Launch Date
Completion Date
Project Size
Total Floors
Launch Price
RERA ID
28.330472
77.546981
The plot will be demarcated as per the sanction and survey drawing.
Boundary wall of RCC/ brick with plaster and railing will be prepared.
Access road to all towers will be provided and the road will be designed to take up live load as per approvals and NBC.
Designed footpath in the central green as walkway and jogging track.
Authority shall supply water for the entire society and it shell be treated and pumped to all the houses.
Centralised STP to treat the sewage will be designed and provided.
Rain water drains will be provided as per the design.
Beautiful parks will be made for all residents to enjoy.
As per approved building plan, apt number of trees will be provided.
Power supply from electricity board and street lighting as per approved building plan.
Club will be made as per approved building plan and it will be a state of the art building with all modern facilities.
Centralised STP to treat the sewage.
Collection, storage and disposal will be done as per sanctions and NBC.
Rain water harvesting system is being provided to conserve rain water and dual flush system will also be provided with water saving fittings.
Usage of LED lights will be used all over the project and use of solar lights will also be explored.
As per approved building plan we will design best fire protection system consisting of sprinklers, smoke detectors and fire alarm.
Social gathering places in the club are being provided such as community hall.
As per approved building plan and fire approvals, fire staircase are being provided.
As per approved building plans.
Showing 7 blocks with 373 units
Total Carpet Area
74947.26 m²
806724.81 ft²
Total Units
1287
4 different types
Blocks & Floors
7
26 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
32273.00 m²
347383.34 ft²