NewActive

GANESH ENCLAVE PHASE 3

Jhansi, Uttar Pradesh
15-06-2023
Launch Date
New
Type
18-04-2028
Completion Date

Overview

Launch Date

Invalid Date

Completion Date

18-04-2028

RERA ID

UPRERAPRJ742447

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)36599
Project NameGANESH ENCLAVE PHASE 3
Registration Fee (in Rs.)188000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)59
DistrictJhansi
Original Start Date-
TehsilJhansi
Proposed Start Date15-06-2023
Sanctioning Competent AuthorityJhansi Development Authority
Project Cost (in Lacs)5625
Proposed Completion Date18-04-2028

Location

Latitude

25.485251

Longitude

78.600616

Bank Details

Account Details
Name of the AccountGREN GARDEN HOMES LLP COLLECTION ACCOUNT GANESH ENCLAVE PHASE 3
Account Number5311002100001112
Bank NamePUNJAB NATIONAL BANK
Branch NameKANPUR ROAD, JHANSI
Branch AddressKANPUR ROAD JHANSI
Branch StateUttar Pradesh
Branch DistrictJhansi
IFSC CodePUNB0531100
Separate Account Details
Name of the AccountGREN GARDEN HOMES LLP SEPARATE ACCOUNT GANESH ENCLAVE PHASE 3
Account Number5311002100001130
Bank NamePUNJAB NATIONAL BANK
Branch NameKANPUR ROAD, JHANSI
Branch AddressKANPUR ROAD, JHANSI
Branch StateUttar Pradesh
Branch DistrictJhansi
IFSC CodePUNB0531100
Transaction Account Details
Name of the AccountGREN GARDEN HOMES LLP TRANSACTION ACCOUNT FOR GANESH ENCLAVE PHASE 3
Account Number5311002100001121
Bank NamePUNJAB NATIONAL BANK
Branch NameKANPUR ROAD, JHANSI
Branch AddressKANPUR ROAD, JHANSI
Branch StateUttar Pradesh
Branch DistrictJhansi
IFSC CodePUNB0531100

Development Works

Demarcation of Plots

123 no. of duplexes will be constructed by developer as per sanctioned layout. Plots and gardens will be demarcated and constructed as per approved sanction layout passed.

Boundary Wall

The colony will be fully covered by boundaries wall and will be one gated colony

Road Work

Bitumen based road will be constructed as per approved layout map.

Footpaths

Footpath will be constructed as per colony requirements and needs.

Water Supply Including Drinking Water Facilities

Water will be supplied through boring and government water supply after taking approvals from statutory departments. Water tank will be constructed to store the water for colony consumption.

Sewer System

Centralized sewer system shall be provided. All sewerage water shall go to the township STP for treatment and treated water shall be recycled and it will be used in gardening and overflow from STP plant shall be connected with the township sewerage.

Drain

Storm water system shall be provided . storm water from roads and other landscapes area shall be connected to storm water drain channel and go to the rain water harvesting PIT for recharge the ground water and overflow shall be connected with township drain.

Parks

8 no of green park will be constructed as per approved layout. The colony will be covered by trees and gardens which will bring better standard of living for the people.

Tree Planting

Trees will be planted outside every house as well as all over the colony for better standard of living and fresh air.

Design For Electric Supply Including Street Lighting

Electricity supply will be designed as per guidelines issued by local electric department

Community Buildings

No community building is proposed for the said project as on the date as per approved layout passed by the competent authority.

Treatment and Disposal System of Sewage and Sullage water

All sewerage water shall go to the township STP for treatment and treated water shall be recycled and it will be used in gardening and overflow from the STP plant shall be connected with the township sewerage.

Solid Waste Management And Disposal System

Proper dustbins will be installed at designed layouts for collection of solid waste and disposal as mentioned in approved layout

Water Conservation System

A well designed water harvesting system will be constructed for water conservation

Energy Management System Including Use of Renewable Energy

Led lights and other energy saving devices will be installed in external areas. In STP all equipment shall have energy efficient motors.

Fire Protection And Fire Safety System

As per the department of NBFC Norms the house is less 30 meters of height therefore fire protection and safety work is not applicable for the said project

Social Infrastructure And Other Public Amenities Including Public Health Services

Sewerage , storm water and water supply system shall be provided. STP will be installed for reuse of treated water.

Emergency Evacuation Services

Not applicable on duplex houses.

Other Miscellaneous Work

As per approved layout

Documents

Registry Document

No: 8905 | Date: 24-08-2022

Registry Document

No: 9709 | Date: 07-09-2022

Registry Document

No: 9995 | Date: 13-09-2022

Registry Document

No: 12130 | Date: 14-11-2022

Registry Document

No: 116 | Date: 04-01-2023

Registry Document

No: 9413 | Date: 01-09-2022

Other Plan(If Any)

Details of Encumbrances

Uploaded: 15-06-2023

Commencement Certificate

Uploaded: 15-06-2023

Other Plan(If Any)

Uploaded: 15-06-2023

Proforma of Application Form

Uploaded: 15-06-2023

Proforma of Allotment Letter

Uploaded: 15-06-2023

Proforma of Conveyance Deed

Uploaded: 15-06-2023

Proforma of Completion Certificate(Occupancy)

Uploaded: 15-06-2023

Waste Disposal Plan

Uploaded: 15-06-2023

Water Supply Plan

Uploaded: 15-06-2023

Electricity Supply Plan

Uploaded: 15-06-2023

Development Work Plan

Uploaded: 15-06-2023

Affidavit

Uploaded: 15-06-2023

CA CERTIFICATE

Uploaded: 28-06-2023

ARCHITECT CERTIFICATE

Uploaded: 15-06-2023

ENGINEERS CERTIFICATE

Uploaded: 15-06-2023

Other

Uploaded: 15-06-2023

Permits

Orignal Permit No369/SEC./2022-23
Orignal Permit Date19-04-2023
Valid Upto18-04-2028
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto18-04-2031
End Date18-04-2028
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesNot Specified
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Gren Garden Homes LLP
Contractor Address184, Village- Marry, MLB Medical College, Jhansi, Uttar Pradesh 284128
Architect NameAnubhav Rastogi
Architect Address3rd Floor Lane no. 2, Chaman Vihar, GMS Road, Dehradun-248001
Architect Licence NumberCA/2013/58431
Structural Engineer NameEr. Shivam Jain
Structural Engineer AddressH. No. 135-136, Avas Vikas Colony, Roorkee, Haridwar 247667
Mobile number(Project Co-ordinator)9794452346

Khasra Details

Total Area

36750.00

395573.33 ft²

6 plots
Khasra
TypeKhasra
Khasra/Plot No246 M.
Area(In Sq. Mt.)3640
Khasra
TypeKhasra
Khasra/Plot No243, 244 M.
Area(In Sq. Mt.)6400
Khasra
TypeKhasra
Khasra/Plot No250 M.
Area(In Sq. Mt.)10890
Khasra
TypeKhasra
Khasra/Plot No244 M., 245, 246 M.
Area(In Sq. Mt.)1260
Khasra
TypeKhasra
Khasra/Plot No250 M.
Area(In Sq. Mt.)12140
Khasra
TypeKhasra
Khasra/Plot No254 M.
Area(In Sq. Mt.)2420

Other Details

Contractor Name (if any)Gren Garden Homes LLP
Contractor Address184, Village- Marry, MLB Medical College, Jhansi, Uttar Pradesh 284128
Architect NameAnubhav Rastogi
Architect Address3rd Floor Lane no. 2, Chaman Vihar, GMS Road, Dehradun-248001
Architect Licence NumberCA/2013/58431
Structural Engineer NameEr. Shivam Jain
Structural Engineer AddressH. No. 135-136, Avas Vikas Colony, Roorkee, Haridwar 247667