Launch Date
Completion Date
RERA ID
28.823347
78.681561
NA
The boundary wall is 3m high that is built is 230mm thick brick wall in first class brick work in a ratio of 1;6 mix, with providing column at every 4mt, expansion joint and beam for high durability damp proof course layer will also laid for moisture resistant purpose .
Internal road are 6 Mt. wide. All roads are RCC with proper compaction, 8 inch boulder will be use, ready mixed concrete will be use which is manufactured in fully automatic batching plant and designed up to 100 Mt. load capacity.
NA
Water supply will be provided by developer through over head water tank in each. All water supply pipes elbows, tee , socket etc. will be Uniq make ISI marked.
STP(sewerage treatment plant) is proposed by developer (95 KLD) of MBBR technology with clog pump, irrigation pump etc.
Providing and laying cast in site RCC Drain. Strom water lines will be provided by the developer along with roads. All drain pipes And rain water pipes to be make 6kg pressure pipes ISI marked and all PVC fitting to be of ISI marked. Gully traps and main hole as per detail drawing.
NA
Tree plantation will be done along the boundaries. It is one of the effective remedial measures to control the air pollution and noise pollution. It also causes aesthetics improvement of the area as well as sustains and supports the biosphere.
Street lightning lines will be laid along the road. The distance between street lightning will be 15 to 20 Mt. electrical sub station are proposed by developer. Wires , switch socket crabtree or anchor roma make , MCB ISI make, conduit ISI marked, D.B Box ISI marked, gang box, fan box, light box, etc. as per ISI norms.
NA
STP system has been proposed by the developer for treatment and disposal of sewage and sullage water. sewer lines are around 150-300mm.
Solid waste management and disposal system will be provided by developer. All drain pipes and rain water pipes to be make 6kg pressure pipe ISI marked and all PVC fitting to be of ISI marked. Gully traps and main hole as per detail drawing.
Rain water harvesting tank will be constructed by the developer for conservation of water.
NA
Fire fighting instruments will be placed by the developer in each block according to fire NOC. like alarms, hooters, hose reels , hydrant pump, sprinklers pump etc.
NA
Fire Staircases will be provided in block for emergency exit.
NA
Showing 4 blocks with 46 units
Total Carpet Area
2837.43 m²
30541.81 ft²
Total Units
169
2 different types
Blocks & Floors
4
4 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
3201.27 m²
34458.15 ft²