Launch Date
Completion Date
RERA ID
28.38.01.9 N
77.19.45.0 E
Sector-14,T.H.A,Near Shiromani Sahkari Awas Samiti,Kaushambi,Plot Area 4901.30 Sq.Mt.
Boundary wall on all sides with gates for entry and exit.
Cement Concrete Internal Road (CC Road Above the 2 Coarse of WBM)
NA
To be Provided by Ghaziabad Nagar Nigam and Storage will be done in underground water tank
Main Sewer line has been designed as per norms and running in basement ceiling and connected to STP
Underground pipe drain with chamber
Parks & Landscape will be designed as per authority guidelines.
Tree Planting will be designed as per authority guidelines
Design has been done as per UP electricity board guidelines
Club has been designed as per authority norms
STP 120 KLD will be installed
Door to Door Collection and disposal up to garbage point of authority
Recycling of treated water and rain water harvesting system will be provided
Solar panel will be provided as per norms at suitable place
System will be provided & functional as per fire department guidelines
Weekly doctor visits for health check up for all the construction workers
Emergency Lighting and periodic training for emergency evacuation will be provided by the security agency
NA
Showing 2 blocks with 80 units
Total Carpet Area
41499.20 m²
446693.24 ft²
Total Units
142
3 different types
Blocks & Floors
2
21 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
4901.30 m²
52757.10 ft²