Plot will be demarcated as per approved MVDA Map. Only 4 plots are there in this project. The plots and roads will be constructed as per approved map in line dimension, size and orientation.
Applicable boundary wall in Brick and Mortar will be constructed . The same will be plastered and painted. The foundation of wall will be minimum 3 feet.
Paver Block of M-40 grade will be laid over the compacted Earth, Granular Layer and sand bed. 9.30m wide road will be constructed. The earth/subgrade and granular layers will be compacted to the required density
Paver Blocks will be placed at required locations in he width of 1m. The earth will be compacted and sand bed of 40-50 mm will be placed.
Submersible pump system will be installed for individual units as per approval by MVDA. The ground water will be pumped though the pumps with capacity to reach up to the terrace tanks of the units.
Individual septic tank will be constructed with separation tanks The connections will be provided to each unit. The tanks will have minimum liquid capacity of 200o liters. The dimension will be minimum 1x4 meter with wall width of minimum 750 mm.
Lined drain will be constructed to cater for the drain and rain water with minimum width of 200mmm and trapezoidal shape for better flow. The concrete walls will be of minimum 75mm at sides and 100 mm at base.
Not Applicable
At all suitable locations the trees will be planted
Electrical supply will be provided through electrical poles and distribution boxes. The street lights will be provided on road sides and common areas. The connection will be provided through electrical poles and distribution boxes.. The height of street light will be minimum 4.5 meter with minimum 150lux.
Not Applicable
Not Applicable
The dustbins will be installed. Thereon the garbage will be collected and disposed off to the specified location by municipal corporation.
A rain water harvesting system will be constructed as per approval. a 20000 ltr capacity harvesting pit will be constructed. The filter will of multilayer to the depth of 3m and there on the perforated pipes off 100 mm dia will be driven in to the ground.
Not Applicable
Not Applicable
Not Applicable
Not Applicable
As per Site Requirements for the betterment of project.
Showing 1 blocks with 2 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
1307.82 m²
14077.24 ft²