The plot has 26000 Sqm. of the area that will be demarcated as per the sanctioned and survey drawing.
A Boundary wall of (approx 850 m running length) RCC/brick with plaster and railing will be prepared.
7.5 M wide Access road to all towers will be provided and the road will be designed to take up live load as per approvals and NBC.
Designed a footpath in the plaza as a walkway and jogging track.
GNIDA authority shall supply water for the entire society and shall be treated and pumped to all the houses.
Centralized STP to treat the sewage will be designed and provided.
Rainwater drains will be provided as per the design to carry all the rainwater of the complex in a ring line. The same will be connected to rainwater harvesting pits.
Beautiful parks will be made for all residents to enjoy. The parks will have relaxing and entertainment zones along with spaces meant for senior citizens, kids and enjoyment.
As per the approved building plan, an apt no. of trees will be provided. The trees will be a mix of evergreen and flowering trees. There will be theme tree plantations and the complex will have a lush green outlook.
Power supply from electricity board and street lighting as per approved building plan. The lighting will be adequate to lit up the dark spaces and all pathways as well as driveways.
The Club will be made as per the approved building plan and it will have all the modern facilities. Social gathering places are also being provided in the plaza. The residents will be able to enjoy in the club as a place for social gatherings and relaxation.
Centralized STP to treat the sewage. The STP will treat all the sewage generate from the society and will be maintained properly.
Collection, storage and disposal will be done as per sanction and NBC. Collection of solid waste in the segregated system will be done so that the recyclable waste can be separated in an efficient way from the wet kitchen waste.
Rainwater harvesting system is being provided to conserve rainwater and a dual flush system will also be provided with water-saving fittings. (7 no. of RHW pits proposed)
Usage of LED lights will be used all over the project and the use of solar lights will also be explored.
As per the approved building plan, we will design the best fire protection system consisting of sprinkler, smoke detectors and fire alarms.
Social gathering places are being provided in the plaza. These places will be spread over the whole complex and the residents will be able to enjoy the same. Swimming pool, gym, indoor play area, playing courts, all these facilities will be provided in the complex.
As per the approved building plan and fire approvals, fire staircase are being provided. All fire exit passage shall be kept clear all the time and proper audit as well as fire drills will be done in the society.
As per approved building plans. Any and all the works will be done to make the project very comfortable and of good quality for all the residents. The water bodies will be made in the complex to make it look more beautiful as well as a place to feel calm and relaxed.
Showing 7 blocks with 191 units
Total Carpet Area
72887.51 m²
784553.87 ft²
Total Units
556
5 different types
Blocks & Floors
7
29 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
26000.00 m²
279861.40 ft²