NewActive

Shere Shalimar Mannat Extension

Barabanki, Uttar Pradesh
10-02-2020
Launch Date
New
Type
08-08-2024
Completion Date

Overview

Launch Date

10-02-2020

Completion Date

08-08-2024

RERA ID

UPRERAPRJ243983

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)8705
Project NameShere Shalimar Mannat Extension
Registration Fee (in Rs.)49000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)54
DistrictBarabanki
Original Start Date-
TehsilNawabganj
Proposed Start Date10-02-2020
Sanctioning Competent AuthorityAny Other Competent Authority
Project Cost (in Lacs)6634
Proposed Completion Date08-08-2024

Location

Latitude

26.902089

Longitude

81.101320

Bank Details

Account no.10822000000064
Name Of Account HolderShalimar Corp Ltd
Bank NameDCB Bank Ltd
Branch AddressVibhuti Khand, Gomti Nagar, Lucknow
Branch NameGomti Nagar Lucknow
IFSC CodeDCBL0000108

Development Works

Demarcation of Plots

This is single plot curved trapezoide shaped , having total 1 no. of entry gate and 1no. of exit gate from the 18m wide front road, Site is surronded by other plots on one side

Boundary Wall

1.8 - 2.1m high and 200 mm thick Boundary wall designed . Brick Work of 9inches and rcc work in column and beam may be used as per design. MS Broad entrance and exit gates are developed with boundary.

Road Work

Concerete Road with bituminous Cover/ High quality concrete pavers will be used as per deisgn suggested by the Architect for internal road.

Footpaths

All internal roads will have narrow footpath red sand stone pavers or equivalent finishes

Water Supply Including Drinking Water Facilities

Ground water may also be used, Also end user shall be used their individual RO system as per their requirement. Overhead tanks shall be provided on building terrace for distribution through gravity.

Sewer System

Centralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for tretement after treatement ,water shall be recycle and it will use in gardening, flush tanks and vehicle washing, oveflow from the STP shall be connect with the Municiple sewarage system.

Drain

Storm water system shall be Provided. Storm water from Roads and other lanscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municiple drain line.

Parks

There is one green area in front of building, play area for childrens and different recretional activities

Tree Planting

"There are 5 type of trees povided in site which are kachnar, gulmauhar, amaltas, kusum and neem."

Design For Electric Supply Including Street Lighting

We have designed the system as per local electricity Board and consider centralized Transformer,HT panel,LT Panel,Feeder Pillar and DG back for common service like External lighting,STP,Pump room etc.

Community Buildings

Fully centralised AC Club House/community center is provided on the lower ground floor, and some temporary kiosks on the central atrium with sitting area of each building.

Treatment and Disposal System of Sewage and Sullage water

Centralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for tretement after treatement ,water shall be recycle and it will use in gardening, flush tanks and vehicle washing, oveflow from the STP shall be connect with the Municiple sewarage system.

Solid Waste Management And Disposal System

There are a proper garbage collection area provided for the solid waste management.

Water Conservation System

A well designed rain water harvesting system shall be provided for the whole building complex to conserve water.

Energy Management System Including Use of Renewable Energy

We will use LED lights fitting in external area as well as solar lights. In STP and Pump room all the equipment shall have energy efficient motor. 25 % of Terrace is covered with Solar Votaic Panels to provide Renewable source of energy for common areas in building complex.

Fire Protection And Fire Safety System

Since the building is less than 50m in height all the fire norms shall be followed as NBC and approval of fire department

Social Infrastructure And Other Public Amenities Including Public Health Services

Sewerage ,Storm water and water supply system shall be Provided. We have Proposed common Pump Room with Primary filteration, Transfer pumps to fill the domestic overhead tank. Water for domestic use & Flushing go down through gravity from domestic as well as flushing tanks. All Sewgage shall be go to the STP for recycling the water. Storm water for Roof,Roads and other area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municiple drain.

Emergency Evacuation Services

Fire Staricase is provided in the central atrium of each building, with fire resistant doors, basements have 1 (one) accesses to exit in case of emergency

Other Miscellaneous Work

Luxurious entrance lobby with water cascade in each block, convenience store at the entrance gate for day to day small purchasings, lush green shurbs at every vacant space on ground.

Documents

Registry Document

No: 4156 | Date: 11-05-2010

Registry Document

No: 4141 | Date: 11-05-2010

Registry Document

No: 16425 | Date: 02-09-2015

Extract of Khatauni

No: - | Date: -

Proforma of Completion Certificate(Occupancy)

CA CERTIFICATE

Details of Encumbrances

Uploaded: 29-01-2020

Commencement Certificate

Uploaded: 29-01-2020

Other Plan(If Any)

Uploaded: 29-01-2020

Proforma of Application Form

Uploaded: 29-01-2020

Proforma of Allotment Letter

Uploaded: 29-01-2020

Proforma of Conveyance Deed

Uploaded: 29-01-2020

Waste Disposal Plan

Uploaded: 29-01-2020

Water Supply Plan

Uploaded: 29-01-2020

Electricity Supply Plan

Uploaded: 29-01-2020

Development Work Plan

Uploaded: 29-01-2020

Affidavit

Uploaded: 07-02-2020

ARCHITECT CERTIFICATE

Uploaded: 29-01-2020

ENGINEERS CERTIFICATE

Uploaded: 29-01-2020

Permits

Orignal Permit No235/2019
Orignal Permit Date09-12-2019
Valid Upto08-12-2024
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto08-12-2027
End Date09-02-2024
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)NJC Infra Corporation Pvt. Ltd.
Contractor AddressVill- Taskha, Near Maruti Showroom, Rampur UP-244901
Architect NameJSR Architects
Architect AddressC-67, Defence Colony, New Delhi.
Architect Licence NumberCA/94/17216
Structural Engineer NameMr. Paresh Jauhri
Structural Engineer Address20, Central Lane Babar Road , New Delhi-110001
Mobile number(Project Co-ordinator)9039066603

Land Details

AFS

Showing 4 blocks with 84 units

Property Summary

Total Carpet Area

14068.80 m²

151435.16 ft²

Total Units

160

2 different types

Blocks & Floors

4

11 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:87.93 m²
Balconies:240
Parking ratio:0.00 per unit

Block Tower K1

21 units

Block Tower K2

21 units

Block Tower K3

21 units

Block Tower K4

21 units

Khasra Details

Total Area

8705.00 m²

93699.75 ft²

1 plot
Khasra
TypeKhasra
Khasra/Plot No111P, 112P, 113, 114P and 115P
Area(In Sq. Mt.)8705

Other Details

Contractor Name (if any)NJC Infra Corporation Pvt. Ltd.
Contractor AddressVill- Taskha, Near Maruti Showroom, Rampur UP-244901
Architect NameJSR Architects
Architect AddressC-67, Defence Colony, New Delhi.
Architect Licence NumberCA/94/17216
Structural Engineer NameMr. Paresh Jauhri
Structural Engineer Address20, Central Lane Babar Road , New Delhi-110001
Mobile number(Project Co-ordinator)9039066603