Demarcation of Project to be done at site as per Approved Layout.
Boundary wall will be constructed by Brick work/MS Railing as per requirement and designed by promoter.
Internal drive way 6 mtr wide, will be developed by RCC/Interlocking Pavers/Bitumen as per approved layout, as per requirement and designed by promoter.
Both side of road, Footpath will be developed, widh 1.0 to 3.0 mtr. as per requirement and designed by promoter.
Water supply including drinking water facilities will be provided by promoter through Roof Tank/Bore well.
Common S.T.P will be constructed by promoter, for GH-6, at site for Sewer Disposal.
Drainage system will be developed and connected with RWH over flow will be connected with Existing Drains.
Common Parks/Green area approx 2400 sqm will be developed in GH-6. And will be developed as per approved plan and requirements.
Required Tree approx 73-135 nos, will be planted in GH-6 within parks, road side and boundary, as per requirement and norms.
Common ESS developed for Integrated Township. Electric supply will be provided from ESS. Street lights will be fixed at road berms as per requirements and design.
Common Community Building as per approved layout, will be provided for Integrated Township.
S.T.P will be constructed for GH-6, and treated water will be use in Irrigation of green areas and as per Govt. norms.
Solid waste management and disposal system will be provided as per requirement and Govt, Norms.
Water conservation System will be provided as per Govt. Norms
Energy management system i/c use of renewable energy will be provided as per Govt. Norms
Fire safety system will be provided as per approval, Design Norms
N/A
N/A
As per Specification Approved map all works will be developed.
Showing 1 blocks with 18 units
Total Carpet Area
2014.07 m²
21679.25 ft²
Total Units
63
1 different types
Blocks & Floors
1
9 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
15180.00 m²
163396.00 ft²