NewActive

AKASH SHOPPING COMPLEX

Moradabad, Uttar Pradesh
20-05-2022
Launch Date
New
Type
08-05-2027
Completion Date

Overview

Launch Date

Invalid Date

Completion Date

08-05-2027

RERA ID

UPRERAPRJ538912/07/2024

Basic Details

Project TypeNew
Project CategoryCommercial
Total area in round figure (Sq.mt.)3026
Project NameAKASH SHOPPING COMPLEX
Registration Fee (in Rs.)41000
AddressPLOT NO-5CP-001C,SEC-5 NAYA MORADABAD YOJNA , MORADABAD
Village/Locality/Sector etc.MORADABAD
StateUttar Pradesh
Project Duration (In month)60
DistrictMoradabad
Original Start Date-
TehsilMoradabad
Proposed Start Date20-05-2022
Sanctioning Competent AuthorityMoradabad Development Authority
Project Cost (in Lacs)1504
Proposed Completion Date08-05-2027

Location

Latitude

28.823347

Longitude

78.681561

Bank Details

Account Details
Name of the AccountNarender Singh Chadha Collection Account For Akash Shopping Complex
Account Number84322149366161
Bank NamePrathama U.P. Gramin Bank
Branch NameRam Ganga Vihar Phase ll
Branch AddressNear Sale Tax Office Ram Ganga Vihar Phase 2 Moradabad 244001
IFSC CodePUNB0SUPGB5
Branch DistrictMoradabad
Branch StateSelect
Branch Email Address[email protected]
Separate Account Details
Name of the AccountNarender Singh Chadha Separate Bank Account For Akash Shopping Complex
Account Number84322149366188
Bank NamePrathama U.P. Gramin Bank
Branch NameRam Ganga Vihar Phase ll
Branch AddressNear Sale Tax Office Ram Ganga Vihar Phase ll Moradabad 244001
Branch StateUttar Pradesh
Branch DistrictMoradabad
IFSC CodePUNB0SUPGB5
Transaction Account Details
Name of the AccountNarender Singh Chadha Rera Transaction Account For Akash Shopping Complex
Account Number84322149366153
Bank NamePrathama U.P. Gramin Bank
Branch NameRam Ganga Vihar Phase ll
Branch AddressNear Sale Tax Office Ram Ganga Vihar Phase ll Moradabad 244001
Branch StateUttar Pradesh
Branch DistrictMoradabad
IFSC CodePUNB0SUPGB5

Development Works

Demarcation of Plots

NA

Boundary Wall

The boundary wall is 3m high that is built is 230mm thick brick wall in first class brick work in a ratio of 1;6 mix, with providing column at every 4mt, expansion joint and beam for high durability damp proof course layer will also laid for moisture resistant purpose .

Road Work

Internal road are 6 Mt. wide. All roads are RCC with proper compaction, 8 inch boulder will be use, ready mixed concrete will be use which is manufactured in fully automatic batching plant and designed up to 100 Mt. load capacity.

Footpaths

NA

Water Supply Including Drinking Water Facilities

Water supply will be provided by developer through over head water tank in each. All water supply pipes elbows, tee , socket etc. will be Uniq make ISI marked.

Sewer System

STP(sewerage treatment plant) is proposed by developer (95 KLD) of MBBR technology with clog pump, irrigation pump etc.

Drain

Providing and laying cast in site RCC Drain. Strom water lines will be provided by the developer along with roads. All drain pipes And rain water pipes to be make 6kg pressure pipes ISI marked and all PVC fitting to be of ISI marked. Gully traps and main hole as per detail drawing.

Parks

NA

Tree Planting

Tree plantation will be done along the boundaries. It is one of the effective remedial measures to control the air pollution and noise pollution. It also causes aesthetics improvement of the area as well as sustains and supports the biosphere.

Design For Electric Supply Including Street Lighting

Street lightning lines will be laid along the road. The distance between street lightning will be 15 to 20 Mt. electrical sub station are proposed by developer. Wires , switch socket crabtree or anchor roma make , MCB ISI make, conduit ISI marked, D.B Box ISI marked, gang box, fan box, light box, etc. as per ISI norms.

Community Buildings

NA

Treatment and Disposal System of Sewage and Sullage water

STP system has been proposed by the developer for treatment and disposal of sewage and sullage water. sewer lines are around 150-300mm.

Solid Waste Management And Disposal System

Solid waste management and disposal system will be provided by developer. All drain pipes and rain water pipes to be make 6kg pressure pipe ISI marked and all PVC fitting to be of ISI marked. Gully traps and main hole as per detail drawing.

Water Conservation System

Rain water harvesting tank will be constructed by the developer for conservation of water.

Energy Management System Including Use of Renewable Energy

NA

Fire Protection And Fire Safety System

Fire fighting instruments will be placed by the developer in each block according to fire NOC. like alarms, hooters, hose reels , hydrant pump, sprinklers pump etc.

Social Infrastructure And Other Public Amenities Including Public Health Services

NA

Emergency Evacuation Services

Fire Staircases will be provided in block for emergency exit.

Other Miscellaneous Work

NA

Documents

Registry Document

No: 3663 | Date: 15-07-2020

Proforma of Conveyance Deed

Proforma of Completion Certificate(Occupancy)

Other

Details of Encumbrances

Uploaded: 23-03-2024

Commencement Certificate

Uploaded: 23-03-2024

Proforma of Application Form

Uploaded: 03-04-2024

Proforma of Allotment Letter

Uploaded: 03-04-2024

Proforma of Conveyance Deed

Uploaded: 03-04-2024

Waste Disposal Plan

Uploaded: 03-04-2024

Water Supply Plan

Uploaded: 30-04-2024

Electricity Supply Plan

Uploaded: 23-03-2024

Development Work Plan

Uploaded: 03-04-2024

Affidavit

Uploaded: 03-04-2024

CA CERTIFICATE

Uploaded: 04-04-2024

ARCHITECT CERTIFICATE

Uploaded: 04-04-2024

ENGINEERS CERTIFICATE

Uploaded: 04-04-2024

Proforma of Agreement for Sale

Uploaded: 03-04-2024

Permits

Orignal Permit NoSHOPPING CENTER/01195/MBDA/BP/21-22/0548/13042022
Orignal Permit Date10-05-2022
Valid Upto09-05-2027
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto09-05-2028
End Date08-05-2027
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailOpen

Project Team

Contractor Name (if any)NARENDER SINGH CHADHA
Contractor AddressS-559, GREATER KAILASH PART 2, SOUTH DELHI, DELHI-110048
Architect NameRAJAT ANAND
Architect Address21 Shivpuri, Rampur Road, Moradabad -244001
Architect Licence NumberCA/2014/66472
Structural Engineer NameMADAN MOHAN SAHA
Structural Engineer Address389, Ground floor, IP Colony, Sector-30/33, Faridabad-121003 Haryana
Mobile number(Project Co-ordinator)8077544332

Land Details

AFS

Showing 4 blocks with 46 units

Property Summary

Total Carpet Area

2837.43

30541.81 ft²

Total Units

169

2 different types

Blocks & Floors

4

4 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:16.79
Balconies:0
Parking ratio:0.00 per unit

Block TOWER - A

10 units

Block TOWER - B

15 units

Block TOWER - C

9 units

Block TOWER - D

12 units

Khasra Details

Total Area

3201.27

34458.15 ft²

1 plot
Plot
TypePlot
Khasra/Plot No5-CP/001C
Area(In Sq. Mt.)3201.27

Other Details

Contractor Name (if any)NARENDER SINGH CHADHA
Contractor AddressS-559, GREATER KAILASH PART 2, SOUTH DELHI, DELHI-110048
Architect NameRAJAT ANAND
Architect Address21 Shivpuri, Rampur Road, Moradabad -244001
Architect Licence NumberCA/2014/66472
Structural Engineer NameMADAN MOHAN SAHA
Structural Engineer Address389, Ground floor, IP Colony, Sector-30/33, Faridabad-121003 Haryana
Mobile number(Project Co-ordinator)8077544332
AKASH SHOPPING COMPLEX by NARENDER SINGH CHADHA | ReraTracker