Launch Date
Completion Date
RERA ID
28.525232
78.445665
NA
The boundary wall is in 3 Mt. high that is built in 230 mm thick brick wall with column in every 4 Mt. beam, expansion joint.
Internal Roads are 18 Mt. and 6Mt. wide. All roads are RCC With proper compaction, 8 inch boulder will be used with tremix.
NA
Water supply will be provided by the developer through over head water tank in each tower.
STP (sewerage treatment plant) is proposed by developer of 95 KLD of MBBR technology with clog pump, irrigation pump etc.
Providing and laying cast in site RCC drain, Storm water lines will be provided by the developer along with roads.
Area of park has been reserved.
Plantation will be done by the developer as per layout.
Street lightning lines will be laid along the road. The distance between street lightning will be 15 to 20 Mts. Electrical sub station will also proposed by developer.
NA
STP (sewerage treatment plant) system has been proposed by the developer for treatment and disposal of sewage and sullage water. Sewer lines are around 150-300mm.
Solid waste management and disposal system will be provided by the developer.
Rain water harvesting tank will be constructed by the developer for water conservation.
NA
Fire fighting equipments will be placed by the developer in each tower according to fire NOC.
NA
Fire staircase will be provided in each tower for emergency exit.
NA
Showing 4 blocks with 24 units
Total Carpet Area
7918.56 m²
85234.59 ft²
Total Units
216
1 different types
Blocks & Floors
4
6 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
9500.00 m²
102257.05 ft²