTERSMARBLE/ GRANITE
FIXTURESAS PER APPROVED MAKE RECOMMENDED BYARCHITECT/CONSULTANT
KITCHEN APPLIANCESNOT APPLICABLE
SIT-OUTS
FLOORCERAMIC TILES
WALLS & CEILINGEXTERNAL GRADE TEXTURE PAINT OF APPROVEDMAKE AS SPECIFIED BY ARCHITECT /CONSULTANT
RAILINGSMS / GLASS
FIXTURESNOT APPLICABLE
BED ROOMS
FLOORVITRIFIED TILE/ LAMINATED WOODEN FLOORING
WALLSLOW VOC PAINT OF APPROVED MAKE ASSPECIFIED BY ARCHITECT / CONSULTANT
CEILINGLOW VOC PAINT OF APPROVED MAKE ASSPECIFIED BY ARCHITECT / CONSULTANT
WARDROBESNOT APPLICABLE
MASTER TOILET
FLOORVITRIFIED TILE
WALLSVITRIFIED TILE/ LOW VOC PAINT OF APPROVEDMAKE AS SPECIFIED BY ARCHITECT /CONSULTANT
CEILINGLOW VOC PAINT OF APPROVED MAKE ASSPECIFIED BY ARCHITECT / CONSULTANT
COUNTERSMARBLE/ GRANITE
SANITARY WARE/CP FITTINGSAS PER APPROVED MAKE RECOMMENDED BYARCHITECT/CONSULTANT
FITTING/FIXTURESAS PER APPROVED MAKE RECOMMENDED BYARCHITECT/CONSULTANT
MASTER BEDROOM/DRESSROOM
FLOORVITRIFIED TILE/ LAMINATED WOODEN FLOORING
WALLSLOW VOC PAINT OF APPROVED MAKE ASSPECIFIED BY ARCHITECT / CONSULTANT
CEILINGLOW VOC PAINT OF APPROVED MAKE ASSPECIFIED BY ARCHITECT / CONSULTANT
MODULAR WARDROBESNOT APPLICABLE
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORVITRIFIED TILE/ MARBLE/ GRANITE
WALLSLOW VOC PAINT OF APPROVED MAKE ASSPECIFIED BY ARCHITECT / CONSULTANT
CEILINGLOW VOC PAINT OF APPROVED MAKE ASSPECIFIED BY ARCHITECT / CONSULTANT
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORVITRIFIED / CERAMIC TILES
WALLS & CEILINGLOW VOC PAINT/ OBD/ AS PER APPROVED MAKERECOMMENDED BY ARCHITECT/ CONSULTANT
TOILETVITRIFIED / CERAMIC TILES / LOW VOC PAINT
BALCONYCERAMIC TILES

Fee Details

Payment 1
amount:332200
cheque no:10625
draft date:01-02-2024
payable to:HRERA Gurugram
payee bank:YES BANK LIMITED(YESBR12024020100010625)
Payment 2
amount:183000
cheque no:40800134432
draft date:20-03-2024
payable to:HRERA Gurugram
payee bank:YES BANK LIMITED(YESIG40800134432)