NewActive

AERO CITY (PHASE-II)

Bareilly, Uttar Pradesh
25-08-2023
RERA Received Date
New
Type
24-08-2028
Completion Date

Overview

RERA Received Date

25-08-2023

Completion Date

24-08-2028

RERA ID

UPRERAPRJ225504

Location

Latitude

28.42357178

Longitude

79.42807015

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)11212
Project NameAERO CITY (PHASE-II)
Registration Fee (in Rs.)61500
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)60
DistrictBareilly
Original Start Date-
TehsilBareilly
Proposed Start Date25-08-2023
Sanctioning Competent AuthorityBareily Development Authority
Project Cost (in Lacs)1000
Proposed Completion Date24-08-2028

Bank Details

Account Details
Name of the AccountKUNAL PROPERTIES COLLECTION ACCOUNT AERO CITY PHASE II
Account Number46680200000396
Bank NameBANK OF BARODA
Branch NameMODEL TOWN BAREILLY
Branch AddressMODEL TOWN BAREILLY
Branch StateUttar Pradesh
Branch DistrictBareilly
IFSC CodeBARB0MODBLY
Separate Account Details
Name of the AccountKUNAL PROPERTIES SEPARATE ACCOUNT AERO CITY PHASE II
Account Number46680200000397
Bank NameBANK OF BARODA
Branch NameMODEL TOWN BAREILLY
Branch AddressMODEL TOWN BAREILLY
Branch StateUttar Pradesh
Branch DistrictBareilly
IFSC CodeBARB0MODBLY
Transaction Account Details
Name of the AccountKUNAL PROPERTIES RERA TRANSACTION ACCOUNT AERO CITY PHASE II
Account Number46680200000395
Bank NameBANK OF BARODA
Branch NameMODELTOWN BAREILLY
Branch AddressMODELTOWN BAREILLY
Branch StateUttar Pradesh
Branch DistrictBareilly
IFSC CodeBARB0MODBLY

Development Works

Demarcation of Plots

LAND IS WELL DEMARCATED AT SITE WITH A WIDE OPENING AT MAIN ROAD

Boundary Wall

A 2.5 MT HIGH PERMANENT BOUNDARY WALL IS PROPOSED TO BE CONSTRUCTED TO ENCLOSE THE SITE. A WELL DESIGNED GATE COMPLEX SHALL BE PART OF IT

Road Work

WITH 18 MT ENTRANCE ROAD, NETWORK OF 12 AND 9 MT WIDE RCC ROAD IS PROPOSED TO BE CONSTRUCTED AS PER CPWD NORMS.

Footpaths

1200-1500 MM WIDE PAVED AREA SHALL RUN ON BOTH SIDE OF THE ROAD AS FOOTPATH

Water Supply Including Drinking Water Facilities

SUBMERSIBLE WILL BE PROVIDED FOR WATER SUPPLY

Sewer System

A WLL DESIGNED SEWERAGE SYSTEM IS PROPOSED TO BE LAID TO CARRY SEWAGE/ SOIL WATER UP TO STP OF REQUIRED CAPACITY. ALL THE STANDARD QUALITY MATERIAL SHALL BE USED TO MATCH CPWD NORMS.

Drain

STORM WATER FROM ROAD AND OTHER LANDSCAPE AREA SHALL BE CONNECTED TO THE STORM WATER DRAIN CHANNEL WHICH SHALL LEAD TO RAIN WATER HARVESTING PITS TO RECHARGE THE GROUND WATER

Parks

MARKED GREEN AREAS SHALL BE DEVELOPED AS THEME PARKS WITH FACILITIES FOR ELDERLY, CHILDREN AND RESIDENTS IN GENERAL. LOW HIGHT TREES, SHRUBS AND GRASS CARPET SHALL BE COMMON TO ALL THE GREEN SPACES.

Tree Planting

ALL THE ROADS SHALL BE LINED WITH 4.5 TO 6 MT. HIGH TREES (BOTTLE PALM, FICUS ETC.) AT CLOSE RECOMMENDED INTERVALS.

Design For Electric Supply Including Street Lighting

WE WILL DESIGN AND IMPLEMENT THE SYSTEM AS PER LOCAL ELECTRICITY BOARD AND WILL CONSIDER CENTRALIZED TRASFORMER, HT PANNEL, LT PANNEL, FEEDER PILLAR AND DG BACK FOR COMMON SERVICE LIKE EXTERNAL LIGHTING, FOUNTAIN, STP, PUMP, ROOM ETC.

Community Buildings

NOT APPLICABLE

Treatment and Disposal System of Sewage and Sullage water

A WELL DESIGNED SEWERAGE SYSTEM IS PROPOSED TO BE LAID TO CARRY SEWAGE / SOIL WATER UP TO STP OF REQUIRED CAPACITY. ALL THE STANDARD QUALITY MATERIAL SHALL BE USED TO MATCH CPWD NORMS

Solid Waste Management And Disposal System

THERE IS A PROPER GARBAGE COLLECTION AREA MARKED FOR GARBAGE DISPOSAL. COLLECTION SHALL BE LINED UP WITH THE LOCAL MUNICIPAL AUTHORITIES.

Water Conservation System

APART FROM RAIN WATER HARVESTING TERATED WATER SHALL BE USED FOR IRRIGATION PURPOSES RESULTING IN ZERO WASTAGE.

Energy Management System Including Use of Renewable Energy

APART FROM USE OF LED LIGHTS, 50 PERCENT OF THE STREET LIGHTS SHALL HAVE SOLAR BACK UP. NATURAL LIGHT SENSITIVE LED LIGHTS SHALL BE USED IN COMMON AREA TO AVOID ELECTRICITY WASTAGE

Fire Protection And Fire Safety System

NOT APPLICABLE

Social Infrastructure And Other Public Amenities Including Public Health Services

NOT APPLICABLE

Emergency Evacuation Services

ALL THE EXIT ROADS ARE MINIMUM 9 MT WIDE WITH 18 MT WIDE MAIN EXIT TO FACILITATE AN EASY EMERGENCY EXIT.

Other Miscellaneous Work

WE WILL PROVIDE INDIVIDUAL SUBMERSIBLE TO FULL FILL WATER REQUIRED FOR USAGE AND STANDARD

Documents

Registry Document

No: 12274 | Date: 01-10-2021

Registry Document

No: 12275 | Date: 01-10-2021

Sale Deed

No: 3881 | Date: 17-07-2006

Sale Deed

No: 3880 | Date: 17-07-2007

Extract of Khatauni

No: 1430-1435 | Date: -

Registry Document

No: consortium agreement | Date: 20-10-2023

Registry Document

No: SAJRA SUPERIMPOSED | Date: 28-10-2023

Details of Encumbrances

Uploaded: 13-09-2023

Proforma of Application Form

Uploaded: 14-09-2023

Proforma of Allotment Letter

Uploaded: 14-09-2023

Proforma of Conveyance Deed

Uploaded: 14-09-2023

Waste Disposal Plan

Uploaded: 13-09-2023

Water Supply Plan

Uploaded: 13-09-2023

Electricity Supply Plan

Uploaded: 14-09-2023

Development Work Plan

Uploaded: 24-10-2023

Affidavit

Uploaded: 14-09-2023

CA CERTIFICATE

Uploaded: 14-09-2023

ARCHITECT CERTIFICATE

Uploaded: 14-09-2023

ENGINEERS CERTIFICATE

Uploaded: 14-09-2023

Other

Uploaded: 09-11-2023

Permits

Orignal Permit NoBDA/LD/22-23/0147
Orignal Permit Date25-08-2023
Valid Upto24-08-2028
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto24-08-2028
End Date24-08-2028
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesNot Specified
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)aman contructions
Contractor Addressresidency garden bareilly
Architect NameAMAN PREET KAUR
Architect AddressH NO. 9 RESIDENCY GARDEN STADIUM ROAD BAREILLY
Architect Licence NumberCA/2013/58352
Structural Engineer NameANAND PRAKASH
Structural Engineer Address79-80 RADHEY SHYAM ENCLAVE RAMPUR GARDEN BAREILLY 243001
Mobile number(Project Co-ordinator)8057916482

Land Details

Plot

Showing 1 blocks with 3 units

Property Summary

Total Carpet Area

0.00

0.00 ft²

Total Units

0

1 different types

Blocks & Floors

1

1 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:NaN
Balconies:0
Parking ratio:NaN per unit

Block undefined

3 units

Khasra Details

Total Area

11211.55

120680.00 ft²

5 plots
Khasra
TypeKhasra
Khasra/Plot No428,429,431,432
Area(In Sq. Mt.)6298
Khasra
TypeKhasra
Khasra/Plot No430
Area(In Sq. Mt.)2660
Khasra
TypeKhasra
Khasra/Plot No512(p)
Area(In Sq. Mt.)800
Khasra
TypeKhasra
Khasra/Plot No531(p)
Area(In Sq. Mt.)733
Khasra
TypeKhasra
Khasra/Plot No532(p)
Area(In Sq. Mt.)720.55

Other Details

Contractor Name (if any)aman contructions
Contractor Addressresidency garden bareilly
Architect NameAMAN PREET KAUR
Architect AddressH NO. 9 RESIDENCY GARDEN STADIUM ROAD BAREILLY
Architect Licence NumberCA/2013/58352
Structural Engineer NameANAND PRAKASH
Structural Engineer Address79-80 RADHEY SHYAM ENCLAVE RAMPUR GARDEN BAREILLY 243001
Mobile number(Project Co-ordinator)8057916482
AERO CITY (PHASE-II) by KUNAL PROPERTIESMANMOHAN SINGH CHHABRAMANPREET KAURSATNAM KAUR | ReraTracker