Launch Date
Completion Date
RERA ID
28 42' 28.36' N
77 25'28.83' E
Private - Freehold Land , Demarcation was already done before starting the project
Boundary wall on RCC tie - Beams , supported on RCC footings
Cement Concrete Internal Roads (CC Roads above the two coarse of WBM .
Interlocking Pavers on PCC & compacted surface
To be provided by Ghaziabad Development Authority & Storage will be done in under ground water tank.
Main Sewer line has been designed as per norms and partily laid in basement ceiling and will finally connect to Sewer line / STP
Underground pipe drain with chamber
Landscape and Park has been designed as per authority guidelines.
Tree Planting has been designed as per authority guidelines
Design has been done as per UP Electricity Board Guidelines
Club has been designed as per authority norms & facility like-Party Hall, Gaming Zone , Entertainment area,etc.
Sewage will be treated for recycling (If required) otherwise, it will be connected to the sewer line of authority which is already connected to to central functional STP of GDA for this locality.
Door to door collection & will be disposed up to garbage point of authority.
Recycling of treated water and rain water system to be provided.
Solar panels has been provided as per norms at suitable place.
System will be provided as per the fire department guidelines.
Primary School & convenient shops in the primises ,
Provision of Exit Sign & Emergency Lights
N/A
Showing 4 blocks with 285 units
Total Carpet Area
33894.63 m²
364838.41 ft²
Total Units
611
5 different types
Blocks & Floors
4
24 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
8207.00 m²
88339.33 ft²