GANPATI SMART CITY/GANPATI UNNATI AWAS YOJNA/NARMADA TOWER - 4

Agra, Uttar Pradesh
01-01-2019
Launch Date
New
Type
30-06-2022
Completion Date

Overview

Launch Date

01-01-2019

Completion Date

30-06-2022

RERA ID

UPRERAPRJ726434

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)1161
Project NameGANPATI SMART CITY/GANPATI UNNATI AWAS YOJNA/NARMADA TOWER - 4
Registration Fee (in Rs.)11000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)42
DistrictAgra
Original Start Date-
TehsilAgra
Proposed Start Date01-01-2019
Sanctioning Competent AuthorityAgra Development Authority
Project Cost (in Lacs)1791
Proposed Completion Date30-06-2022

Location

Latitude

27'13'54.32'N

Longitude

77'57'08.71'E

Bank Details

Account Details
Name of the AccountGANPATI INFRASTRUCTURE DEVELOPMENT COMPANY LIMITED
Account Number01210350000233
Bank NameHDFC BANK LIMITED
Branch NameSANJAY PLACE AGRA
Branch AddressSANJAY PLACE
Branch StateUttar Pradesh
Branch DistrictAgra
IFSC CodeHDFC0000121
Transaction Account Details
Name of the AccountGANPATI INFRASTRUCTURE DEVELOPMENT COMPANY LIMITED
Account Number01210350000233
Bank NameHDFC BANK LIMITED
Branch NameSANJAY PLACE
Branch AddressSANJAY PLACE
Branch StateUttar Pradesh
Branch DistrictAgra
IFSC CodeHDFC0000121

Development Works

Demarcation of Plots

The land is clearly demarcated properly.

Boundary Wall

yes (Not possible since its already a part of entire project. The entire boundary wall of land is complete.

Road Work

The approach road till the sub project (tower) is complete.

Footpaths

N/A

Water Supply Including Drinking Water Facilities

Drinking water will be supplied through bore well and water supply of rest services will be managed through bore well and treated water through STP.

Sewer System

STP will be installed at site.

Drain

Rain water drains will be contracted as per architectural drawings and rain water harvesting system will be installed.

Parks

Parks have been constructed as per approved drawing.

Tree Planting

Tree plantation will be completed as per Architectrul drawing

Design For Electric Supply Including Street Lighting

All these work will be carried out as per architectural drawing

Community Buildings

Club House along with Community facilities Like , Party hall , Gym , Games Room , ETC. Have been constructed as per site

Treatment and Disposal System of Sewage and Sullage water

phythorid Technology STP will be constructed at site which will be duly Approve by Neeri

Solid Waste Management And Disposal System

Dalab Ghar will be constructed at site as per approval and nagar nigam would be responsible for lifting up solid wate from this dalab ghar

Water Conservation System

rainwater harvesting system with recharge pits will installed at site

Energy Management System Including Use of Renewable Energy

Not applicable

Fire Protection And Fire Safety System

Fire safety system as per approved drawing will be installed at site

Social Infrastructure And Other Public Amenities Including Public Health Services

not applicable

Emergency Evacuation Services

not applicable

Other Miscellaneous Work

Temple, Fountains, Childrens swings etc have also been provided at the site

Documents

Extract of Khatauni

No: 1422-1427 | Date: -

Details of Encumbrances

Commencement Certificate

Other Plan(If Any)

Proforma of Allotment Letter

Proforma of Conveyance Deed

Proforma of Completion Certificate(Occupancy)

Development Work Plan

Affidavit

CA CERTIFICATE

ARCHITECT CERTIFICATE

ENGINEERS CERTIFICATE

Details of Encumbrances

Uploaded: 13-02-2019

Commencement Certificate

Uploaded: 13-02-2019

Other Plan(If Any)

Uploaded: 13-02-2019

Proforma of Application Form

Uploaded: 12-01-2019

Proforma of Allotment Letter

Uploaded: 13-02-2019

Proforma of Conveyance Deed

Uploaded: 13-02-2019

Waste Disposal Plan

Uploaded: 12-01-2019

Water Supply Plan

Uploaded: 12-01-2019

Electricity Supply Plan

Uploaded: 12-01-2019

Development Work Plan

Uploaded: 13-02-2019

Affidavit

Uploaded: 07-03-2019

CA CERTIFICATE

Uploaded: 12-02-2019

ARCHITECT CERTIFICATE

Uploaded: 12-02-2019

ENGINEERS CERTIFICATE

Uploaded: 12-02-2019

Permits

Orignal Permit No: 1058/AB-1/SAY-DPR/2016 AND 4/BFT/SAMAJWADI/16-17
Orignal Permit Date28-10-2016
Valid Upto27-10-2021
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto27-10-2024
End Date31-12-2021
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)P K GUPTA
Contractor Address49, WEST SHIVAJI NAGAR, SHAHGANJ, AGRA.
Architect NameAR. TAPAN KUMAR
Architect AddressA-302, ADITYA CELEBRITIES HOMES, SEC-76, NOIDA.
Architect Licence NumberCA/2022/30011
Structural Engineer NameDR. SANTOSH KUMAR
Structural Engineer Address7/121 (B), THE Heritage Swaroop Nagar Kanpur
Mobile number(Project Co-ordinator)9837885425

Land Details

AFS

Showing 2 blocks with 9 units

Property Summary

Total Carpet Area

7797.60

83932.59 ft²

Total Units

108

1 different types

Blocks & Floors

2

7 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:72.20
Balconies:9
Parking ratio:0.00 per unit

Block NARMADA TOWER - 3

2 units

Block NARMADA TOWER-004

7 units

Khasra Details

Total Area

63000.00

678125.70 ft²

1 plot
Khasra
TypeKhasra
Khasra/Plot No8 to 14, 16 to 26, 42 to 53, 56, 1/5, 1/4, 6/2, 1/
Area(In Sq. Mt.)63000

Other Details

Contractor Name (if any)P K GUPTA
Contractor Address49, WEST SHIVAJI NAGAR, SHAHGANJ, AGRA.
Architect NameAR. TAPAN KUMAR
Architect AddressA-302, ADITYA CELEBRITIES HOMES, SEC-76, NOIDA.
Architect Licence NumberCA/2022/30011
Structural Engineer NameDR. SANTOSH KUMAR
Structural Engineer Address7/121 (B), THE Heritage Swaroop Nagar Kanpur
Mobile number(Project Co-ordinator)9837885425