Have queries on this Project?
26.236815
81.277366
Showing 3 blocks with 12 units
Total Carpet Area
6126.22 m²
65942.02 ft²
Total Units
241
1 different types
Blocks & Floors
3
4 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
11468.00 m²
123440.41 ft²
yes, the land has been demarcated .propsed area is clearly available for construction and development.
Boundary wall of 5 feet height , shall be constructred in RCC and brickwork . y
cross section of proposed roads are attatched . 12 m approach road shall be constructed in bituminous surface and side pattries shall be provided.
no. only side pattries shall be constructed on 12 m approach road . internal roads 9m , 7.5 m, 6 m shall be constructed in full width between drains in interlocking tiles over a granular base.
water supply shall be made available from tubewell and overhead Tank , water mains shall be laid underground in roads side . blocks shall have individual tanks for water supply to avas .
houses shall be connect through underground sewer. sewer line shall be dispose to septic tanks and soak pits .
K .C DRAIN shall be constructed along internal roads , and finally dispose in to existing drain near site.
yes , parks shall be developed as per the locations shown in lay out plan .
yes . trees shall be planted along road sides and in parks .
yes . electricity shall be provided in yojna . electric line plan has been attatched .
A primary school is running near to site in barkhapur village, conventional shops are proposed in blocks at ground floor .
Through septic tank and soakage pit
door to door collection is propose by RWA .
NO. due to running canal in vicinity of site , ground water level is moderetly high .
NO , it is a weaker section houses scheme .
NO , Height of buildings is 15 m only . that is exempted .
primary school and similar facilities of village barkhapur are existing .
not require, blocks are planned with stairs
as per govt. policy external development shall be execute under other welfare schemes .
Affordable housing scheme in Barkhapur Raebareli (Phase I) in PM Awas (Urban) yojna is located in Raebareli.
Yes. Affordable housing scheme in Barkhapur Raebareli (Phase I) in PM Awas (Urban) yojna is registered under UPRERAPRJ765992 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Affordable housing scheme in Barkhapur Raebareli (Phase I) in PM Awas (Urban) yojna is 31 December 2023.
Affordable housing scheme in Barkhapur Raebareli (Phase I) in PM Awas (Urban) yojna is developed by RAEBARELI DEVELOPMENT AUTHORITY.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.