Demarcation of plot will be done as per approved layout. The total number of plots are 59 Nos.
The boundary wall is in 3Mt. high that is built in 230mm thick brick wall in first class brick work with providing column in every 4Mt. beam, expansion.
Internal Road is 15m, 12m, 9m, wide joint All roads are ACC with proper compaction.ready mixed concrete will be used which is manufactured in fully automatic batching plant abd designed upto 100 mt load capacity.
1.5m wide and 2m wide pedestrians are provided.foothpaths provide an excellent opportunity for exercise as well as movement. Foothpaths can be used as decorative cycle paths, running paths, and many others . As such, these foothpath need to be designed with access in mind . they must also be durable, safe and easy to maintain.
Water Supply will be provided by the developer through over head water tank.All water supply pipes elbows tee, socket etc.
STP(sewerage Treatment Plant) has been proposed by developer.
Providing and laying cast in site ACC Drain, storm water lines will be provided by the developers along with road.
Parks are the gathering speces for the entire neigborhood. As a result , more people spend their time in the park. cut grass and manicured trees give attention to the people.
Plantation will be done by the developer as per layout. Tree planting is cost - effective , thus making it simple to achieve the goal of making the earth a safer place by making it free from polution. The effects of climate change can also be controlled by increasing the rate of tree plantation.
Street lightings will be laid along the road. The distance between street lighting will be 15-20m. Electrical substations will be there.
N/A
STP system proposed by the developer for the treatment and disposal system of sewage and sullage water. sewer lines are around 150-300 mm.
Solid waste management and disposal system will be done by developers.All drain pipes and rain water pipe ISI marked and all pvc fitting to be of ISI marked. Gully traps and main hole as per detail drawing.
Rain water harvesting tank will be constructed by the developer. It is used to transport the harvested water from the catchment to the recharge zone. it improves the quality and quantity of ground water. It maintain is very imp to maintain water level.
N/A
N/A
N/A
N/A
To be done as per approved layout
Showing 1 blocks with 2 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
38598.49 m²