Launch Date
Completion Date
RERA ID
28.98983
77.76967
Site Located at 109 Kila Road, Abdullapur, Meerut with Area of New Saket Phase-2 is 23,889 Sq. Mtrs.
Boundary wall will be provided along with Periphery.
Road will be provided for access to all building as per following right of way Internal road of 12 Mtr., 9 Mtr., 6 Mtrs. ROW as per Approved Plan.
Proper Footpath will be provided.
Sufficient water will be supplied to individual apartments through pipelines. Water may be sourced from Municipal supplies of Bore well.
Underground sewer lines with necessary manholes and pipeline will be provided.
Underground drainage system with necessary manholes and pipelines will be provided.
Proper Park will be provided
Sufficient number of trees will be planted.
HT Power will be handled through Transformer and Sub Station and LT power will be distributed to Individual building and apartment. Proper Street light will be provided.
Not Applicable
Treatment and Disposal system of Sewage and Sullage water will be provided as per NBC norms.
Manual Collection and disposal system for solid waste shall be provided.
Adequate number of rain water harvesting pits will be provided.
Not Applicable
Overhead fire tank will be provided as per NBC norms.
Convenient shops will be provided.
Fire staircase and fire tender path will be provided.
Not Applicable
No: Reply Letter to UP RERA Regarding Objection of New Saket Phase-2 Registration | Date: 16-08-2023
No: NOC from MDA Dated 17.08.2023 | Date: 17-08-2023
No: BhuNaksha Sajra of New Saket Phase-2 Khasra No. | Date: 14-09-2023
No: Reply Letter Regarding Notice Dated 11.09.2023 of New Saket Phase-2 Project Registration | Date: 14-09-2023
Showing 15 blocks with 390 units
Total Carpet Area
26298.09 m²
283070.01 ft²
Total Units
640
3 different types
Blocks & Floors
15
4 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
36794.00 m²
396046.94 ft²