NEWActive

AIPL JOY GALLERY

GURUGRAM, BADSHAHPUR ST
14-05-2020
Launch Date
NEW
Type
2025-05-13
Completion Date

Overview

Launch Date

14-05-2020

Completion Date

2025-05-13

RERA ID

RERA-GRG-650-2020

Basic Details

Project NameAIPL JOY GALLERY
Project IDRERA-GRG-650-2020
Project TypeNEW
Applicant TypeCompany
Submission Date14-05-2020 05:42:21 PM
Builder NameADVANCE INDIA PROJECTS LIMITED
CINU45209HR1997PLC080240
PANXXXX859J
Emailrera-haryana@aipl.com
Websitehttps://aipl.com/aipl-joy-gallery-gurugram
Phone (Mobile)8800563717
Phone (Landline)9211160000
Registered AddressTHE MASTERPIECE, GOLF COURSE ROAD, SECTOR - 54, GURUGRAM - 122002, HARYANA, INDIA
Project AddressSECTOR 66
DistrictGURUGRAM
TehsilBADSHAHPUR ST

Bank Details

Bank NameKOTAK MAHINDRA BANK LIMITED, GROUND FLOOR, BLOCK - B, VATIKA ATRIUM, SECTOR 53, GOLF COURSE ROAD, GURGAON 122001, HARYANA
Account Number5213088449
IFSC CodeKKBK0000289
MICR Code110485043
Branch Code0000289

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Mr. Daljeet Singh, Mr. Harinder Singh and Mr. Gurdeep Singh
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Yes

Development Details

Land Area4.418 (Acre)
Proposed FAR350
Permissible FAR350
Total Licensed Land4.418 (Acre)

Land Usage

PLOTS TO BE SOLD8491.797
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0
CONSTRUCTION OF ROADS0
PAVEMENTS5260.936
PARKS AND PLAYGROUNDS831.148
GREEN BELTS0
VEHICLE PARKINGS50
ELECTRICITY SUB-STATION38.01
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER3207.119
Total17879.01

Cost Details

Land Cost7547.30 Lakhs
Other Cost21540.13 Lakhs
Estimated Project Cost66125.47 Lakhs
Estimated Infrastructure Cost5356.13 Lakhs
Estimated Apartment Construction Cost31681.91 Lakhs

Documents

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 14-04-2020

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 17-08-2020

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 14-04-2020

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 14-04-2020

ANNEXURE B138, B139, B140, B141 - DETAILS OF MEP

Uploaded on: 17-08-2020

DRWG 31A 19TH, 24TH, 26TH FLOOR PLAN

Uploaded on: 17-08-2020

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 17-08-2020

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 14-05-2020

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 14-04-2020

JAMABANDI

Uploaded on: 17-08-2020

AIPL ADDRESS PROOF (INC 22)

Uploaded on: 17-08-2020

DRWG 17C 2ND FLOOR PLAN (CARPET AREA)

Uploaded on: 17-08-2020

BUILDING PLAN APPROVAL LETTER (BR-III)

Uploaded on: 17-08-2020

REP-II

Uploaded on: 17-08-2020

DRWG 18C 3RD FLOOR PLAN

Uploaded on: 17-08-2020

ANNUAL REPORT OF 31ST MARCH 2018

Uploaded on: 17-08-2020

GST CERTIFICATE

Uploaded on: 17-08-2020

WEST ELEVATION

Uploaded on: 17-08-2020

DRWG 15C. GROUND FLOOR PLAN (CARPET AREA)

Uploaded on: 17-08-2020

ANNEXURE B142, B143, B144, B145 - DETAILS OF PROOF CONSULTANT

Uploaded on: 17-08-2020

ZONING PLAN

Uploaded on: 17-08-2020

SECTION D

Uploaded on: 17-08-2020

AFFIDAVIT OF PROMOTER REGARDING ARRANGEMENT WITH THE BANK OF MASTER ACCOUNT

Uploaded on: 17-08-2020

SOUTH ELEVATION

Uploaded on: 17-08-2020

SECTION -A

Uploaded on: 17-08-2020

FOREST NOC

Uploaded on: 17-08-2020

LOI

Uploaded on: 17-08-2020

PROJECT REPORT ALONG WITH BROCHURE

Uploaded on: 17-08-2020

LAND TITLE SEARCH REPORT

Uploaded on: 17-08-2020

AKSHIJRA

Uploaded on: 17-08-2020

SECTION C

Uploaded on: 17-08-2020

NORTH ELEVATION

Uploaded on: 17-08-2020

AIPL TAN

Uploaded on: 17-08-2020

ENVIRONMENT CLEARANCE

Uploaded on: 17-08-2020

AGREEMENT TO SALE

Uploaded on: 17-08-2020

DIRECTORS REPORT TILL 31ST MARCH 2018

Uploaded on: 17-08-2020

AIPL PAN CARD

Uploaded on: 17-08-2020

ALLOTMENT LETTER

Uploaded on: 17-08-2020

DEVELOPMENT AGREEMENT

Uploaded on: 17-08-2020

AIRPORT HEIGHT CLEARANCE

Uploaded on: 17-08-2020

ANNEXURE B130, B131, B132, B133 - DETAILS OF ARCHITECT

Uploaded on: 17-08-2020

ANNEXURE B146, 147, B148 - DETAILS OF CHARTERED ACCOUNTANT

Uploaded on: 17-08-2020

DRWG 16C 1ST FLOOR PLAN (CARPET AREA)

Uploaded on: 17-08-2020

MUTATION

Uploaded on: 17-08-2020

ANNEXURE B150, B151, B152, B153 - REGISTERED AGENTS LIST

Uploaded on: 17-08-2020

SALE DEED

Uploaded on: 17-08-2020

LICENSE WITH RENEWAL COPIES

Uploaded on: 17-08-2020

DEMARCATION PLAN

Uploaded on: 17-08-2020

DETAILS OF AUTHORIZED SIGNATORY

Uploaded on: 17-08-2020

APPROVED ZONING PLAN DRAWING

Uploaded on: 17-08-2020

BIP

Uploaded on: 17-08-2020

TREE CUTTING PERMISSION

Uploaded on: 17-08-2020

ANNEXURE B134, B135, B136, B137 - DETAILS OF STRUCTURAL ENGINEER

Uploaded on: 17-08-2020

SECTION B

Uploaded on: 17-08-2020

DEMAND DRAFT FOR REGISTRATION & PROCESSING FEE (ACKNOWLEDGMENT COPY)

Uploaded on: 17-08-2020

DETAILS OF PROJECT PROPONENT

Uploaded on: 17-08-2020

SITE PLAN

Uploaded on: 17-08-2020

ANNUAL REPORT OF 31ST MARCH 2017

Uploaded on: 17-08-2020

ANNUAL REPORT OF 31ST MARCH 2019

Uploaded on: 17-08-2020

FINAL SUPER IMPOSED DEMARCATION PLAN ON SITE PLAN

Uploaded on: 17-08-2020

EAST ELEVATION

Uploaded on: 17-08-2020

DRWG 24A 10TH FLOOR PLAN

Uploaded on: 18-08-2020

DRWG 25A 11TH FLOOR PLAN

Uploaded on: 18-08-2020

DRWG 19A. 4TH FLOOR PLAN

Uploaded on: 18-08-2020

DRWG 21A. 6TH, 14TH FLOOR PLAN

Uploaded on: 18-08-2020

DRWG 22A 8TH FLOOR PLAN

Uploaded on: 18-08-2020

DRWG 26A 12TH FLOOR PLAN

Uploaded on: 18-08-2020

DRWG 27A 15TH FLOOR PLAN

Uploaded on: 18-08-2020

DRWG 28A 16TH FLOOR PLAN

Uploaded on: 18-08-2020

DRWG 29A 17TH FLOOR PLAN

Uploaded on: 18-08-2020

DRWG 30A 18TH FLOOR PLAN

Uploaded on: 18-08-2020

DRWG 32A 20TH, 21ST FLOOR PLAN

Uploaded on: 18-08-2020

DRWG 33A 22ND FLOOR PLAN

Uploaded on: 18-08-2020

DRWG 34A 25TH FLOOR PLAN

Uploaded on: 18-08-2020

DRWG 35 TERRACE, MACHINE ROOM AND ROOF PLAN

Uploaded on: 18-08-2020

DRWG 10A BASEMENT -01 PLAN

Uploaded on: 18-08-2020

DRWG 14A BASEMENT -05 PLAN

Uploaded on: 18-08-2020

DRWG11A BASEMENT -02 PLAN

Uploaded on: 18-08-2020

DRWG12A BASEMENT -03 PLAN

Uploaded on: 18-08-2020

DRWG13A BASEMENT -04 PLAN

Uploaded on: 18-08-2020

Statutory Approvals

AIRPORT HEIGHT CLEARANCEDate: 18-11-2019Status: ALREADY BEEN OBTAINED
FOREST NOCDate: 22-03-2019Status: ALREADY BEEN OBTAINED
BUILDING PLAN - BR(III)Date: 14-05-2020Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: No
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSAS PER PROJECT REPORT
WATER SUPPLY SYSTEMAS PER PROJECT REPORT
STORM WATER DRAINAGEAS PER PROJECT REPORT
ELECTRICITY SUPPLY SYSTEMAS PER PROJECT REPORT
SEWAGE TREATMENT & GARBAGE DISPOSALAS PER PROJECT REPORT
STREET LIGHTINGAS PER PROJECT REPORT
SECURITY AND FIRE FIGHTINGAS PER PROJECT REPORT
PLAYGROUNDS AND PARKSAS PER PROJECT REPORT
CLUB HOUSE/COMMUNITY CENTREAS PER PROJECT REPORT
SHOPPING AREAAS PER PROJECT REPORT
RENEWABLE ENERGY SYSTEMAS PER PROJECT REPORT
SCHOOLAS PER PROJECT REPORT
HOSPITAL/DISPENSARYAS PER PROJECT REPORT
ANY OTHERYET TO BE PREPARED
STPAS PER PROJECT REPORT
UNDERGROUND WATER TANKAS PER PROJECT REPORT
RAIN WATER HARVESTINGAS PER PROJECT REPORT
ELECTRICAL SUB STATIONAS PER PROJECT REPORT

NOC

ROADSProvider: GMDAApproval Status: Pending
WATER SUPPLYProvider: GMDAApproval Status: Pending
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: GMDAApproval Status: Pending
STORM WATER DRAINAGEProvider: GMDAApproval Status: Pending

Project Team

Authorized Representative

ARVIND TIWARI
Name
ARVIND TIWARI
PAN
XXXX832D
Email
rera-haryana@aipl.com
Mobile
8800563717
Landline
9211160000
Address
33714-K Master Mohalla Tughalkabad Village Badarpur New Delhi - 110044

Managing Director/CEO

NOT APPLICABLE
Name
NOT APPLICABLE
PAN
XXXX0000
Email
rera-haryana@aipl.com
Mobile
8800563717
Landline
9211160000
Address
Not Applicable

Directors

DALJEET SINGH
Name
DALJEET SINGH
PAN
XXXX140B
Email
rera-haryana@aipl.com
Mobile
8800563717
Landline
9211160000
Address
B-3 Ansal Villa Farm Houses Satbari South Delhi - 110074
HARINDER SINGH
Name
HARINDER SINGH
PAN
XXXX399E
Email
rera-haryana@aipl.com
Mobile
8800563717
Landline
9211160000
Address
B-3 Ansal Villas Farm Houses Satbari Delhi - 110074
GURDEEP SINGH
Name
GURDEEP SINGH
PAN
XXXX332G
Email
rera-haryana@aipl.com
Mobile
8800563717
Landline
9211160000
Address
J-210 B W 15-A Western Avenue Sainik Farms Delhi - 110062
BALA KRISHNA PANDEY
Name
BALA KRISHNA PANDEY
PAN
XXXX349B
Email
rera-haryana@aipl.com
Mobile
8800563717
Landline
9211160000
Address
House No.- 61-A Bank Colony Street No. 4 Mandoli Mandoli Saboli North Delhi- 110 093
SHABEG SINGH
Name
SHABEG SINGH
PAN
XXXX336C
Email
rera-haryana@aipl.com
Mobile
8800563717
Landline
9211160000
Address
3602-110 Charles STE Toronto Ontario M4Y1T5

Contact Details

Project ContactEmail: rera-haryana@aipl.comMobile: 8800563717Landline: 9211160000
Project Contact PersonName: TO BE UPDATEDEmail: rera-haryana@aipl.comMobile: 8800563717Landline: 9211160000

Land Details

Land Area4.418 (Acre)
Proposed FAR350
Permissible FAR350
Total Licensed Land4.418 (Acre)

Land Usage

Land Cost7547.30 Lakhs
Other Cost21540.13 Lakhs
Estimated Project Cost66125.47 Lakhs
Estimated Infrastructure Cost5356.13 Lakhs
Estimated Apartment Construction Cost31681.91 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other0
Shopping area0
Roads & Pavements0
Water Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Electricity Supply System0
Clubhouse/community centres0
Sewerage treatment & garbage disposal0

Quarterly Infrastructure Expenditure

2022 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical Sub station81.7---
Electricity Supply System57.6000
Other0000
Parks and Playgrounds0000
Rain water harvesting5.4---
Roads & Pavements13.2000
STP8.1---
Security and Fire Fighting51.2---
Sewerage treatment & garbage disposal8.1000
Shopping area0000
Storm Water Drainage10.8000
Street lighting10---
Underground water tank2.7---
Water Supply System19000
2023 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical Sub station163.481.7163.4163.4
Electricity Supply System115.157.6115.1115.1
Other0000
Parks and Playgrounds0000
Rain water harvesting10.85.410.810.8
Roads & Pavements26.413.226.426.4
STP16.38.116.316.3
Security and Fire Fighting102.451.2102.4102.4
Sewerage treatment & garbage disposal16.38.116.316.3
Shopping area0000
Storm Water Drainage21.710.821.721.7
Street lighting20102020
Underground water tank5.42.75.45.4
Water Supply System37.91937.937.9
2024 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical Sub station200163.4200200
Electricity Supply System140.9115.1140.9140.9
Other0000
Parks and Playgrounds0000
Rain water harvesting13.310.813.313.3
Roads & Pavements32.326.432.332.3
STP19.916.319.919.9
Security and Fire Fighting125.3102.4125.3125.3
Sewerage treatment & garbage disposal19.916.319.919.9
Shopping area0000
Storm Water Drainage26.521.726.526.5
Street lighting24.52024.524.5
Underground water tank6.65.46.66.6
Water Supply System46.437.946.446.4
2025 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical Sub station020000
Electricity Supply System0140.900
Other0000
Parks and Playgrounds0000
Rain water harvesting013.300
Roads & Pavements032.300
STP019.900
Security and Fire Fighting0125.300
Sewerage treatment & garbage disposal019.900
Shopping area0000
Storm Water Drainage026.500
Street lighting024.500
Underground water tank06.600
Water Supply System046.400
2026 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical Sub station----
Electricity Supply System0000
Other0000
Parks and Playgrounds0000
Rain water harvesting----
Roads & Pavements0000
STP----
Security and Fire Fighting----
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Street lighting----
Underground water tank----
Water Supply System0000
2027 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical Sub station----
Electricity Supply System0000
Other0000
Parks and Playgrounds0000
Rain water harvesting----
Roads & Pavements0000
STP----
Security and Fire Fighting----
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Street lighting----
Underground water tank----
Water Supply System0000
2028 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0---
Electrical Sub station----
Electricity Supply System0---
Other0---
Parks and Playgrounds0---
Rain water harvesting----
Roads & Pavements0---
STP----
Security and Fire Fighting----
Sewerage treatment & garbage disposal0---
Shopping area0---
Storm Water Drainage0---
Street lighting----
Underground water tank----
Water Supply System0---

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEN/A
WALL FINISHING DETAILSN/A
KITCHEN DETAILSN/A
BATHROOM FITTINGSN/A
WOOD WORK ETCN/A
DOORS AND WINDOS FRAMESN/A
GLASS WORKN/A
ELECTRIC FITTINGSN/A
CONDUCTING AND WIRING DETAILSCONCEALED CONDUITING
CUPBOARD DETAILSN/A
WATER STORAGEN/A
LIFT DETAILSRETAIL – 3 PASSENGER LIFTS, 2 SERVICE LIFTS OFFICE – 5 LOW RISE LIFTS, 5 HIGH RISE LIFTS, 1 SERVICE LIFT
EXTERNAL GLAZINGSN/A
WINDOWS/GLAZINGSOFFICES - GLAZING WITH OPENABLE WINDOWS AS REQUIRED NO SHOP FRONT GLAZING
DOORSN/A
MAIN DOORSN/A
INTERNAL DOORSN/A
AIR CONDITIONING1. PROVISION OF AIR-CONDITIONING FOR SHOPS 2. CENTRALIZED AIR CONDITIONING FOR OFFICES
ELECTRICAL FITTINGSN/A
CNG PIPE LINEN/A
PROVISION OF WIFI AND BROADBAND FACILITYN/A
EXTERNAL FINISHING/COLOUR SCHEMEOFFICE AND RETAIL OUTER FAçADE ONLY - GLAZING/STONE/PAINT NO SHOP FRONT GLAZING
INTERNAL FINISHINGN/A

Unit-wise Specifications

TOILET
FLOORN/A
WALLSN/A
CEILINGN/A
COUNTERSN/A
SANITARY WARE/CP FITTINGSN/A
FIXTURESN/A
KITCHEN
FLOORN/A
WALLSN/A
CEILINGN/A
COUNTERSN/A
FIXTURESN/A
KITCHEN APPLIANCESN/A
SIT-OUTS
FLOORN/A
WALLS & CEILINGN/A
RAILINGSN/A
FIXTURESN/A
BED ROOMS
FLOORN/A
WALLSN/A
CEILINGN/A
WARDROBESN/A
MASTER TOILET
FLOORN/A
WALLSN/A
CEILINGN/A
COUNTERSN/A
SANITARY WARE/CP FITTINGSN/A
FITTING/FIXTURESN/A
MASTER BEDROOM/DRESSROOM
FLOORN/A
WALLSN/A
CEILINGN/A
MODULAR WARDROBESN/A
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORN/A
WALLSN/A
CEILINGN/A
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORN/A
WALLS & CEILINGN/A
TOILETN/A
BALCONYN/A

Fee Details

Payment 1
amount:178791
cheque no:3637
draft date:11-03-2020
payable to:HRERA Gurugram
payee bank:HDFC BANK LTD.
Payment 2
amount:4486268
cheque no:3636
draft date:11-03-2020
payable to:HRERA Gurugram
payee bank:HDFC BANK LTD.