Plot shall be demarcated using bricks masonry pillars finished with plaster, with plot number indicated, as per the approved layout.
A compound wall of 6ft height will be constructed along the entire project periphery using brick and RCC. The height of the wall will be 5 to 6 feet.
Internal roads of width 12m/9m/7.5m will be developed with WBM base and bituminous top layer as per MVDA norms.
Paved footpath all along roads having interlocking tiles of 80 mm
Underground HDPE pipeline network for portable water supply with individual plot connections and CWR storage. The water tank of 100000 liter will be constructed
Underground DWC pipe sewerage system connected to septic tanks and STP-90KLD, ensuring proper discharge provision. The underground pipes of 200 to 300 mm dia will be installed
Surface and underground storm water drainage system using DWC pipes and covered roadside drains designed for proper slope and discharge.
Well landscaped green parks with sitting arrangements for senior citizens and recreational play equipment for children ap per approved map.
Plantation of ornamental and shade trees along roads, park and plot boundaries in accordance with horticulture guidelines of MVDA.
Underground cable distribution with transformer installation and LED street lighting on both side of internal roads. The dedicated transformer of 550 KVA is proposed . The street lights of 4 m height will be provided along roads.
N.A.
Sewage collected via underground pipes will be treated in septic tanks and disposed via soak pits / STP as per environmental norms. The capacity as per design of 90KLD will be installed.
Door to Door collection system planned. Designated space for dustbins and segregation area.
Provision of rainwater harvesting pits at multiple locations along with pre location trenches to recharge ground water as per Jal Nigam / MVDA. 10000L
Use of energy efficient LED street lights. Electrical ducting designed for future solar integration.