NewActive

ACE YXP

Gautam Buddha Nagar, Uttar Pradesh
image
image
image
image
image
15-01-2024
Launch Date
New
Type
31-03-2027
Completion Date

Overview

Launch Date

Invalid Date

Completion Date

31-03-2027

RERA ID

UPRERAPRJ397607

Basic Details

Project TypeNew
Project CategoryCommercial
Total area in round figure (Sq.mt.)16004.32
Project NameACE YXP
Registration Fee (in Rs.)489000
AddressPLOT NO C-1 & C-2/ TS-06
Village/Locality/Sector etc.SECTOR-22D
StateUttar Pradesh
Project Duration (In month)39
DistrictGautam Buddha Nagar
Original Start Date-
TehsilGautam Buddha Nagar
Proposed Start Date15-01-2024
Sanctioning Competent AuthorityYamuna Expressway Authority
Project Cost (in Lacs)23500
Proposed Completion Date31-03-2027

Location

Latitude

28.3166194

Longitude

77.55030555555555

ACE YXP Location Map
ACE YXP Location Map

Layout

Loading
ACE YXP Masterplan
ACE YXP Masterplan

Brochures

Loading

Walkthrough

Loading

Bank Details

Account Details
Name of the AccountSTARCITY BUILDERS AND PROMOTERS LLP RERA COLLECTION ACCOUNT ACE YXP
Account Number50200087077769
Bank NameHDFC BANK LTD
Branch NameAnsal fortune Arcade K -Block Sector-18
Branch AddressGautam Budh Nagar; Noida
Branch StateUttar Pradesh
Branch DistrictGautam Buddha Nagar
IFSC CodeHDFC0000088
Separate Account Details
Name of the AccountSTARCITY BUILDERS AND PROMOTERS LLP RERA SEPERATE ACCOUNT ACE YXP
Account Number50200087077312
Bank NameHDFC BANK LTD
Branch NameAnsal Fortune Arcade , K Block Sector-19
Branch AddressGautam Budh Nagar; NOIDA
Branch StateUttar Pradesh
Branch DistrictGautam Buddha Nagar
IFSC CodeHDFC0000088
Transaction Account Details
Name of the AccountSTARCITY BUILDERS AND PROMOTERS LLP RERA TRANSACTION ACCOUNT ACE YXP
Account Number50200087050718
Bank NameHDFC BANK LTD
Branch NameAnsal Fortune Arcade, K- BLOCK SECTOR-18
Branch AddressGautam Budh Nagar ; NOIDA
Branch StateUttar Pradesh
Branch DistrictGautam Buddha Nagar
IFSC CodeHDFC0000088

Development Works

Demarcation of Plots

The plot will be demarcated as per the sanction and the survey drawings. The demarcation will be done to ensure proper site dimensions, area of the site and other conditions.

Boundary Wall

A boundary wall of RCC/Brick will be constructed three side of the plot and one side will be the railing. This boundary wall will be strong and sturdy and it will help in the safety of the occupants.

Road Work

The Road will be done in Trimix, stone pavers or concrete pavers. It will be designed to take up the LIVE and the DEAD loads as per NBC and other approvals.

Footpaths

Designed footpaths for walking and for going from one place to other. Use of cobbles, stones, concrete and other materials will be done so that its inviting for other people to walk upon.

Water Supply Including Drinking Water Facilities

YIEDA shall supply water for the entire complex and it shall be treated in the WTP and supplied.

Sewer System

Centralised STP to treat the sewage will be designed and provided in the project. The capacity of the STP will be adequately designed as per the requirements.

Drain

Rain water drains will be provided as per the design. The drawing will be provided such that they will carry all the rain water though a proper network and will take thru the ring line running along the boundary wall and ultimately discharging in the RWH pits. The slopes and the levels will be maintained to avoid water logging and flooding.

Parks

Beautiful open spaces will be designed for the endusers to enjoy and relax. Seating plaza, outdoor seating places and water bodies will be made in the parks.

Tree Planting

As per the approved building plan, apt number of trees will be provided. The trees will be a mix of ornamental and foliage trees and also the areas will be covered by hedges, shrubs, flowering plants to give soothing effect tot the whole campus.

Design For Electric Supply Including Street Lighting

Power supply from YIEDA /electricity board will be taken and distributed with proper metering system. Duel metering will be done for the mains and the DG supply. The street lighting will be provided a per the approved building plan and as best suited to lit all the driveways and the pathways. It will be implemented so that the areas remain well lit during evening operation hours.

Community Buildings

Social gathering places are being provided in the plaza of the complex. Beautiful pathways, benches, seating spaces, water bodies and shaded areas are being provided for everyone to relax and enjoy.

Treatment and Disposal System of Sewage and Sullage water

Centralised STP to treat the sewerage. Proper networking of the sewage system will be done so that its effective and efficient. All the toilets will be connected through proper network of pipes.

Solid Waste Management And Disposal System

Collection, segregation, storage and disposal as per norms and NBC will be done. Dedicated housekeeping staff will be deployed for the same and coloured bins will be provided to be placed across the complex to collect the waste in segregated form.

Water Conservation System

Rainwater harvesting system is being provided to recharge the rain water into the ground, thereby conserving the water. Duel flushing system is being provided to re-use the treated STP water for flushing purposes.

Energy Management System Including Use of Renewable Energy

100 usage of LED lights will be done so as to to conserve electricity. Proper and efficient metering system will be deployed so as to reduce the wastage of electricity to minimum levels. Also sensors will be provided in toilets and other strategic areas so that electrical efficiency is achieved.

Fire Protection And Fire Safety System

As per approved building plan and as per the approved fire NOC. The fire protection system will consist of fire tanks connected to the piping network and further connected to sprinklers and hydrants. The smoke detectors will be provided.

Social Infrastructure And Other Public Amenities Including Public Health Services

Designed outdoor spaces will be provided for social gatherings and entertainment purposes. Public health services can be operated in the spaces allocated for the same and well being of the end users of the complex.

Emergency Evacuation Services

Fire staircases will be provided as per the building approvals and as per NBC. There will be designated places for evacuation measures, gathering spaces during the times of emergency and also the evacuation system will be properly designed.

Other Miscellaneous Work

The same will be done as per the approved building plan. We are going to make 2-3 waterbodies in the complex so that the area remains cool and comfortable.

Documents

Lease Deed

No: Book no-1, Volume 42969, pages 341-390, Document No-15031, Dated12/06/23. Register in the office of | Date: 12-06-2023

Allotment Letter issued by Competent Authority

No: 26/YEA-RT-02/2011 | Date: 17-02-2011

Lease Deed

No: BookNo -1, Volume 42969, pages 341-390, Document No-15031, Dated 12/6/23 Register in the office | Date: 12-06-2023

Details of Encumbrances

Proforma of Application Form

Proforma of Allotment Letter

Proforma of Conveyance Deed

Proforma of Completion Certificate(Occupancy)

CA CERTIFICATE

ARCHITECT CERTIFICATE

ENGINEERS CERTIFICATE

Details of Encumbrances

Uploaded: 21-10-2023

Commencement Certificate

Uploaded: 09-10-2023

Other Plan(If Any)

Uploaded: 09-10-2023

Proforma of Application Form

Uploaded: 23-10-2023

Proforma of Allotment Letter

Uploaded: 23-10-2023

Proforma of Conveyance Deed

Uploaded: 21-10-2023

Waste Disposal Plan

Uploaded: 09-10-2023

Water Supply Plan

Uploaded: 09-10-2023

Electricity Supply Plan

Uploaded: 09-10-2023

Development Work Plan

Uploaded: 09-10-2023

Affidavit

Uploaded: 12-10-2023

CA CERTIFICATE

Uploaded: 21-10-2023

ARCHITECT CERTIFICATE

Uploaded: 21-10-2023

ENGINEERS CERTIFICATE

Uploaded: 22-11-2023

Other

Uploaded: 22-11-2023

Permits

Orignal Permit NoYEA/Planning/1532/2023
Orignal Permit Date27-09-2023
Valid Upto26-09-2028
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto31-10-2030
End Date31-03-2027
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)D.P Contractors
Contractor AddressI-56, Delta-2, Greater NOIDA, GB Nagar UP- 201306
Architect NameRavi Garg -ACPL Design Ltd
Architect AddressE-24 South EX-1, E-block, New Delhi, 110049
Architect Licence NumberCA-2013/58473
Structural Engineer NamePankish Goyal
Structural Engineer AddressB-74, Sector 57, NOIDA, 201301
Mobile number(Project Co-ordinator)8588806417

Land Details

AFS

Showing 1 blocks with 526 units

Property Summary

Total Carpet Area

20851.19 m²

224440.12 ft²

Total Units

596

3 different types

Blocks & Floors

1

15 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:34.99 m²
Balconies:29
Parking ratio:0.00 per unit

Block 1

526 units

Khasra Details

Total Area

16004.32 m²

172268.90 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoC1 and C2 /TS-06, Sector 22D YEIDA City
Area(In Sq. Mt.)16004.32

Other Details

Contractor Name (if any)D.P Contractors
Contractor AddressI-56, Delta-2, Greater NOIDA, GB Nagar UP- 201306
Architect NameRavi Garg -ACPL Design Ltd
Architect AddressE-24 South EX-1, E-block, New Delhi, 110049
Architect Licence NumberCA-2013/58473
Structural Engineer NamePankish Goyal
Structural Engineer AddressB-74, Sector 57, NOIDA, 201301
Mobile number(Project Co-ordinator)8588806417