Launch Date
Completion Date
RERA ID
28.451112
77.516519
N.A.
230 MM TOE WALL
ALL ROADS IN THE COMPLEX WILL BE IN COMBINATION OF TRIMIX CONCRETE PAVERS OF DIFFERENT COLOURS AND SHAPES.
ALL FOOTPATHS IN THE COMPLEAS WILL BE IN COMBINATION OF TRIMIS, CONCRETE PAVERS OF DIFFERENT COLOURS AND SHAPES.
POTABLE WATER SUPPLY FROM MUNICIPAL WATER SUPPLY SHALL BE COLLECTED IN AN UNDERGROUND COLLECTION TANK AND SHALL BE PUMPED TO OVERHEAD WATER TANK. SUPPLY TO INDIVIDUAL UNITS SHALL BE FROM THE OVERHEAD TANK.
SEWER SYSTEM WITH DWC HDPE OR EQUAL PIPLE SHALL BE CONNECTED TO AUTHORITIES DISPOSAL LINE.
RCC NP2 OR EQUIVALENT PIPE SHALL BE CONNECTED TO RAIN HARVESTING PITS AND OVERFLOW TO THE AUTHORITY DRAININAGE SYSTEM.
N.A.
THE TREES SHALL BE PLANTED TO ALL SUITABLE LOCATIONS AND ALONG THE BOUNDARY WALL OF THE PROJECT.
UNDERGROUND ELECTRIC SUPPLY PROVIDED WITH 75 PERCENT DIVERSITY FACTOR AND ELECTRIC STREET LIGHTING POLES ON THE PATHWAY.
NOT APPLICABALE
TO BE CONNECTED IN EXTERNAL SEWAR LINE.
COLLECTION AND DISPOSAL THROUGH AUTHORISED VENDORS.
RAIN HARVESTING PITS SHALL BE PROVIDED FOR GROUNDWATER RECHARGING AND OVERFLOW TO BE DISCHARGED IN MUNICIPAL DRAINS.
ELECTRICAL APPLIANCES WITH 5-STAR RATING SHALL BE USED.
HYDRANTS WITH AUTOMATIC SPRINKLERS AND DETECTION SYSTEM SHALL BE PROVIDED.
NOT APPLICABALE.
FIRE EXIT STAIRCASES ARE PROVIDED.
NOT APPLICABLE.
Showing 1 blocks with 87 units
Total Carpet Area
5327.74 m²
57347.26 ft²
Total Units
229
2 different types
Blocks & Floors
1
8 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
3132.00 m²
33712.53 ft²